• 제목/요약/키워드: Pre-project planning

검색결과 83건 처리시간 0.027초

임상간호현장에서의 실행연구 여정 (A Journey to Action Research in a Clinical Nursing Context)

  • 장금성;김희영;김은아;김윤민;문정은;박현영;송미옥;백명
    • 간호행정학회지
    • /
    • 제19권1호
    • /
    • pp.95-107
    • /
    • 2013
  • Purpose: The purpose of this study was to examine the effectiveness of Action Research (AR) approach in nursing. Methods: Participants were 64 perioperative nurses recruited from C hospital in Gwangju, Korea. The nurses were engaged in the project through 2 cycles of planning, acting, observing, and reflecting. A mixed-methods design was used to examine changes in participants and their knowledge management practice. Quantitative data were analyzed using SPSS 20.0 program and qualitative reflection data underwent content analysis. Results: During the project, participants developed standardized pre-operative checklists and opened an Internet Cafe to better manage their perioperative nursing information. At the end of the project, there was a significant increase in nurses' knowledge management (p=.015) and the rate of surgical material prescription errors decreased from 8.0% to 2.9%. Core AR project team members' teamwork skills and organizational commitment increased significantly (p=.040, p=.301, respectively). The main themes that emerged from the qualitative data were learning how to solve problems in practice, facilitating team activities through motivation, barriers of large participation, and rewarded efforts and inflated expectations. Conclusion: The AR project contributed to empowering participants to solve local problems. AR is a useful methodology to promote changes in practices and research participants.

PSC Beam교 환경부하량 추정을 위한 인공신경망 모델 적용 연구 (Application of Artificial Neural Network Model for Environmental Load Estimation of Pre-Stressed Concrete Beam Bridge)

  • 김의왕;윤원건;김경주
    • 한국건설관리학회논문집
    • /
    • 제19권4호
    • /
    • pp.82-92
    • /
    • 2018
  • 건설사업 초기단계가 환경부하량의 절감 가능성에 큰 영향을 미친다는 것을 감안한다면, 효과적인 의사결정을 지원할 수 있는 시스템을 초기에 구축하고 활용하는 것이 중요하다. 이에 본 연구에서는 기본적인 설계 요인들을 고려하여 초기 설계단계에서 활용될 수 있는 환경부하량 산정 모델을 구축하였다. 이 모델은 인공신경망 기법을 활용하고 설계단계 업무가 진행됨에 따라 얻을 수 있는 가용정보 수준을 고려하여 기획단계 적용 모델(ANN-1)과 기본 설계단계 적용 모델(ANN-2)로 구분하여 환경부하량을 산정하도록 구축되었다. 모델의 실험결과 ANN-1, ANN-2모델의 절대평균오차율과 표준편차는 각각 11.19% / 5.30% 및 9.59% / 3.09%로 높은 신뢰성을 갖는 것으로 나타났다. 본 모델은 프로젝트 초기단계별 기초적인 가용정보만을 활용하여 신속하고 정확하게 환경부하량을 추정하고 합리적인 의사결정을 지원할 수 있을 것으로 기대된다.

ei-Rail을 활용한 노선설계 모형의 적용 및 중앙선/서해안선 사례분석 (Implementation and Analysis of Railway Design Model using ei-Rail with Joong-Ang and Seo-Hae Lines)

  • 신영호;김정현;오지택
    • 대한토목학회논문집
    • /
    • 제35권2호
    • /
    • pp.407-415
    • /
    • 2015
  • 철도사업을 추진함에 있어, 지금까지 대부분의 사업은 노선과 선형계획은 엔지니어가 현장 사전조사 결과 및 지형도 등을 이용하여 한정된 수의 대안을 설정하여 분석하는 방식으로 수행되어 왔다. 본 연구에서는 유전자 알고리즘을 이용한 지능형 철도선형계획 프로그램(ei-Rail)을 개발하여, 가능한 모든 대안에 대하여 선형요소 및 공사비에 대한 평가를 가능하게 하였다. 그리고 기존에 계획된 노선에 대한 비교 평가를 통하여 기존 대안보다 사업비를 절감할 수 있을 뿐만 아니라, 이에 소요되는 비용과 시간도 단축할 수 있는 것으로 나타났다. 본 연구의 결과는 향후 국내외 철도사업 계획 수립에 소요되는 비용과 시간, 그리고 전체 사업비 절감을 가능케 함으로써 철도분야 발전에 도움이 될 수 있을 것으로 기대할 수 있다.

도시계획과 환경영향평가 제도의 통합적 접근을 통한 시민 참여 확대 방안: 케냐 ODA 사업 사례를 바탕으로 (Integrating Urban Planning and Environmental Impact Assessment for Enhancing Citizen Participation : Focusing on Official Development Assistance Project in Kenya)

  • 염재원;하동오;정주철
    • 환경영향평가
    • /
    • 제29권5호
    • /
    • pp.338-349
    • /
    • 2020
  • 도시계획 분야에서 시민 참여에 대한 중요성이 대두되고 있다. 시민 참여는 이해관계자들에게 다양한 영향을 미치는 사회·정치적 담론에 시민들을 참여시키고 의사결정 과정에서의 영향력을 행사할 기회를 제공하는 것이다. 과거 도시계획 분야에서는 도시계획가들의 합리성에 의존하였던 합리적 계획모형을 고수하였으나 최근에는 시민 참여 확대를 통한 도시계획으로 전환기를 맞고 있다. 실제로 도시계획에 대한 비전 수립단계에서의 시민 참여는 일상화되어 서울, 부산, 대구 등 광역자치단체에서 실시하고 있다. 그러나 여전히 도시계획과정 전반에서 시민 참여가 제한되고 있다는 비판들이 있으며 특히 계획 수립 이전 단계에서의 시민 참여가 부족하다는 문제점이 제기되고 있다. 이에 따라 도시계획 과정 전반에 걸친 시민 참여를 보장하는 제도의 필요성이 지속해서 제기되고 있다. 이러한 문제를 극복하기 위해 해외에서는 도시계획과정에 환경영향평가를 통합하여 시민 참여를 제도화함으로써 도시계획 과정 전반에 대한 시민 참여 기회를 확대하여 계획의 지속가능성을 증진시키고 있다. 특히 환경영향평가는 사업의 대상지 지정 단계에서 부터 시민 참여를 적극적으로 유도하여 문제점들을 미리 파악하고 이에 대비하는 방안을 제시하고 있다. 다만 국내 환경영향평가는 개별 필지 단위로 수립되는 도시계획사업 단위 위주로 진행되고 있어 포괄적인 계획에서 지속가능성을 확보하는 데에는 한계가 있다. 따라서 환경영향평가를 활용한 통합적 접근법을 통해 시민 참여를 확대하고 지속가능성을 확보하기 위해서는 포괄적인 도시계획 차원의 환경영향평가가 필요하다. 본 연구는 도시계획사업 보다 포괄적인 범위 및 내용으로 실시된 영향평가 사례인 케냐 코춀리아 다목적 댐 건설 공적개발원조 사례를 연구하여 도시계획 과정에 확대된 영향평가제도 도입방안을 도출하고자 하였다.

3차원 모델을 통한 설계정보의 효과적 활용방안에 관한 연구 (A Research on Effective Use of Three-Dimensional Models for Architectural Planning and Design)

  • 정례화
    • 한국실내디자인학회논문집
    • /
    • 제29호
    • /
    • pp.273-280
    • /
    • 2001
  • In architecture, each project participant must maintain organic relationship with others. However, current practices are rather procedural and discrete than organic, which result in considerable inefficiencies. The cool-downs of Korean construction market also force the architects to be familiar with the new construction methods and systems. This research mainly focuses on the pre-development stage of such systems, analysing relationships between the information of architectural design and other parts of construction information like structure, construction, environment, and so forth. The result of analysis can be organized into attributes of members in a physical building, which can be modeled in a 3D system. The resulting model can be used for automated generation of drawing, Bill of Materials, finite element meshes for structural analysis and energy analysis, etc. by extracting meaningful information from it. Hence, the purpose of this research is to analysis the relationship among domain-specific information (e.g. structural engineering, construction detail, energy evaluation) that are represented in drawings, and to represent the attributes of the information relevantly so that they can be applied to each unit task that forms the whole project. Therefore, an object oriented methodology is introduced to compose design informations in three dimension, and expressing properties of building factors and materials, and to construct a database for computers to recognize architecture informations.

  • PDF

건설현장에서 안전재해예방을 위한 발주자의 안전관리 역할 (A Study of Client's Role for Safety Management at Construction Sites)

  • 임지영;한갑규;김선국
    • 한국건축시공학회지
    • /
    • 제8권5호
    • /
    • pp.75-83
    • /
    • 2008
  • Larger and more sophisticated building construction requires more input resources such as worker, materials and devices. Growing resource volume brings risks at a construction site. The industry makes an effort to protect probable incidents at the site by organizing a safety management team. conducting a safety instruction and etc, but losses especially in the construction are higher than other industries. Major reason is that the safety management program is conducted only at the step of construction work and a root cause is not eliminated. Conventionally a concerned party shifts the blame to other parties such as constructor and site workers who are direct participants in the construction site. However, the whole causes of incidents go to the all subject of the construction not only the constructor but the client, designer and others related in the construction, and especially the clients are heavily involved in general concerns of the project. Therefore, this study is defined the role of the clients in nations and domestic condition of construction safety management is investigated. And it is analyzed surveys to prevent incidents at construction sites, and suggested the role of the clients which is classified pre and post construction, and in the middle of construction, and also categorized planning and design & construction schedule especially for the pre-construction level.

환경영향평가 내용의 문제점과 개선방안 -문화재항목의 영향평가를 중심으로- (A Study on the Improvement and Problems of Environmental Impact Assessment)

  • 성현찬;안동만
    • 한국조경학회지
    • /
    • 제21권2호
    • /
    • pp.91-106
    • /
    • 1993
  • The objective of this study is to prepare a proposal for desired changes in the laws and regulations system of the Environmental Impact Assessment (EIA) about cultural assets preservation. The related Korean regulatory system and literature for EIA have been surveyed and case studies have been analyzed and actual cases where cultural assets protection were of issue have been studied to deduce the problems of those areas. Based on the result of this study, proposed changes are as follows; 1. "Status of cultural Assets" is to be included as common assessment factor for all categories of object projects in "Table 2: Essential Assessment Factors for Individual Project Category" of "Ordinance for Preparation of EIA Statement, etc." 2. "Status of Underground Cultural Assets and Potential Underground Cultural Assets" is to be inserted as a survey factor in "Table 3:Format of and Instruction for Impact Statement". 3. The clause of "-- the survey should be performed on-site and the investigation report should be submitted." is to be inserted in methods of survey in "Table 3". 4. Ground survey of cultural assets should be performed prior to completion of project planning, that is, from the stage of pre-study for site selection. 5. The application of impact abatement from "Methods and Plants for Impacts Abatement" of "Report for Development of EIA Statement Technologies" should be included, with proper modification of timing, in "Ordinance for Preparation of EIA Statement, etc." 6. The expense liability clause in "Cultural Assets Preservation Act" is to be revised as "a certain ratio of expenses for excavation should be borne by the government." 7. Regulatory device for collecting appropriate opinions should be established. It may include Cultural Assets Preservation Committee's hearing to the project owner's opinion. be established. It may include Cultural Assets Preservation Committee's hearing to the project owner's opinion.

  • PDF

SAF를 위한 자동계획기법 구현 사례 (Case of Implementation of Automatic Planning for SAF)

  • 김정윤;최대회;이상진;정성훈
    • 한국시뮬레이션학회논문지
    • /
    • 제23권4호
    • /
    • pp.171-180
    • /
    • 2014
  • 본 연구는 모의개체로 하여금 동적행위연결을 통한 목적지향 행위계획을 수행토록 하는 기법의 구현사례로서 재계획기법을 소개한다. 기존의 행위처리기법, 특히 Semi-Automated Forces (SAF)에서는 모의 초기에 주어진 정해진 계획을 단순히 수행하는 수준에서 크게 벗어나지 않는다. 따라서 인간의 판단 같은 예측불허 상황이 발생하는 (Human in the loop) 모의에서 기존 기법은 상황대처에 미흡하다. 또한 그러한 기법은 돌발상황 대응을 위한 광범위한 경우의 수를 고려하다보면 행위조합 폭증 문제를 겪을 수 있으며, 그러한 조합이 상황에 부합하지 않을 수 있다. 재계획기법은 역전파(back-propagation)를 활용, 목표달성을 위해 필요한 행위들을 검색, 연계하는 자동계획기법 구현사례이다. 이 기법은 행위에 태그(pre/post-conditions)를 부여, 동적으로 행위들을 연결한다. 본 논문은 기법의 실효성 입증을 위해 국방분야의 연구과제에 적용된 성과를 소개한다.

프로젝트 기획 단계의 의사결정 지원을 위한 3D 단위 공간 객체 적용 방안에 관한 기초 연구 (A Basic Study for the implementation of 3D unit space objects in the pre-design phase for decision making support)

  • 함남혁;김주형;이윤선;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.864-867
    • /
    • 2007
  • U-City건설 사업, 행정중심복합도시 건설 등 최근 도심 개발 사업이 대형화되고, 복합화되고 정보 인프라의 증가로 인하여 건설 산업이 정보화, 첨단화되면서 프로젝트의 기획단계의 중요성이 나날이 증가하고 있다. 최근 건설 분야에서 3D CAD 및 GIS 기술과의 융합 등 IT를 접목한 컨버전스를 통해 실제 건축물을 구축하기 전 건설 사업 단계별로 미리 시뮬레이션을 통해 의사결정을 지원할 수 있는 애플리케이션이 활발히 개발되고 있다. 하지만 프로젝트의 초기단계인 기획단계의 경우에는 업무의 특성상 전문가의 경험에 의존하는 경향이 있고, 행정적인 업무를 수반하기 때문에 IT기술을 활용한 어플리케이션을 적용하는 데 있어서 한계를 가지고 있다. 따라서 기획단계의 의사결정 지원을 위해 최근 이슈화되고 있는 3D CAD 데이터에 기획 단계에서의 설계요소 정보, GIS 기술을 연계하여 프로젝트 초기 단계인 기획단계의 업무 효율을 향상시킬 수 있는 방향을 제시하고자 한다.

  • PDF

초고층 주상복합 아파트의 연돌효과 특성에 관한 연구 -D 프로젝트를 중심으로- (A Study on the Stack Effect Characteristics in High-Rise Apartments)

  • 최동탁;손원득;최영식
    • 한국산업융합학회 논문집
    • /
    • 제14권1호
    • /
    • pp.37-43
    • /
    • 2011
  • Study of stack effects in the early design stage is the most appropriate moment to draw any problems and provide the right solutions. However, In a real process, The pre-design planning stage review is not thoroughgoing enough to high-rise construction site. Therefore, this study has reviewed by selecting one of inappropriate project [D] to find the possible stack effect alternatives in an early design documentation stage and provide countermeasures to be a foundations of stack effect in the construction stages.