CONSTRUCTION PROJECT CLAIM MANAGEMENT

  • M. ASLAM MIRZA
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.160-168
    • /
    • 2007
  • Conflicts of interest and independent agenda of the parties brought together for implementation of a construction project often leads to dispute in Contract and claim situations. Construction Industry is notorious for claim that is managed on its arising and there lacks an endeavor to minimize the breeding grounds through efficient planning and alignment to purpose, of all contract-documents. There failure of a concerted effort entails wastage of resources, delayed completion of facilities and stained relationships of parties when collide in mistrust in contract to win over the other. There needs a focus on the claim breeding issue and establish an effective mechanism to deal with disputes in urgency. Claim occurs mostly during the construction phase. But the seeds of claim and nutrients essential for development are contained in the contract documentation and the information supplied or not in pre-contract phase. Opportunity to prevent nutrients for seed of Claim comes to an end once tender-documents are finalized, the contract is awarded and established or not a mechanism for dealing with claim situation. The processes presented here would help in minimizing the breeding grounds and emergence of disputes during progression of works and dealing with eventualities in forceful manners for finding a resolution most effectively in relevant time.

  • PDF

IPA를 활용한 해외 건축 사업 PMC 분야 단계별 업무역량 분석 (An Analysis of Competency at Each Phase of PMC for Overseas Architecture Project Using the IPA)

  • 하성욱;이석원;김재준
    • 한국건설관리학회논문집
    • /
    • 제16권3호
    • /
    • pp.59-67
    • /
    • 2015
  • 국내 건설업체의 해외건설 진출은 최근 10년간 급성장 하였지만 단순도급형 사업과 EPC사업에 주력한 결과 매출액 대비 순이익률은 2007년 6.4%를 기점으로 줄어들어 2012년에는 불과 0.5%만을 기록하였다. 이에 국내건설 업체는 선진 업체가 독점하고 있는 고부가가치 사업인 PMC(Project Management Consultant)분야로 방향 전환을 시도하였으며 몇 년 동안 경험 및 시장 경쟁력을 높이고자 국내 건설업체는 16개의 건축 토목 PMC 관련 사업(용역)을 진행하였다. 하지만 대부분이 토목분야로 진출을 하고 있어 해외 건축사업 PMC분야 진출을 위해 단계별 세부업무 역량의 중요도 및 현재 역량수준을 알아보고 IPA를 이용하여 분석하였다. 계획단계에서의 중요도 대비 현재역량 수준 Gap값이 가장 크고, 다음으로 Gap값이 크게 나타난 건설이후 단계로 나타났다. 특히 계획단계에의 세부업무역량수준을 우선적으로 강화해야 될 것으로 판단된다. 본 연구에서 도출된 분석결과를 통해 해외건축사업 고부가가치 영역인 PMC분야 업무에 향후 국내 건설업체의 진출을 위해 강화해야할 업무역량에 대한 업무항목 및 역량수준파악을 위한 기초 자료로 활용 될 것으로 기대된다.

Application of Parameters-Free Adaptive Clonal Selection in Optimization of Construction Site Utilization Planning

  • Wang, Xi;Deshpande, Abhijeet S.;Dadi, Gabriel B.
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권2호
    • /
    • pp.1-10
    • /
    • 2017
  • The Clonal Selection Algorithm (CSA) is an algorithm inspired by the human immune system mechanism. In CSA, several parameters needs to be optimized by large amount of sensitivity analysis for the optimal results. They limit the accuracy of the results due to the uncertainty and subjectivity. Adaptive Clonal Selection (ACS), a modified version of CSA, is developed as an algorithm without controls by pre-defined parameters in terms of selection process and mutation strength. In this paper, we discuss the ACS in detail and present its implementation in construction site utilization planning (CSUP). When applied to a developed model published in research literature, it proves that the ACS are capable of searching the optimal layout of temporary facilities on construction site based on the result of objective function, especially when the parameterization process is considered. Although the ACS still needs some improvements, obtaining a promising result when working on a same case study computed by Genetic Algorithm and Electimze algorithm prove its potential in solving more complex construction optimization problems in the future.

초기 단계 프로젝트 특성을 고려한 리스크 평가 및 예측 툴 개발 (Risk-Based Performance Evaluation and Prediction Tool by Characterizing Construction Projects in Pre-Project Planning)

  • 신강용;차희성
    • 한국건설관리학회논문집
    • /
    • 제9권5호
    • /
    • pp.168-175
    • /
    • 2008
  • 국내 건설 프로젝트에서 발생되어지는 불확실한 리스크 요소에 의해서 발주자와 시공자의 비용적인 이익이나 프로젝트의 성패는 큰 영향을 받기 마련이다. 따라서, 프로젝트 초기단계에서 발생가능한 리스크를 파악함으로 인해서 합리적인 관리나 대처방안을 모색할 수 있는 정량화된 리스크 평가방법의 필요성이 제기되고 있다. 기존의 연구에서도 리스크 파악 시 사업단계별 혹은 공사단계별로 세분화된 평가방법론이 개발되었으며, 이를 정량화시키려는 시도 또한 상당부분 이루어졌다. 그러나, 리스크에 대한 평가 결과와 최종 프로젝트의 성패와의 연관성에 대한 파악은 쉽지 않은 것이 사실이다. 이에 본 연구에서는 선행 연구 및 문헌 조사를 바탕으로 국내 건설 프로젝트에서 발생되어지는 비용성과 리스크를 바탕으로 리스크 정량화 평가 방법론을 제시하고자 한다. 본 연구는 선행연구에서 도출된 비용성과 리스크를 통해서 정량화 된 리스크 평가분석 툴(tool)을 제시하고자 한다. 본 연구에서 개발된 리스크 평가 툴은 사업 초기 프로젝트에서 리스크 요소들의 파악을 용이하게 하며, 리스크 요소에 대한 정량적인 평가분석을 가능하게 할 뿐만 아니라, 발주자나 시공자 측의 의사결정자에게 프로젝트 리스크 정도에 따른 합리적인 대응방안 모색 시 효과적인 도구의 역할을 할 수 있을 것으로 기대한다.

가상 건설 시스템 개발 현황과 비전 (The Present Status and Vision of Virtual Construction System Development)

  • 김재준;최철호;신현목;진상윤;이광명
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.170-175
    • /
    • 2008
  • 가상건설시스템 개발연구단은 국토해양부와 한국건설교통기술평가원의 지원 하에 설립되었다. 본 연구단은 건설프로젝트의 생산성 향상, 고 부가가치 사업 창출, 해외건설시장에서의 경쟁력 확보라는 목표를 가지고 연구를 수행 중에 있다. 가상건설 시스템은 건축물의 전 생애주기에서 발생되는 정보를 효과적으로 공유할 수 있도록 3D 및 정보 기반의 설계, 엔지니어링, 건설관리 업무를 지원하게 된다. 위의 목표를 달성하기 위해서 연구단은 가상건설시스템 하위에 다양한 기능을 수행하는 모듈들을 개발하는 데에 연구의 초점을 맞추고 있다. 첫째, 3D 기반 구조 설계 설비 및 견적시스템 개발이다. 둘째, 가상현실 기법을 활용한 기획단계에서의 프로세스 시뮬레이션 및 사업성 분석 시스템 개발이다. 셋째, 건설프로젝트에서 다루어지는 모든 정보를 관리할 수 있는 CPLM(Construction Project Life-cycle Management)을 개발하는 것이다. CPLM은 3D 기술과 정보 기반 협업을 통한 의사결정 지원 시스템이다. 이와 같은 본 연구단의 최종목표에 도달하기 위하여 2차 년도에 가상건설 프로토타입 시스템을 개발 완료하였고, 3차 년도 가상건설 시스템의 각 모듈 완성 및 시스템 통합을 목표로 연구를 진행하고 있다. 본 연구는 향후 건설산업에서 필수개념으로 자리잡게 될 BIM의 국가적 차원의 연구라는 점에서 시사하는 바가 크다고 할 수 있다.

  • PDF

메가프로젝트 사업초기단계 사업기간 예측 방법에 관한 연구 (A Study of Construction Duration Predicting Method for Mega Project)

  • 우유미;이승훈;이희덕;서용칠
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.597-600
    • /
    • 2008
  • 최근 국내에서 도심재생을 위한 입체복합공간 개발사업으로 여러 메가프로젝트가 수행중이지만, 메가프로젝트 실적 자료 및 경험, 기술부족으로 인해 여러 가지 문제점들이 드러나고 있다. 다양한 유형의 프로젝트들로 구성된 입체 복합공간 개발 사업에서 프로그램 및 프로젝트 수준으로 메가프로젝트를 관리할 수 있는 기술이 요구된다. 메가프로젝트는 다년간에 걸쳐 수행되는 사업으로 사업기간 예측과 그에 따른 공정관리가 무엇보다 중요하다. 따라서 메가프로젝트 특성에 맞는 프로그램레벨에서의 공정관리 기술 개발이 필요하다. 본 연구에서는 공정관리 기술개발의 선행연구로 사업초기단계 사업기간 예측 및 일정 계획 방법에 대해서 제시하였다. 먼저 과거 수행된 단일시설 및 복합시설의 프로젝트 속성정보와 설계 및 공사기간의 일정데이터를 수집하여, 프로젝트 기간 예측을 위한 DB의 개발방향을 제시하였다. 그리고 메가프로젝트 사업초기단계 사업기간 예측 시 영향을 미치는 발주자의 요구사항과 사업비 투입계획에 따라 시나리오를 개발하여 사업기간 예측 방법에 대해 제시하였고, CCPM을 통한 사업기간 단축가능성을 제시하였다.

  • PDF

농촌보건사업지역(農村保健事業地域)의 아동영양(兒童營養) 실태조사(實態調査) (Child Nutrition Survey in Rural Health Project Areas)

  • 박명윤;장영자;서정숙;모수미
    • Journal of Nutrition and Health
    • /
    • 제13권1호
    • /
    • pp.15-26
    • /
    • 1980
  • The main purposes of the nutrition and clinical surveys were to provide baseline information on the nutritional status of pre-school children in rural health demonstration project areas of the Korea Health Development Institute (KHDI) for nutrition guidance services for the MCH target group. The survey covered a total of 222 pre-school children and 135 mothers in Okgu Gun, Cholla Pukto Province from August 10 to August 17, 1979. The survey results are summarized as follows: 1) Family Environment Seventy percent of the households had more than three children, and the mean family sire was 6. Sixty-nine percent of the mothers and 47% of the fathers of the surveyed households were educated at or below the primary school level. The majority, 70% of the mothers, were aged between 20 years and 35 years. 2) Anthropometric Measurements and Hemoglobin Value 4.5% of the children were lower than 80% weight for age of the Korean standard, and 5.4% were lower than 85% arm circumference for age of the Jelliffe's standard resectively, and those were suffering from protein-energy malnutrition. Angular stomatitis were observed on 66.2% of the subjects. Mean hemoglobin value was 11.1g/100m1, and 44.2% of the subjects were categorized as anaemia. 3) Food and Nutrient Intake of animal foods was very low, ranging from 2.9 to 17%. Consumption of eggs was less than 2% of total food intake, and intake of legumes was also very scanty, between 0.8 to 3.7%. These data present evidence of very poor protein intake, quality as well as quantity. Energy intake of children was 60.0 to 64.4% of the recommended allowance, and mean protein intake only met 47.4% of the recommendation. Low intake of vitamins except thiamin were also found. 4) Mother's Nutrition Knowledge Eighty-five percent of the mothers were entirely ignorant regarding the 'five basic food group' which is most important fact on food and nutrition guidance. Mean knowledge score from 14 basic questions about food and nutrition was as low as 5.1. There was a significant positive correlation between mother's educational level and nutrition knowledge score. 5) Family Planning Variable There were significant correlation among maternal, family planning variables, and some of the nutritional and physical measurements. The study revealed that the mother's educational level and nutrition knowledge score are more crucial factors than the family planning variables on effecting food intakes on children. Recommendation : According to the results of the surveys, there were high incident rates of nutritional anaemia and angular stomatitis among pre-school children, and most of rural women had very limited knowledge about food and nutrition. As a main part of the health education activities, the community health workers should provide nutrition education to the village mothers to improve the nutrional status of young children in rural areas. Nutrional promotion at the primary health care level should be mainly based on appropriate nutrition education.

  • PDF

도시첨단산업단지 입지선정을 위한 계획요소 도출: 노후산업단지 재생을 중심으로 (Development of Site Selection Planning Factors for Urban High-tech Industrial Complex: Focused on Old Industrial Complex Regeneration)

  • 박광진;이명훈
    • 한국콘텐츠학회논문지
    • /
    • 제20권5호
    • /
    • pp.595-608
    • /
    • 2020
  • 이 연구는 노후산업단지를 도시첨단산업단지로 조성하기 위한 계획요소를 도출하기 위해 도시첨단산업단지 조성의 문제점과 혁신체계이론, 외부효과이론을 바탕으로 핵심 계획요인을 선정하고, 델파이 조사를 통하여 최종 입지선정 계획요소를 도출하였다. 연구결과 노후산업단지 재생의 장점을 최대한 활용하여 조성사업의 효율성을 높일 수 있는 효율성 관련 계획요소, 산업단지 분양률과 경쟁력을 강화하기 위한 기업수요 요인 관련 계획요소, 입주기업의 인적자원을 유지하여 지식의 축적과 활용을 촉진하기 위한 근로자 관련 계획 요소, 인접지역과의 연계성 강화를 통한 협력적 관계형성을 위한 계획 요소 등 총 4개 영역에서 19개의 최종 요소가 도출 되었다. 이러한 계획요소들은 도시첨단산업단지 조성의 문제점으로 나타난 분양률 저조와 개발 불균형에 따른 지역 내 갈등 해결 및 지역 혁신체계 구축을 통한 지역 경제 활성화에 도움이 될 것이다.

고층사무소 프로젝트의 시공성 항목 분석에 관한 기초연구 (A Preliminary Study on the Analysis of Constructability Issues in High-Rise Office Buildings)

  • 권동혁;김한수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.235-238
    • /
    • 2002
  • 현대 산업사회의 과학기술 발달과 인구집중으로 인하여 기업의 경영조직 업무내용의 확대와 질적 변화에 의해 사무소 건축이 대형화, 고층화되어지고 있다. 특히 수많은 주체들과 분야들로 이루어진 고층사무소 사업을 수행하기 위해서는 사업 각 단계별 주요 정보에 대한 확실한 이해와 경험을 바탕으로 프로젝트 전 과정의 통합관리가 필요하다. 또한 건축계획 구조, 재료 및 시공성(Constructability)의 각 분야별 요소기술들이 효율적이고도 유기적으로 연결${\cdot}$접목되어야 한다. 그러나 설계와 시공간의 상호 인터페이스의 미비로 인한 설계와 시공업체 간의 노하우가 유기적이고 체계적으로 공유되고 있지 못하고 있으며 고층사무소 사업의 시공단계에 있어서 반복적인 문제점이 되풀이되고 있는 실정이다. 이에 본 연구에서는 고층사무소 사업의 시공성을 고려하지 않은 설계로 인해 골조공사의 시공단계에서 유사하게 반복적으로 되풀이되어 발생하고 있는 주요항목들을 파악하고 분석하여 해당 순위를 제시하고자한다.

  • PDF

A STUDY ON DURATION ESTIMATE METHOD USING STOCHASTIC MODEL IN THE BIM ENVIRONMENT

  • Jae H. Park;Seok H. Yun;Joon H. Paek
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1209-1215
    • /
    • 2009
  • Recently, Construction Projects are being much bigger and more complex. So the importance of Construction Planning and Management is increasing and increasing because of the Construction Projects is involved in a variety of construction-related subjects. Competitive of the Construction Industry decided Cost, Construction Duration and Productivity. But they were just focused on Cost Saving instead of Construction Duration and Productivity. However, they have to finish construction projects using minimum cost and duration with quality and function of required level for successful Construction projects. Thus, current high exchange rate and high period, it is clear to decrease construction cost and to do economic construction in huge Construction Projects and it means more advanced Construction Schedule Management needs for economic construction. But Construction Scheduling Planning, basic of Construction Schedule Management, adjusted contract period without Pre-Planning, just depending on experience and ability of Construction Engineer. Because of that, this study suggests new Duration Estimate Method using Stochastic Model in BIM Environment for advanced Construction Schedule Management. Existing Duration Estimate Methods are just modified wrong points of them or analyzed effective factors of construction schedule. However, New Duration Estimate Method is just consists of Stochastic Model and BIM Environment without existing Duration Estimate Methods. So, new method has creativity and specialty. After this research, it would be a great model in construction industry field.

  • PDF