A project planning is one of the most important processes that determines success and failure of the project. A pre-project planning is also essential job for information system implementations at the early stage of project planning, especially for management information system like ERP. However, pre-project planning is very difficult, because lots of factors and their relationships should be considered. Pre-project planning of ERP implementation has been done by project manager's own knowledge and experiences. In this article, we propose a system that help project manager to make a pre-project plan of ERP project with case-based reasoning(CBR) framework. The proposed CBR system saves previous cases of ERP pre-project planning in the case base. Then, the system finds the most similar case with the current pre-project planning problem. Project manager can make a pre-project plan by adjusting the most similar case. From the interview with project managers, we collect some field cases of ERP implementation. We organized these cases by using XML(Extensible Markup Language), which is good for representing hierarchical information. XML gives us some flexibilities to correct and maintain cases. We make a prototype system, PPSS(Project Planning Support System) that help project manager to make a pre-project plan of ERP implementations. The object of the system is to support project manager to make a pre-project plan of ERP. We hope the result of the study can be applied to other information systems. Our research would be extended to cover other stages of project planning.
A project planning is one of the most important processes that determines success and failure of the project. A pre-project planning is also essential job for information system implementations at the early stage of project planning, especially for management information system like ERP. However, pre-project planning is very difficult, because lots of factors and their relationships should be considered. Pre-project planning of ERP implementation has been done by project manager's own knowledge and experiences. In this article, we propose a system that help project manager to make a pre-project plan of ERP project with case-based reasoning(CBR) framework. The proposed CBR system saves previous cases of ERP pre-project planning in the case base. Then, the system finds the best similar case with the current pre-project planning problem. Project manager can make a pre-project plan by adjusting the most similar case. From the interview with project managers, we collect some field cases of ERP implementation. We organized these cases by using XML(Extensible Markup Language), which is good for representing hierarchical information. XML gives us some flexibilities to correct and maintain cases. We make a prototype system, PPSS(Project Planning Support System) that help project manager to make a pre-project plan of ERP implementations. The object of the system is to support project manager to make a pre-project plan of ERP. We hope the result of the study can be applied to other information systems. Our research should be extended to cover other stages of project planning.
The purpose of this study was to analyze the affecting factors on male salary workers' pre-retirement plans and pre-retirement planning programs. The focus was on male workers' pre-retirement plans and programs for economy, housing, family relationship, leisure and health care in their elderly life. The major findings were as follows: First, the salary workers estimated their level of economic and health problems among their elderly life as relatively high. Second, the major factors affecting the level of planning for post-retirement were salary workers' age, job satisfaction, and reserved savings for their elderly life. Third, the major affecting factors on participation in pre-retirement planning programs were age, educational attainment, and spouse's job status. From these findings, it can be concluded that salary workers' level of pre-retirement planning and the needs of pre-retirement planning programs differed from their personal characteristics and preferences. Also, salary workers' characteristics related to job and retirement had more important effects on their pre-retirement planning than economic status.
As teachers' competency is evaluated based on their teaching performance. pre-service teachers need to have an opportunity to reflect on themselves by systematically analyzing and evaluating their own lesson planning and teaching performance through self-assessment. In this study, we aimed to examine what evaluation criteria for lesson planning and teaching performance pre-service mathematics teachers consider in the process of self-assessment. This study used a mixed-methods research design. To draw the self-evaluation criteria for lesson planning and teaching performance, pre-service self-reported assessments were analyzed using qualitative analyses. In addition, descriptive statistics were used to investigate the pre-service teachers' distribution across the criteria and check the ratio of pre-service mathematics teachers for each element. As a result, it was disclosed that pre-service mathematics teachers considered eight elements in self evaluating their own lesson planning and teaching performance. In addition, we found that pre-service mathematics teachers tended to consider Pedagogical Content Knowledge (PCK) more than Subject-Matter Knowledge (SMK). Moreover, the results of this study provide educational implications for the curriculum in the pre-service teacher's education program.
The purpose of this study was to investigate the characteristics of lesson planning of pre-service elementary teachers to develop scientific communication skills for elementary school students. For this purpose, lesson plans and lesson planning journals written by the 53 pre-service teachers were collected and analyzed. The results of the research were as follows. The pre-service elementary teachers used an implicit and contextual approach to develop scientific communication skills. Teaching and learning activities for enhancing scientific communication were mainly conducted in words or in writing. There were many activities expressing elementary school students' thoughts and presenting the results of experiments in the lesson plan. There were many cases in which the pre-service teachers' lesson plans did not include the evaluation of scientific communication skills. In their lesson plans, there are a lot of mutual activities between teachers and students, team and whole students, and inter-students within teams together, and students' individual activities from requests of teachers. We found that the pre-service teachers had various difficulties when they planned the science lesson to develop scientific communication skills. The pre-service teachers were less likely to refer to specialized materials related to science education when planning their classes.
이 연구에서는 중등 예비과학교사의 수업 계획의 특징과 이에 영향을 미친 요인을 조사하였다. 서울 소재 사범대학에 재학 중인 13명의 예비과학교사가 연구에 참여하였다. 예비교사들이 작성한 교수학습 지도안과 활동지 등의 교수학습 자료, 수업 계획 일지를 수집하였으며, 수업 계획의 요소별로 예비교사들의 수업 계획에 대한 심층적인 정보를 얻기 위해 반구조화된 면담을 실시하였다. 연구 결과, 대부분의 예비교사들은 차시 계획에만 초점을 맞추어 교육과정을 체계적으로 고려하지 않았다. 수업 목표는 수업 계획에서 부차적인 요소로 간주되었으며, 주로 인지적 측면에만 초점을 맞추어 기술되었다. 교수학습 전략을 구체화하는 것은 수업 계획의 출발점이 되었는데, 예비교사들은 자신의 중등학교에서의 학습 경험을 반성적으로 평가하는 과정을 통해 예비교사 교육과정에서 학습한 구성주의적 교수학습 이론을 수용하여 수업 계획에 활용하였다. 교수학습 활동으로 실험 활동을 계획한 경우에는 교과서에 수록된 실험 활동을 그대로 사용하는 경향이 높았으나, 실험 외의 활동은 자신의 개인적 경험에 의존하여 계획하는 것으로 나타났다. 또한, 예비교사들은 교수학습 평가를 수업 계획의 요소로 인식하지 못하여 이를 계획하지 않는 경우가 많았다. 이러한 결과를 바탕으로 중등 예비과학교사 교육에서 수업 계획에 대한 구체적인 교육 방안을 제안하였다.
Tran, Si Van-Tien;Lee, Doyeop;Pham, Trang Kieu;Khan, Numan;Park, Chansik
국제학술발표논문집
/
The 8th International Conference on Construction Engineering and Project Management
/
pp.96-102
/
2020
The construction industry remains serious accidents, injuries, and fatalities due to it's unique, dynamic, and temporary nature. On workplace sites, Safety pre-task planning is one of the efforts to minimize injuries and help construction personnel to identify potential hazards. However, the working conditions are complicated. Many activities, including tasks or job steps, are executing at the same time and place. It may lead to an increase in the risks from simultaneous tasks. This paper contributes to addressing this issue by introducing a safety risk interaction analyzing framework. To accomplish this objective, accident reports of the Occupational Safety and Health Administration (OSHA) are investigated. The pairs of task incompatibility, which have time-space conflicts and lead to incidents, are found. Ontology technology is applied to build the risk database, in which the information is acquired, structuralized. The proposed system is expected to improve pre-task planning efficiency and relieve the burdens encountered by safety managers. A user scenario is also discussed to demonstrate how the ontology supports pre-task planning in practice.
The purpose of this study was to elicit the multi-dimensions of retirement expectations, and explore sub-factors of retirement expectations which predict the possibility of worker's participation to each pre-retirement planning programs. The major findings were as follows: first, this study shows that there are four sub-factors; Imposed frustration, New beginning, Transition to rest, Continuing. And there was a significant difference in retirement expectation according to sex, age, income, and health status. Second, the major affecting factors on participation in pre-retirement planning programs were sex, age, job, educational attainment, and health status. Third, those who have retirement expectations of 'Imposed frustration' tend to attend re-employment, leisure, and health education. Those who have retirement expectations of 'Transition to rest' tend to attend re-employment, inauguration education. And those who have retirement of 'Continuing' tend to attend leisure education.
This paper presents a computer-aided simulation and robotic-assisted execution technology of external fixation method to achieve fracture reduction and deformity correction in long bones. Combining the kinematic analysis with a graphic model of the tibia and the fixator allowed 3D simulation and visualization of the adjustments required to reduce fracture or correct bone deformity as a pre-operative planning tool. The developed robot model provided accurate deformity correction with small residual deformity based on the results of the planning. By incorporating the robot model with image-guided system and computer-aided planning, the integrated system could be useful for computer-aided pre-operative planning and robotic-assisted execution in fracture treatment and bone deformity surgery.
Recently there has been increasing emphasis on pedagogical content knowledge (PCK) for fostering science teachers' teaching professionalism that needs to be done from teacher training courses systematically. We investigated what were the PCK factors considered in planning instruction and the difficulties encountered in implementing it by pre-service teachers. In this study, 26 sophomores at an university of education in Gyeonggi province were asked to perform teaching demonstrations using scientific instruction models. They were also requested to write reflective journals and interview. Analyses of the results revealed that many pre-service teachers considered the teaching strategies such as the instruction organization and implementation when planning instruction. They had also regard to the learners' cognitive affective aspects, whereas the pre-knowledge of them was not properly considered. Especially, the curriculum and assessment were almost disregarded. Most of the difficulties encountered in planning instruction and implementing it were appeared in terms of the teaching strategies. For example, they had difficulties in considering the characteristics of each stage presented by the instruction models when planning instruction and implementing it. The frequencies of the difficulties in implementing experiment were especially higher than those of the other PCK factors. Educational implications of these findings are discussed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.