• Title/Summary/Keyword: Pre-Construction Phase

Search Result 94, Processing Time 0.028 seconds

A Research on the Parametric Design Method in Pre-Design Phase for BIM application (BIM 적용을 위한 기획설계 단계의 파라메트릭 디자인기법에 대한 연구)

  • Ha, Seung-Beom
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.1
    • /
    • pp.92-98
    • /
    • 2021
  • Modern society needs constantly the rationality and the efficiency, and this flow of the time has become the paradigm of the whole society. This paradigm has a large influence on the architectural design and industry. Modern technology represented by the development of digital instrument and Information Technology through internet has created and developed two big trend, Parametric Design and BIM(Building information Modeling) in the architectural design and industry. These technologies, though created for different reasons, have a lot of influence on the architectural design and industry for a common purpose such as efficiency and rationality across the boundaries. In this context, this research will be embodied through the example about how parametric design should be made in the beginning of pre-design phase for BIM application. This research aims to consider the design process of Walt Diseny Consert Hall, the work of Frank O. Ghery, a deconstructivism architect, and to embody the shape of National Nederlanden Building in Prague, the Czech Republic, using parametric design tool in pre-design phase. This research later aims to be used as the basic data that can be applied to the entire architectural industry from a planning and a detailed design to a construction for the ultimate BIM application beyond the range of parametric design in pre-design phase. Later, the plan using the parametric design algorithm and BIM application in construction document phase will be conducted.

Analysis of Dispute Cases According to the Construction Project Phases -Focused on Cases of the Supreme Court and Korean Commercial Arbitration Board- (건설프로젝트 단계별 분쟁사례 분석에 관한 연구 - 대법원 및 대한 상사 중재원 사례를 중심으로 -)

  • Lee, Yi-Do;Park, Jeong-Ro;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.185-189
    • /
    • 2010
  • As recent construction project has specialization and high-level of the engineering, Although, It has always uncertainty of agreement and contract enforcement, factors of difficult to predict etc. in each phase. In this process, Various interest groups involved are continuously generated dispute of interest each others. So this paper analyzed the dispute cases in construction projects from the Supreme Court and Korean Commercial Arbitration Board in Korea, and then identified the dispute types and causes that occur during all of the construction project phases with their influence analysis. At the result, It will be contributed to the basic data for pre-dispute prevention in the construction projects.

  • PDF

A Study on the Improvement of Safety Management of Plan/Order, Design, and Construction Business Management (기획·발주, 설계, 건설사업관리 부분의 건설안전관리 향상에 대한 연구)

  • Yoon, H.K.;Kwon, Y.J.;Oh, B.H.;Gwon, Y.I.;Yoon, Y.G.;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.4
    • /
    • pp.56-63
    • /
    • 2020
  • The government has established various policies focusing on accident prevention to reduce the accident rate in the construction industry, but the effect is still insignificant. These results allude that there are still many problems in terms of usability. Although construction safety accidents usually have characteristics that occur during construction, the laws and systems should include the pre-construction cycle (plan/order - design - construction business management- construction) to eliminate risk factors in advance. The purpose of this study is to analyze the performance evaluation of the construction safety system before construction rather than during construction. In the pre-construction phase (plan/ order-design-constuction business management), we intend to investigate and analyze measures to prevent safety accidents and identify a system that lacks the ability to implement. Specifically, we analyzed what to focus on as precautionary measures in the planning, ordering, designing, and supervising. To improve them, we made a questionnaire based on the role related to construction safety for each subject, and seek implications for lack of performance through interviews. Based on the results, some ways to improve the safety system were proposed.

Integrated Project Delivery in the Pre-construction Phase : Case Study of IPD for Lean Construction (사례 연구를 통한 Pre-con 단계의 린 건설 기반 IPD 프로젝트 적용 방안 도출)

  • Jang, Hanbyeol;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.11-22
    • /
    • 2019
  • Current construction project processes pose difficulties for construction management as inefficient communication between project participants seldom accurately reflects the needs of the owner. To solve this problem, lean construction-based Integrated Project Delivery (IPD), which facilitates cooperation and builds trust through the formation of horizontal relationships among participants, is becoming increasingly popular. However, although lean construction-based IPD improves productivity in the construction industry, few studies have focused specifically on developing effective methods that maximize the benefits gained from lean construction-based IPD. This study therefore analyzed success factors for lean construction-based IPD projects by analyzing prior studies to identify factors that support IPD success. Application methods were analyzed and an example of how they are actually used in the field was examined through an in-depth single case analysis. The findings of this research can be applied to support lean construction-based IPD projects in Korea, improving their efficiency and boosting owner satisfaction.

A Two-phase Method for the Vehicle Routing Problems with Time Windows (시간대 제약이 있는 차량경로 결정문제를 위한 2단계 해법의 개발)

  • Hong, Sung-Chul;Park, Yang-Byung
    • IE interfaces
    • /
    • v.17 no.spc
    • /
    • pp.103-110
    • /
    • 2004
  • This paper presents a two-phase method for the vehicle routing problems with time windows(VRPTW). In a supply chain management(SCM) environment, timely distribution is very important problem faced by most industries. The VRPTW is associated with SCM for each customer to be constrained the time of service. In the VRPTW, the objective is to design the least total travel time routes for a fleet of identical capacitated vehicles to service geographically scattered customers with pre-specified service time windows. The proposed approach is based on ant colony optimization(ACO) and improvement heuristic. In the first phase, an insertion based ACO is introduced for the route construction and its solutions is improved by an iterative random local search in the second phase. Experimental results show that the proposed two-phase method obtains very good solutions with respect to total travel time minimization.

A Linkage Method for the Life Cycle Cost Breakdown Structure through an Analysis of Boundary Conditions (경계조건 분석을 통한 LCCBS 연계방안)

  • Jeong, Jae-Hyuk;Kim, Tae-Hui
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.321-332
    • /
    • 2013
  • Costs and expenses are intertwined and incurred throughout an entire construction project, even from the pre-construction phase, and each phase has a different impact on the life cycle cost (LCC). However, the cost breakdown structure (CBS) is different in each phase of a building construction project, which makes it hard to reasonably calculate construction cost. For this reason, the boundary conditions were analyzed in this study based on the life cycle cost break structure (LCCBS). In addition, breakdown factors were analyzed based on the boundary conditions to derive a linkage method. The validity of the linkage method was verified through application to actual construction projects. Through the analysis, it was found that the problem of items being left out was reduced by more than 97.2 percent, and the work was done an average of 6 hours faster compared to the conventional method. It is expected that by applying the new LCC system, LCC will be both reduced and calculated in a more efficient manner.

A Study on the BIM Data Guidelines for the Review of Constructability and Economic Evaluation of Apartment Houses (공동주택 시공성 검토 및 경제성 평가를 위한 BIM 데이터 구축 가이드라인 작성에 관한 연구)

  • Lee, Hae-Chan;Kim, Jin-Man;Lee, Dong-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.149-150
    • /
    • 2019
  • Recently, major public owner and general contractors in Korea are actively preparing and improving BIM manuals and guidelines to effectively apply BIM technology in construction projects. These guideline has a purpose to define the scope of the applying BIM technology to each construction phase and to explain the minimum technology guidance required for the initial stage. In situations where BIM data are to be submitted within a limited time and cost at the design stage, a BIM data preparing process should be carried out in advance to meet the BIM interoperability between the pre and post of construction precess. In this research, we propose the scope of the BIM guidelines to meet and to be considered for the BIM based review of constructability and economic evaluation of Apartment.

  • PDF

Improving the Ripple-Effect Metrics of Post-Construction Evaluation (건설공사 사후평가 파급효과 지표 개선방안)

  • Cha, Yongwoon;Jung, Seo-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.355-356
    • /
    • 2023
  • The ripple effect is analyzed in the post-construction evaluation phase, but only the qualitative analysis and simple numerical fluctuations are analyzed, thus, no reliable ripple-effect analysis has been conducted. Therefore, in this study, a focus group interview was conducted with 10 experts to propose a plan to improve the ripple effect metrics. Consequently, by linking with the policy-effect metrics of the pre-feasibility study, it is expected that the utilization of the analysis results will be improved and objective and quantitative analysis will be possible.

  • PDF

Policies and Tasks for Improving Korean CM Industry (CM 산업 발전을 위한 정책 및 과제 추진 방안)

  • Kang, Seunghee;Jung, Youngsoo;Kim, Namjoon;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.71-81
    • /
    • 2014
  • As domestic construction investment has been gradually reduced, the issue of expanding overseas CM market has increased. Strengthening CM capability from the view point of project life-cycle is required in overseas CM market. However, current regulations institutionally force public CM services to focus on the construction phase. Therefore, Korean CM firms can hardly have the opportunities for accumulating technical competitiveness especially for pre-construction phase. Result of this study shows that the total efforts in terms of man-hours for the construction phase is found to be more than 78 percent in domestic public CM projects. In this context, this study proposes the policies and tasks for improving 'rigid man-hour placement', 'unreasonable CM fee standards', 'CM firm selection method', 'unreasonable business scope decision', and 'evaluation of owner's project management capability' in order to improve domestic CM Industry as well as to expand overseas CM market successfully.

A Manpower Forecasting Regression Model for Apartment House Construction Project based on the Historical Data (실적자료 분석을 통한 공동주택공사 노무량 예측 회귀모델)

  • Son, Yong-Seok;Shim, In-Bo;Kwon, Jae-Sung;Jeon, Sang-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.85-93
    • /
    • 2006
  • This study is started from a situation of korean construction which has been undergoing diversity. And risk of construction project has been increased recently. The purpose of this study is to propose the model which is able to estimate the proper manpower by eliciting the variable which is offered in the pre-design and construction phase. The existing method of estimate has a problem with calculating exact costs. For this model, it was analyzed the existing manpower estimating model and used historical data of 38 apartment houses, constructed from 2000 to now. Based on these, the regression model of the construction manpower was built. And then the regression model was verified. The result of verification was relatively adequate in the statistics exept for some cases. This regression model will help make it possible for constructor to estimate the deduction of retirement more accurate than existing method.