• Title/Summary/Keyword: Pre Inspection

Search Result 301, Processing Time 0.022 seconds

Automatic Optical Inspection System for Holograms with Multiple Patterns (다중패턴 홀로그램을 위한 자동광학검사 시스템)

  • Kwon, Hyuk-Joong;Park, Tae-Hyoung
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.15 no.5
    • /
    • pp.548-554
    • /
    • 2009
  • We propose an automatic inspection system for hologram with multiple patterns. The system hardware consists of illuminations, camera, and vision processor. Multiple illuminations using LEDs are arranged in different directions to acquire each image of patterns. The system software consists of pre-processing, pattern generation, and pattern matching. The acquired images of input hologram are compared with their reference patterns by developed matching algorithm. To compensate for the positioning error of input hologram, reference patterns of hologram for different position should be generated in on-line. We apply a frequency transformation based CGH(computer-generated hologram) method to generate reference images. For the fast pattern matching, we also apply the matching method in the frequency domain. Experimental results for hologram of Korean currency are then presented to verify the usefulness of proposed system.

A Case Study on the Assessment of Damaged Cause for the Damaged Reinforced Concrete Pier

  • Chai, Won-Kyu;Kim, Kwang-Il;Son, Young-Hyun
    • International Journal of Safety
    • /
    • v.10 no.1
    • /
    • pp.16-21
    • /
    • 2011
  • In this thesis, appearance inspection, compressive strength of concrete test, arrangement of bar inspection, survey, and bearing stress analysis were performed on a damaged coping of reinforced concrete pier to investigate the damage cause. According to the performed a series of inspections, it was found that the coping of pier was damaged during PSC (Pre-stressed Concrete) beam construction. In this thesis, the repair method for damaged pier was studied. The repair procedure used in this thesis was follows : chipping for damaged part, clean by high-pressure, installation of wire mesh, coating of surface hardening, construction of section restoration material, copula grinding, and prevent coating for far-infrared radiation.

  • PDF

Optical Microscopic Image Analysis for Damaged GFRP Rebar by Alkali and High Temperature Exposures (알칼리와 고온노출에 의한 GFRP 보강근 손상에 대한 현미경분석 연구)

  • Bae, Jung-Myung;Moon, Do-Young;Park, Cheol-Woo;Park, Young-Hwan
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.2
    • /
    • pp.53-59
    • /
    • 2017
  • In this experimental study, the characteristic of damages on GFRP rebar exposed to high temperature only and immerged in alkaline solution after the exposure to high temperature was analyzed through microscopic image analysis. The found microcrack and pores in resin matrix were quantitatively compared if there was effect of pre-exposure to high temperature. The damages, such as microcrack and pores in resin matrix, by alkali exposure were mainly found in rebar surface. On the other hand, the pores caused by high temperatures were extensively found in a section and had greater width than those caused by the alkali exposure. In results of the quantitative comparison, the accumulated length and widths of microcrack and pores in resin matrix in pre-exposed GFRP rebar to high temperature were respectively 1.5 and 1.4 times of those in the GFRP rebar only immerged in alkali solution. Therefore, the deterioration of resin matrix by the alkali exposure could be accelerated due to the pre-exposure to high temperature.

Effect of Properties of Repair Mortars According to Pre-mixing Methods (원료 사전 혼합 방법에 따른 보수 모르타르의 물성에 대한 영향)

  • Shin, Dong-Cheol;Kang, Yong-Hak
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.4
    • /
    • pp.104-109
    • /
    • 2017
  • It is important to keep the distribution of the raw material mixture constant, in order to maximize the effect of the pre-mix type repair mortar, and it is also necessary to increase the performance of the mixer in order to minimize the deviation of the product. In this study, three kinds of mixer used in production sites were used to make repair mortar and the properties of each mortar were examined. As a result, it is confirmed to the difference in properties of pre-mix type repair mortar differ depending on the type of mixer, and the fluidized zone mixer showed relatively good results. In addition, it is preferable to set the mixing time to about 10 minutes to 15 minutes in order to ensure workability and optimum physical properties.

Non-contact Ultrasonic Inspection Technology of Fillet Weldments (필렛 용접부의 비접촉 초음파 검사 기법)

  • Park, Ik-Keun;Lee, Chul-Ku;Kim, Hyun-Mook;Park, Tae-Sung;Kim, Yong-Kwon;Cho, Yong-Sang;Song, Won-Joon;Ahn, Houng-Kun
    • Journal of Welding and Joining
    • /
    • v.23 no.5
    • /
    • pp.37-42
    • /
    • 2005
  • The non-destructive Inspection of the fillet weldment has difficulties due to its geometrical complexity and uneasy access. The surface shear horizontal wave (SH-wave), however, has been successfully applied to the detection of cracks on the surface and sub-surface of the filet weldment heel part. The conventional ultrasonic inspection using the surface SH-wave is usually a contact method using piezoelectric transducer. Thus, it is not suitable for a field application because the reliability and repeatability of inspection are significantly affected by test conditions such as couplant, contact pressure and pre-process. In order to overcome this problem, a non-contact SH-wave inspection method using EMAT is propose. The experimental results with this non-contact method are compared with those with a conventional ultrasonic method in fillet weldment with slit type defects. It is shown that the non-contact inspection technique requires simple procedure and less time in the fillet weldment inspection.

Tunnel Safety Diagnosis in Near-excavation by In-depth Inspection of Tunnel (기존터널 안전진단 결과를 통한 근접시공 시 터널 안정성 평가)

  • Kim, Seok-Jae;Kim, Min-Seok;Kim, Jun-Chul;Yoo, Young-Il;Oh, Joung-Bae;Oh, Sae-Joon
    • Tunnel and Underground Space
    • /
    • v.16 no.4 s.63
    • /
    • pp.347-356
    • /
    • 2006
  • We analyzed case studies doing in-depth inspection of tunnel to maintain safety of existing tunnel in constructing new tunnel near to a existing tunnel with single track. Futhermore, We accomplished in-depth inspection of existing tunnel and numerical analysis. We suggested remedies to security safety of existing tunnel. We applied line drilling and pre-large hole boring method not to have an effect on existing tunnel and convinced the safety of existing tunnel from blast-vibration and blast-noise of numerical analysis. We planed to install basset system to measure displacement of existing tunnel according to excavating new tunnel.

A Roots Method in GI/PH/1 Queueing Model and Its Application

  • Choi, Kyung Hwan;Yoon, Bong Kyoo
    • Industrial Engineering and Management Systems
    • /
    • v.12 no.3
    • /
    • pp.281-287
    • /
    • 2013
  • In this paper, we introduce a roots method that uses the roots inside the unit circle of the associated characteristics equation to evaluate the steady-state system-length distribution at three epochs (pre-arrival, arbitrary, and post-departure) and sojourn-time distribution in GI/PH/1 queueing model. It is very important for an air base to inspect airplane oil because low-quality oil leads to drop or breakdown of an airplane. Since airplane oil inspection is composed of several inspection steps, it sometimes causes train congestion and delay of inventory replenishments. We analyzed interarrival time and inspection (service) time of oil supply from the actual data which is given from one of the ROKAF's (Republic of Korea Air Force) bases. We found that interarrival time of oil follows a normal distribution with a small deviation, and the service time follows phase-type distribution, which was first introduced by Neuts to deal with the shortfalls of exponential distributions. Finally, we applied the GI/PH/1 queueing model to the oil train congestion problem and analyzed the distributions of the number of customers (oil trains) in the queue and their mean sojourn-time using the roots method suggested by Chaudhry for the model GI/C-MSP/1.

Study on the reform case about a bad connection of M.Tr 87Ry 2nd CT circuit etc. (M.Tr 87Ry 2nd CT 회로 오결선 등 개선사례 분석)

  • Park, Kang-Seo;Park, Jun-Sung;Choi, Jong-Soo
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.05a
    • /
    • pp.374-378
    • /
    • 2008
  • The analysis about cases which does not correspond in electric equipment technical standard and judgement standard while doing pre inspection, it improves the technical specifications and the draft of construction plan. The analysis of the reform cases prevents the electric disaster and propagates the electrical safety. Hereafter the reform cases will improve the electric technical ability and help the electrical safety of the yard.

  • PDF

Field Feasibility Study of an Eddy Current Testing System for Steam Generator Tubes of Nuclear Power Plant (원전 증기발생기 와전류검사 시스템 현장적용 연구)

  • Moon, Gyoon-Young;Lee, Tae-Hun;Kim, In-Chul
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.11 no.2
    • /
    • pp.13-19
    • /
    • 2015
  • Steam generator is one of the most important component of nuclear power plant, and it's integrity and reliability are to be assured to high level by pre-service inspection and in-service inspection. To improve the reliability of steam generator heat exchanger tubes and to secure the management of nuclear power plant safely, KHNP CRI recently has developed eddy current testing system for steam generator. KHNP CRI have performed a series of experimental verification and field application to confirm the performance of the developed ECT system in accordance with ASME Code requirements. The ECT system consists of a remote data acquisition unit, an ECT signal acquisition and analysis software, a water chamber robot controller and a probe push-puller. In this paper, we will details of the developed ECT system and the software and their experimental performance. And also we will report the field applying performance and the issues for further steps.

Development of Pre-Service and In-Service Information Management System (iSIMS) (원전 가동전/중 검사정보관리 시스템 개발)

  • Yoo, H.J.;Choi, S.N.;Kim, H.N.;Kim, Y.H.;Yang, S.H.
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.24 no.4
    • /
    • pp.390-395
    • /
    • 2004
  • The iSTMS is a web-based integrated information system supporting Pre-Service and In-Service Inspection(PSI/ISI) processes for the nuclear power plants of KHNP(Korea Hydro & Nuclear Power Co. Ltd.). The system provides a full spectrum coverage of the inspection processes from the planning stage to the final report of examination in accordance with applicable codes, standards, and regulatory requirements. The major functions of the system includes the inspection planning, examination, reporting, project control and status reporting, resource management as well as objects search and navigation. The system also provides two dimensional or three dimensional visualization interface to identify the location and geometry of components and weld areas subject to examination in collaboration with database applications. The iSIMS is implemented with commercial software packages such as database management system, 2-D and 3-D visualization tool, etc., which provide open, updated and verified foundations. This paper describes the key functions and the technologies for the implementation of the iSIMS.