Test facilities for the wind turbine performance monitoring and mechanical load measurements are installed in Vestas 100 kW wind turbine in Wollyong test site, Jeju island. The monitoring system consists of Garrad-Hassan T-MON system, telemetry system for blade load measurement, various sensors such as anemometer, wind vane, strain gauge, power meter, and etc. The experimental procedure for the measurement of wind turbine loads, such as edgewise(lead-lag) bending moment, flapwise bending moment, and tower base bending moment, has been established. Strain gauges are on-site calibrated against load cell prior to monitoring the wind turbine loads. Using the established monitoring system, the wind turbine is remotely monitored. From the measured load data, the load analysis has been performed to obtain the load power spectral density and the fatigue load spectra of the wind turbine.
Ha, M.K.;Kwak, J.S.;Song, J.B.;Kim, G.H.;Kim, H.S.
Journal of the Korean Society for Precision Engineering
/
v.13
no.9
/
pp.149-155
/
1996
Recent researches in the trouble monitoring system of grinding process have emphasized the use of deep knowledge. Such works include the monitoring and diagnostic systems for cylindrical grinding using sensors on chatter vibration and grinding burn during the process. But, since grinding operations are especially related with a lalrge amount of ambique parameters, it is effectively difficult to detect the grinding troubles occuring during the grinding process. In this paper, monitoring system for grinding utilizes the neural networks based on grinding power signatures. The monitoring system of grinding operations, which makes use of PDP neural networks, is presented. Then, the implementation results by computer simulations and experimental data with respect to chatter vibration and grinding burn are compared.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.14
no.6
/
pp.119-123
/
2014
The main purpose of reactive power compensation monitoring system is to manage factory electrical installation efficiently by On-Off switching reactive power compensation equipment. The existing reactive power compensation monitoring system is only able to be managed by operator whenever electrical installation needed reactive power. Therefore, it may be possible for propagating the installation's faults when operator make the unexpected mistakes. To overcome the unexpected mistakes, in this paper, the author presents a reactive power compensation monitoring system for factory electrical installation using active database. by using active database production rule, stated system can minimize unexpected mistake and can operate centralized monitoring system efficiently. Test results on the five factory electrical installations show that performance is efficient and robust.
As with any ships, adequate power provision is crucial, especially on the ocean navigating ships far from the land. In order to resolve the effective and economic power supply system of any ship in operation, in this paper, we propose a power management system that intelligently controls the power supply in ships. Power management systems in this design consist of a power load detection system, a generator configuration system, and a power monitoring system respectively. The CT / PT sensor is used to measure amount of current and power in the power detection system, and according to the collected information from various sensor, the generator configuration system will switch on and off the main / sub generator effectively. Finally, the power monitoring system will display all status information of this power management system at a glance for users. This power management systems implemented in this paper is evaluated via real-time experiments, which works well as designed, and certified by KSCIEC61892-1:2012 and KSCIEC60950-1:2008.
Kim, S.-Tae;Lee, Jeong-Hyun;Kim, Ji-Young;Lee, Dong-Chul;Moon, Young-Hwan;Kim, Tae-Hyun
Proceedings of the KIEE Conference
/
2006.07a
/
pp.165-166
/
2006
Recently, after Wide Area Outage of the North-Eastern United States occurred, many countries started to be concerned about WAMS (Wide Area Monitoring System), and Korean power system also experienced Wide Area outage according to typhoon Mae-Mi, and Haenam-Jeju HVDC line fault. Since it is too difficult to detect a symptom based on SCADA or EMS, a defense system of electric power infrastructure has required. In this research, the designed and developed system processes the time synchronized real time power system information based on GPS and shows the 2D/3D monitoring viewer using the phasor data and the results of three algorithms.
Excore Nuclear Flux Monitoring System in Nuclear Power Plant monitors continuous reactor power up to maximum 200%. The monitoring method, however, has to be different depending on the reactor power level. Because the logarithmic pulse signals must be counted and processed exactly due to large uncertainty if their levels are low, on the other hand, they must be processed through statistical methodolgies if theirs are high to get exact monitoring values, in point of thermal degradation view. Therefore, we developed thermal degradation input signal selection circuit to transfer low level reactor power monitoring circuit to high level reactor power circuit at rated value in this paper. We proved their validities through testing them using real data used in nuclear power plant and analyzed their results. And, These methods will be used to measure the neutron level of excore nuclear flux monitoring system in nuclear power plant.
The electricity supply industry for which high stability and quality of power are the primary aim of power company and the first order of business target. As the facilities of generations, transmissions and substations are increased every year, power system becomes more complex and hard to control. The complexity of the power system causes harmful influence on its security and power facilities. Moreover, difficulty of predicting weather condition in these days with its complexity increases the level of uncertainty of energy demand. Wide area online monitoring of power system offers lots of informations and solutions which clear the causes of insecurity in power system. In this paper, we presents the development of synchrophasor data measurement and transmission system using satellite network for power system online monitoring.
The Transactions of The Korean Institute of Electrical Engineers
/
v.67
no.12
/
pp.1577-1586
/
2018
The emergence of the Smart Grid is an integrated solution for the next generation power system that combines IT technology in the power system to create optimal energy utilization and various services. However, these convergence technologies (power systems and information communications) are not only improving the related technologies but also producing various problems especially exposure to cyber risk. In particular, the intelligent power grid has security vulnerabilities through real-time information sharing among various organically linked systems, and it is more complicated than the cyber risk problem in the existing IT field and is directly connected to national disaster accidents. Therefore, in order to construct and operate a more stable smart grid, this paper analyzes the system of power system control system in Korea, and proposes a cyber security element definition and a countermeasure establishment method of power monitoring & control systems based on security standards of smart grid (No. SPS-SGSF-121-1-1).
Power system perturbations are due to many reasons; one of the most common perturbation causes is switching off/on the power capacitors. This paper monitors and discusses the overvoltages which appear on local and remote capacitor connected buses in power systems. Using the Fast Fourier Transfer (FFT), the total harmonic content of voltages and currents waveforms is also estimated at all buses. The power factor during different cases of switching modes "off/on" is monitored. The monitoring technique tackles not only the longitudinal long distance mutual effects of switching power capacitors between different buses but also evaluates the overvoltage durations. A relative long term monitoring is implemented using the Matlab/Simulink environment to show severity assessments in different switching modes on the transformers' voltages and currents' waveforms.
한전은 국가경제 성장에 따라 늘어나는 발전설비에 대한 운영효율의 향상과 고장발생의 예방 사고시 운전원들의 운전능력 배양 등을 목적으로 운영요원 훈련용 시뮬레이터를 국산화 개발하여 운영하고 있다 훈련용 시뮬레이터를 구성하는 시스템들 중 발전소 안전계통과 발전소 감시계통을 시뮬레이션하는 PPC(Plant Processing Computer) 시스템이 있다 VMS(Vibration Monitoring System) 는 PPC의 여러계통들 중 하나로서 발전소의 터빈 발전기 펌프 등의 진동을 감시하는 시스템이다 본 논문에서는 시뮬레이터의 VMS를 개발하기 위해 적용한 시뮬레이tus 모델 알고리즘 그리고 모델에서 계산된 진동값을 PC의 모니터에 나타내는 Display 시스템등에 대해 기술하고자한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.