• Title/Summary/Keyword: Power system interconnection

Search Result 206, Processing Time 0.025 seconds

A Study on the Calculation of Optimal Compensation Capacity of Reactive Power for Grid Connection of Offshore Wind Farms (해상풍력단지 전력계통 연계를 위한 무효전력 최적 보상용량 계산에 관한 연구)

  • Seong-Min Han;Joo-Hyuk Park;Chang-Hyun Hwang;Chae-Joo Moon
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.19 no.1
    • /
    • pp.65-76
    • /
    • 2024
  • With the recent activation of the offshore wind power industry, there has been a development of power plants with a scale exceeding 400MW, comparable to traditional thermal power plants. Renewable energy, characterized by intermittency depending on the energy source, is a prominent feature of modern renewable power generation facilities, which are structured based on controllable inverter technology. As the integration of renewable energy sources into the grid expands, the grid codes for power system connection are progressively becoming more defined, leading to active discussions and evaluations in this area. In this paper, we propose a method for selecting optimal reactive power compensation capacity when multiple offshore wind farms are integrated and connected through a shared interconnection facility to comply with grid codes. Based on the requirements of the grid code, we analyze the reactive power compensation and excessive stability of the 400MW wind power generation site under development in the southwest sea of Jeonbuk. This analysis involves constructing a generation site database using PSS/E (Power System Simulation for Engineering), incorporating turbine layouts and cable data. The study calculates reactive power due to charging current in internal and external network cables and determines the reactive power compensation capacity at the interconnection point. Additionally, static and dynamic stability assessments are conducted by integrating with the power system database.

Feasibility Study for the Stable Operation of Cheju Network (제주계통의 안정적 운전에 대한 타당성 연구)

  • Kim, Chan-Ki;Chang, Jae-Won;Moon, Bong-Soo;Shim, Jeong-Woon
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.13 no.5
    • /
    • pp.344-351
    • /
    • 2008
  • The benefits of utilizing energy exchange between the main land and Cheju island in Korea make it interesting to establish new HVDC sea cable interconnections. A total power of 350 MW or more can then be exchanged through the HVDC links including the existing Cheju HVDC #1 interconnection. A feasibility study base on economical benefits has been carried out. Especially the comparison of economy benefit between thermal power plant, LNG power plant and HVDC system shows that HVDC system is the only solution in Cheju island. Also, this paper shows that additiona 1 HVDC system help to enhance the stability of power system.

The Site Selection of 100MVA STATCOM for Voltage Stability Enhancement in Korean Metropolitan Area (수도권 전압안정도 향상을 위한 100MVA STATCOM 위치선정 연구)

  • Chang, Byung-Hoon;Kim, Soo-Yul;Han, Jeong-Yeol;Choi, Don-Keun;Song, Hwa-Chang;Lee, Byong-Joon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.9
    • /
    • pp.1543-1548
    • /
    • 2007
  • This paper reports a study on determination of the adequate location of 100 MVA STATCOM regarding the transfer capability enhancement on the metropolitan interface as well as the economy in system operation. The base case in the study was established considering a scenario of the energy support to North Korea from the KEPCO (Korea Electric Power Corporation) system through a HVDC interconnection. In the base case, the energy support was approximately modeled with a load of 1500 MW, and by the load addition, the system was weakened in terms of voltage stability and transfer capability. After a thorough investigation on the case, the location of the STATCOM was decided to compensate the reactive deficit of the modified system and to maximize the operational benefit which can be estimated by FV analysis.

Analysis of Demonstration Research for Grid-connected Photovoltaics System (계통연계형 태양광발전시스템의 실증시험 분석)

  • Piao, Zheng-Guo;Kim, Seong-Kyeol;Lee, Kang-Yeon;Cho, Guem-Bae;Baek, Hyung-Lae
    • Proceedings of the KIEE Conference
    • /
    • 2004.04a
    • /
    • pp.205-207
    • /
    • 2004
  • This paper presents experimental operation with utility invertactive 3kW photovoltaic generation system. And that describe configuration of utility interactive photovoltaic system which power supply for Demonstration experiment. The status of photovoltaic generation system components and interconnection and safety equipment will be summarized. This paper discusses property operation state which system endure division of power for demonstration experiment.

  • PDF

A Study on the Operating Characteristics for Utility interactive 50KW Photovoltaic System (50KW 계통연계형 태양광발전시스템 운전특성에 관한 연구)

  • Lee, K.Y.;Chung, B.H.;Choi, M.H.;Lim, B.O.;Cho, G.B.;Baek, H.L.
    • Proceedings of the KIEE Conference
    • /
    • 2002.04a
    • /
    • pp.243-246
    • /
    • 2002
  • This paper presents experimental operation with utility interactive 50kw photovoltaic generation system. And that describe configuration of utility interactive photovoltaic system which power supply for dormitory. The status of photovoltaic generation system components and interconnection and safety equipment will be summarized. This paper discusses property operation state which system endure division of power for dormitory.

  • PDF

The operating characteristics of 50kW photovoltaic system by secular variation (경년변화에 따른 50kW급 태양광발전 시스템 운전특성)

  • Jeong, N.I.;Choi, Y.O.;Kim, D.H.;Seo, J.Y.;Cho, G.B.;Baek, H.L.
    • Proceedings of the KIPE Conference
    • /
    • 2007.07a
    • /
    • pp.69-70
    • /
    • 2007
  • This paper presents experimental operation with utility interactive 50kw photovoltaic generation system. And that describe configuration of utility interactive photovoltaic system which power supply for dormitory. The status of photovoltaic generation system components and interconnection and safety equipment will be summarized. This paper try analyzing the operating characteristic according to secular variation of a 50kw photovoltaic system.

  • PDF

Analysis of Operating Efficiency for 50kW Utility Interactive Photovoltaic System in Chosun university (조선대학교 기숙사 50kW 계통연계형 태양광발전시스템 효율 분석)

  • Piao, Zheng-Guo;Park, Jong-Min;Lee, Kang-Yeon;Lim, Hong-Woo;Cho, Geum-Bae;Baek, Hyung-Lae
    • Proceedings of the KIEE Conference
    • /
    • 2005.07b
    • /
    • pp.1736-1738
    • /
    • 2005
  • This paper presents experimental operation with utility interactive 50kw photovoltaic generation system. And that describe configuration of utility interactive photovoltaic system which power supply for dormitory. The status of photovoltaic generation system components and interconnection and safety equipment will be summarized. This paper discusses property operation state which system endure division of power for dormitory.

  • PDF

Development of the Base Station Transceiver Subsystem in the CDMA Mobile System

  • Lee, Dong-Wook;Yoo, Ki-Suk;Kim, Jin-Su;Kim, Myoung-Jin;Park, Jae-Hong
    • ETRI Journal
    • /
    • v.19 no.3
    • /
    • pp.116-140
    • /
    • 1997
  • The base station transceiver subsystem (BTS) of the CDMA Mobile System is interfaced to mobile stations over the air and to the wired network through a packet switched interconnection network. The potential benefits of CDMA technology are achieved when the transmitter and the receiver are properly designed and implemented. The physical layer of the interface at the base station is implemented with the CDMA ASICs and control circuits in channel card of the BTS. We present the design perspectives and structural illustration of the BTS. Base station modem ASICs and their control to implement the CDMA receiver, Baseband and RF signal processing blocks, and BTS controller are described. Elaborate power control is essential to ensure the high capacity which is one of advantages of the CDMA technology. The closed loop reverse link power control and the forward link power control operated in the BTS are described.

  • PDF

Performance Analysis of ARCP Inverter for Power System Interconnection (ARCP(Auxiliary Resonant Commutated Pole) 인버터의 특성분석)

  • Ha, Yo-Chul;Park, Sang-Ho;Kim, Hee-Joong;Han, Byung-Moon;Kim, Hyun-Woo
    • Proceedings of the KIEE Conference
    • /
    • 2000.07b
    • /
    • pp.1065-1067
    • /
    • 2000
  • This paper describes performance analysis of ARCP Inverter, which can offer zero voltage switching at nominal voltage stress. The system consists of a voltage-source inverter with sort-switching module. Each main switch is connected in parallel with resonant capacitor and two auxiliary switches are placed in series with a resonant reactor for soft-switching capability. The described ARCP inverter could be effectively applied for active power filter reactive power compensator, and UPS.

  • PDF

Implementation of Network Layer for a High Speed Rail (고속전철 네트워크용 네트워크 계층 구현)

  • Kim, Seok-Heon;Kim, Hyung-In;Jung, Sung-Youn;Kim, Han-Do;Park, Jae-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.2021-2026
    • /
    • 2008
  • Recently, a high speed rail consists of many train coaches and power cars. For keeping the reliable train communication system with train coaches and power cars, train uses the OSI model(Open Systems Interconnection Basic Reference Model) and KTX(Korea Train eXpress) only uses the Physical to Transport layer of OSI model. This paper describes the analysis of CLNP(Connectionless Network Protocol) and ES-IS(End System to Intermediate System) protocols used in KTX for the network layer. CLNP is used to send data to other system and ES-IS protocol is used to route and send information between end systems and intermediate systems. Also this paper presents the protocol parsing program and implementation of Network layer.

  • PDF