• 제목/요약/키워드: Power system interconnection

검색결과 206건 처리시간 0.025초

EMTP를 이용한 ESS가 연계된 배전계통에서 직격뢰 발생 시 계통 및 ESS 측의 서지 해석 (Analysis of Surge in Distribution System and ESS due to Direct Lightning in Distribution System with ESS using EMTP)

  • 서훈철
    • 조명전기설비학회논문지
    • /
    • 제29권2호
    • /
    • pp.47-53
    • /
    • 2015
  • The study concerning about the grid connection of the large-capacity energy storage system(ESS) is increasing. However, the transient study such as lightning or switching surge necessarily occurred at power system with ESS has been hardly performed. Therefore, this paper performs the analysis of lightning surge in distribution system with ESS using electromagnetic transient program(EMTP). The battery model in Matlab/Simulink is modeled by EMTP, which is the specialized software for power system transient study. Also, the bi-directional power electronics for interconnection of the battery and distribution system are modeled by EMTP. When the lightning is occurred at interconnection point of ESS, this paper simulates the existence of ESS and operation conditions of ESS and analyzes the surge in distribution system and ESS according to the various conditions.

동북아 전력계통 연계를 통한 융통전력 도입 시 가격상한 수준에 대한 분석 (Analysis of Electricity Price Cap Transacted via Interstate Electric Power System in Northeast Asia)

  • 정구형;김홍근;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.772-774
    • /
    • 2005
  • Interstate electric power system, as an alternative for energy cooperation under regional economic bloc, has been hotly debated before progressing the restructure in electric power industry and rapidly expanded in many regions after 1990s. Especially, since northeast asia has strong supplementation in resource, load shape, fuel mix etc., electric power system interconnection in this region may bring considerable economic benefits. Moreover, since Korean electric power system has a great difficulty in a geographical condition to interrupt electricity transaction with other countries, it has been expanded as an independent system to supply all demand domestically. As a result, Korean electric power system makes considerable payment for maintaining system security and reliability and expands costly facilities to supply a temporary summer peak demand. Under this inefficiency, if there are electricity transactions with Russia via the North Korea route then economic electric power system operation may be achieved using seasonal and hourly differences in electricity price and/or load pattern among these countries. In this paper, we estimate price cap of transacted electricity via interstate electric power system in northeast asia. For this study, we perform quantitative economic analysis on various system interconnection scenarios.

  • PDF

배전계통에 연계된 전지전력저장시스템의 유.무효전력 제어 (Active and Reactive Power Control of the Battery Energy Storage System interconnected with Power Distribution System)

  • 김재철;문선호;최준호;김응상
    • 조명전기설비학회논문지
    • /
    • 제13권4호
    • /
    • pp.127-133
    • /
    • 1999
  • 본 논문은 배전계통에 전지전력저장시스템(Battery Energy Storage System: BESS)를 연계하여 운전하는 경우 BESS의 유.무효전력 제어에 대하여 연구하였다. BESS을 배전계통에 연계하는 경우, 이의 유.무효전력 출력을 제어함으로써 배전계통에 일정 전력을 공급, 첨두 부하를 삭감하고 전압을 보상할 수 있다. 본 논문에서는 배전계통과 전지전력저장시스템을 등가 모델링 하였고 전지전력저장시스템의 유.무효 전력제어를 위한 전력 조류 방정식을 제시하였다. 본 논문에서는 BESS의 유.무효전력을 제어하기 위하여 $P-\delta$와 Q-V 제어를 사용하였고 이를 입증하기 위하여 BESS의 유.무효전력 제어를 PSCAD/EMTDC 프로그램을 이용하여 시뮬레이션 하였다.

  • PDF

동북아 전력계통 연계에 따른 경제성 분석 (Economic Analysis on the Interconnected Electric Power System in Northeast Asia)

  • 정구형;김경민;박중성;한석만;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.766-768
    • /
    • 2005
  • Interstate electric power system, as an alternative for energy cooperation under regional economic bloc, has been hotly debated before progressing the restructure in electric power industry and rapidly expanded in many regions after 1990s. Especially, since northeast asia has strong supplementation in resource, load shape, fuel mix etc., interconnection of electric power systems in this region may bring considerable economic benefits. For the economic analysis, we implement ORIRES model developed by ESI, Russia. ORIRES is a linear programming (LP) model for electric power system operation and planning. Since ORIRES requires data relatively less than other model, it is suitable for northeast asia that has considerable restriction against required data acquisition. In this paper, we perform an economic analysis on interconnection in northeast asia.

  • PDF

다기 전력 시스템의 안정화를 위한 탐색화된 정책 반복법 기반 적응형 강인 제어기 설계 (Design of an Adaptive Robust Controller Based on Explorized Policy Iteration for the Stabilization of Multimachine Power Systems)

  • 전태윤;박진배
    • 제어로봇시스템학회논문지
    • /
    • 제20권11호
    • /
    • pp.1118-1124
    • /
    • 2014
  • This paper proposes a novel controller design scheme for multimachine power systems based on the explorized policy iteration. Power systems have several uncertainties on system dynamics due to the various effects of interconnections between generators. To solve this problem, the proposed method solves the LQR (Linear Quadratic Regulation) problem of isolated subsystems without the knowledge of a system matrix and the interconnection parameters of multimachine power systems. By selecting the proper performance indices, it guarantees the stability and convergence of the LQ optimal control. To implement the proposed scheme, the least squares based online method is also investigated in terms of PE (Persistency of Excitation), interconnection parameters and exploration signals. Finally, the performance and effectiveness of the proposed algorithm are demonstrated by numerical simulations of three-machine power systems with governor controllers.

PV 시스템의 계통연계를 위한 새로운 고립운전 방지 알고리즘 (A Novel Anti-islanding Algorism for Utility Interconnection of PV System)

  • 윤중혁;김흥근;최종우;유권종
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 춘계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.271-273
    • /
    • 2005
  • Islanding of PV systems occurs when the utility grid is removed but local sources continue to operate and provide power to local loads. Islanding is one of the serious problems in an electric power system connected with dispersed power sources. Also, this can present safety hazards and the possibility of damage to other electric equipments. If the real and reactive power of RLC load and PV system are closely matched, islanding phenomena can't be detected by the passive methods. Several active methods were proposed to detect islanding phenomena. The most effective method is SFS method which was suggested by Sandia National Laboratory. In this paper, a new anti-islanding algorithm is proposed and its validity is verified through simulation and experimental results for utility interconnection of PV system.

  • PDF

서부아프리카 국가간 연계 송전망 타당성 조사 (Feasibility Study for the Ghana-Mali 225kV Interconnection Project)

  • 김종화;이철휴;이영길;최상주
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.38-39
    • /
    • 2008
  • KEPCO conducted the project called the "Feasibility Study for the Han (Ghana) - Bobo Dioulasso (Burkina Faso) - Bamako (Mali) Interconnection Project" as its first African project. This paper deals with power system analysis and Transmission line and substation design of approximately 750 kilometers of the 225 kV single circuit transmission lines and six substations. The main contents of the power system analysis results and preliminary engineering design include power flow, transient stability, eigenvalue analysis, transmission line design, substation design and economic analysis.

  • PDF

제주계통 단독운전 시 주파수 안정도 유지를 위한 풍력발전 운전용량 산정 방법에 관한 연구 (A Study on the Assessment of Operational Capacity Limit of Wind Turbine for the Frequency Stability of Jeiu Island System)

  • 황교익;전영환
    • 전기학회논문지
    • /
    • 제56권2호
    • /
    • pp.233-239
    • /
    • 2007
  • As the Kyoto Protocol, which aims at reducing greenhouse gases in accordance to the UNFCCC, came into force, research on environment friendly energy resources has been a matter of concern worldwide. As a general power generation system, among renewable energy resources, that is interconnected and operated with power system, the wind turbine is emerging as an effective alternative. Since power capacity of the wind turbine has been steadily increasing and its relative importance is also increasing in total facility capacity, we cannot ignore its effect. Because controlling generation output in the wind turbine is not as easy as in the synchronous machine due to its facility characteristics and it generates irregular output fluctuations when interconnected with power system, system interconnection was difficult. But the effect of large capacity wind turbine on isolated power system like Jeju island is serious problem on the frequency stability. Accordingly, it is necessary to analyze the effects of wind turbine on system interconnection and assess the optimum capacity of wind turbine that satisfies the most important principle of stable power supply. This paper have analyzed the effects of wind turbine capacity increases on the system and suggested the method of the capacity to achieve its steady operation. And It is applied to the Jeju island.

바이폴 ±750 직류 배전망 연계용 태양광 발전 시뮬레이터 구현 (Implementation of a Photovoltaic System Simulator for Interconnecting with Bipolar ±750V DC distribution Grid)

  • 김태훈;김석웅;조진태;김주용;정재승
    • 전기학회논문지
    • /
    • 제65권11호
    • /
    • pp.1800-1805
    • /
    • 2016
  • The micro-grid designed as bipolar ${\pm}750V$ low-voltage DC power distribution system demonstrated by KEPRI, demands interconnection of a number of small decentralized power source including variable renewable generator. Therefore, variable researches for the influence of interconnection with the bipolar typed DC grid and these variable power sources are required for superior quality of power distribution. Renewable power generation simulators for the bipolar ${\pm}750V$ low-voltage DC power distribution system are necessary for such researches. In this paper, we carry out a research on the photovoltaic simulator that be actually able to interconnect with a bipolar ${\pm}750V$ low-voltage micro-grid. Simulator for this research is not only able to simulate photovoltaic generation according to weather informations and PV modules characteristics, but also contribute to stabilization of bipolar ${\pm}750V$ low-voltage of the system. Therefore, the simulator was designed to develop a system that can situationally respond to variable control algorithms such as the MPPT control, droop control, EMS power control, etc.

정전비용 고려한 PV시스템의 배전계통 연계 우선순위 결정에 관한 연구 (A Study on the Priority Decision for Interconnection of PV System on Power Distribution System considering Customer Interruption Costs)

  • 손창남;한운동;문종필
    • 전기학회논문지P
    • /
    • 제63권3호
    • /
    • pp.163-168
    • /
    • 2014
  • In this paper, when photovoltaic systems are connected to distribution system, most effective capacity and location of PV system are studied considering customer interruption costs of power distribution system. The reliability model of PV system considering the duration of sunshine, the model of time-varying load and Roy Billinton test system (bus2 model) are used. To simulate the effects of PV system, various cases are selected; (1) base case which is no connection of PV system to power distribution system when faults are occurred, (2) 3MW case which is 3[MW] connection of PV system (3) 4[MW] case, and (4) 20[MW] case which is 20[MW] connection of PV system to the bus of power distribution system. The capacity limit of connected PV system is settled to 14[MW] for all cases except case 4. The reliability and customer interruption costs for residential, general, industrial, and educational customer is evaluated.