• 제목/요약/키워드: Power ramp

검색결과 143건 처리시간 0.028초

비례제어밸브용 디지털 앰프.컨트롤러에 대한 연구 (A Study on a Digital Amplifier.Controller for Proportional Control Valve)

  • 이재천;고재욱;권태황;신행봉
    • 유공압시스템학회논문집
    • /
    • 제8권1호
    • /
    • pp.19-25
    • /
    • 2011
  • This study presents the design of digital amplifier.controller for a proportional control valve and the development of PID discrete control scheme by using RCP(Rapid Controller Prototyping) system. RCP system is the device to embed the control code developed in PC into the microcontroller on-site. Ramp input test using the digital amplifier.controller developed in this study was carried out for the proportional control valve of domestic production and Bosch Rexroth respectively. The instability problem occurred around maximum displacement of localized valve spool at ramp input test was solved by supplementing offset current to the duty ratio of PWM(Pulse Width Modulation) driving signal to the solenoid. The comparison of test results between localized proportional control valve and Bosch Rexroth's product shows that the characteristics obtained by ramp input test and static flow gains are alike each other. Two valves are about the same in dead bands and hysteresis characteristics.

Effect of Kinetic Parameters on Simultaneous Ramp Reactivity Insertion Plus Beam Tube Flooding Accident in a Typical Low Enriched U3Si2-Al Fuel-Based Material Testing Reactor-Type Research Reactor

  • Nasir, Rubina;Mirza, Sikander M.;Mirza, Nasir M.
    • Nuclear Engineering and Technology
    • /
    • 제49권4호
    • /
    • pp.700-709
    • /
    • 2017
  • This work looks at the effect of changes in kinetic parameters on simultaneous reactivity insertions and beam tube flooding in a typical material testing reactor-type research reactor with low enriched high density ($U_3Si_2-Al$) fuel. Using a modified PARET code, various ramp reactivity insertions (from $0.1/0.5 s to $1.3/0.5 s) plus beam tube flooding ($0.5/0.25 s) accidents under uncontrolled conditions were analyzed to find their effects on peak power, net reactivity, and temperature. Then, the effects of changes in kinetic parameters including the Doppler coefficient, prompt neutron lifetime, and delayed neutron fractions on simultaneous reactivity insertion and beam tube flooding accidents were analyzed. Results show that the power peak values are significantly sensitive to the Doppler coefficient of the system in coupled accidents. The material testing reactor-type system under such a coupled accident is not very sensitive to changes in the prompt neutron life time; the core under such a coupled transient is not very sensitive to changes in the effective delayed neutron fraction.

Economic Dispatch Using Hybrid Particle Swarm Optimization with Prohibited Operating Zones and Ramp Rate Limit Constraints

  • Prabakaran, S.;Senthilkuma, V.;Baskar, G.
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권4호
    • /
    • pp.1441-1452
    • /
    • 2015
  • This paper proposes a new Hybrid Particle Swarm Optimization (HPSO) method that integrates the Evolutionary Programming (EP) and Particle Swarm Optimization (PSO) techniques. The proposed method is applied to solve Economic Dispatch(ED) problems considering prohibited operating zones, ramp rate limits, capacity limits and power balance constraints. In the proposed HPSO method, the best features of both EP and PSO are exploited, and it is capable of finding the most optimal solution for the non-linear optimization problems. For validating the proposed method, it has been tested on the standard three, six, fifteen and twenty unit test systems. The numerical results show that the proposed HPSO method is well suitable for solving non-linear economic dispatch problems, and it outperforms the EP, PSO and other modern metaheuristic optimization methods reported in the recent literatures.

A 8-bit Variable Gain Single-slope ADC for CMOS Image Sensor

  • 박수양;손상희;정원섭
    • 전기전자학회논문지
    • /
    • 제11권1호통권20호
    • /
    • pp.38-45
    • /
    • 2007
  • A new 8-bit single-slope ADC using analog RAMP generator with digitally controllable dynamic range has been proposed and simulated for column level or per-pixel CMOS image sensor application. The conversion gain of ADC can he controlled easily by using frequency divider with digitally controllable diviber ratio, coarse/fine RAMP with class-AB op-amp, resistor strings, decoder, comparator, and etc. The chip area and power consumption can be decreased by simplified analog circuits and passive components. Proposed frequency divider has been implemented and verified with 0.65um, 2-poly, 2-metal standard CMOS process. And the functional verification has been simulated and accomplished in a 0.35$\mu$m standard CMOS process.

  • PDF

Bi-2223/Ag 고온초전도 선재의 bubbling 제어에 관한 연구 (A Study on Bubbling Control of Bi-2223/Ag HTS tapes)

  • 하홍수;오상수;하동우;송규정;김상철;권영길;류강식
    • 한국초전도저온공학회:학술대회논문집
    • /
    • 한국초전도저온공학회 2001년도 학술대회 논문집
    • /
    • pp.145-148
    • /
    • 2001
  • Bi-2223/Ag HTS tapes fabricated by PIT process are used to make the power transmission cable, motor, fault current limiter, transformer etc. But some problems are still remained as like bubbling, sausaging to got the high Jc. In this study. we carried out the experiment to prevent bubbling in the HTS tape. The bubbling mainly occurred when HTS tape was heat-treating. Therefore, additional vacuum annealing at 400 ~ $600^{\circ}C$and slowly ramp-up sintering method were used to decrease the bubbling. slowly ramp-up sintering was more effective to decrease the bubbling than the vacuum annealing, but Jc was also decreased after heat treatment. Optimum ramp-up sintering schedule was searched to get the high critical current and prevent bubbling at same time.

  • PDF

스트레스 한계가 있는 램프시험의 최적설계: 지수수명분포의 경우 (Time-Censored Ramp Tests with Stress Bound for Exponential)

  • 배도선;전영록;차명수
    • 대한산업공학회지
    • /
    • 제22권3호
    • /
    • pp.459-471
    • /
    • 1996
  • This paper considers ramp tests for exponential lifetime distribution when there are limitations on test stress and test time. The inverse power law and a cumulative exposure model are assumed. Maximum likelihood (ML) estimators of model parameters and their asymptotic covariance matrix are obtained. The optimum ramp test plans are also found which minimize the asymptotic variance of the ML estimator of the log mean life at design constant stress. For selected values of the design parameters, tables useful for finding optimal test plans are given. The effect of the pre-estimates of design parameters is studied.

  • PDF

Design of ramp-stress accelerated life test plans for a parallel system with two independent components using masked data

  • Srivastava, P.W.;Savita, Savita
    • International Journal of Reliability and Applications
    • /
    • 제18권2호
    • /
    • pp.45-63
    • /
    • 2017
  • In this paper, we have formulated optimum Accelerated Life Test (ALT) plan for a parallel system with two independent components using masked data with ramp-stress loading scheme and Type-I censoring. Consider a system of two independent and non-identical components connected in parallel. Such a system fails whenever all of its components has failed. The exact component that causes the system to fail is often unknown due to cost and time constraint. For each parallel system at test, we observe its system's failure time and a set of component that includes the component actually causing the system to fail. The stress-life relationship is modelled using inverse power law, and cumulative exposure model is assumed to model the effect of changing stress. The optimal plan consists in finding out the optimum stress rate using D-optimality criterion. The method developed has been explained using a numerical example and sensitivity analysis carried out.

  • PDF

Modified Particle Swarm Optimization with Time Varying Acceleration Coefficients for Economic Load Dispatch with Generator Constraints

  • Abdullah, M.N.;Bakar, A.H.A;Rahim, N.A.;Mokhlis, H.;Illias, H.A.;Jamian, J.J.
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권1호
    • /
    • pp.15-26
    • /
    • 2014
  • This paper proposes a Modified Particle Swarm Optimization with Time Varying Acceleration Coefficients (MPSO-TVAC) for solving economic load dispatch (ELD) problem. Due to prohibited operating zones (POZ) and ramp rate limits of the practical generators, the ELD problems become nonlinear and nonconvex optimization problem. Furthermore, the ELD problem may be more complicated if transmission losses are considered. Particle swarm optimization (PSO) is one of the famous heuristic methods for solving nonconvex problems. However, this method may suffer to trap at local minima especially for multimodal problem. To improve the solution quality and robustness of PSO algorithm, a new best neighbour particle called 'rbest' is proposed. The rbest provides extra information for each particle that is randomly selected from other best particles in order to diversify the movement of particle and avoid premature convergence. The effectiveness of MPSO-TVAC algorithm is tested on different power systems with POZ, ramp-rate limits and transmission loss constraints. To validate the performances of the proposed algorithm, comparative studies have been carried out in terms of convergence characteristic, solution quality, computation time and robustness. Simulation results found that the proposed MPSO-TVAC algorithm has good solution quality and more robust than other methods reported in previous work.

점증 선행 하중으로 개량하는 연약지반의 계측기반 침하량 예측방법 개발 (Prediction Method of Settlement Based on Field Monitoring Data for Soft Ground Under Preloading Improvement with Ramp Loading)

  • 우상인;윤찬영;백승경;정충기
    • 한국지반공학회논문집
    • /
    • 제24권10호
    • /
    • pp.83-91
    • /
    • 2008
  • 현장계측 자료를 이용하여 연약지반의 향후 침하거동을 예측하는 기존의 방법들은 모두 즉시재하 조건을 가정하고 개발된 방법으로써 실제로는 연약지반의 안정성 등을 고려하여 점증재하가 이루어지는 현장에 적용하기에는 많은 제약이 있다. 본 연구에서는 연약층의 두께, 성토하중 크기, 선행압밀하중, 배수거리, 성토속도 등의 다양한 영향인자를 고려하였으며 점증재하가 완료된 이후의 지반개량 기간에도 지속적으로 예측 정확도를 높일 수 있는 계측기반 침하거동 예측기법을 개발하였다. 점증재하 과정에서의 예측방법과 성토완료 이후의 예측방법이 개발되었으며, 성토 완료 이후의 예측방법은 기하학적 보정을 이용한 정확도 향상기법과 확률론적 보정을 이용한 정확도 향상기법 두 가지를 제안하였다. 대형압밀시험 결과를 이용한 예측기법의 적용성 검증 결과, 기존의 예측기법을 적용할 수 없는 점증재하 초기에도 비교적 적은 데이터를 이용하여 상당히 높은 정확도를 가지고 침하거동을 예측할 수 있었다. 또한, 성토완료이후에도 기존 예측기법과 제안된 방법의 비교, 분석 결과 최종침하량과 RMSE에서 모두 제안된 방법이 기존의 예측기법에 비하여 우수한 예측결과를 보였다.

발전기 출력특성을 고려한 최적전원구성 연구 (A Study of Optimal Fuel-Mix Considering Power Generation Operation)

  • 정영범;김길신;박창호;윤용범
    • 조명전기설비학회논문지
    • /
    • 제25권10호
    • /
    • pp.28-37
    • /
    • 2011
  • Though Korea has introduced CBP(Cost Based pool) power trading system since 2001, long-term Generation system planning has been executed by government for Cost minimization every 2 years. Until currently the model which is used for Generation system planning and best-mix only considers cost minimization and total yearly or quarterly electricity demand every year. In a view point of one day power supply operation, technical characteristics, like the ramp up/down rate of total generation system, minimum up/down time and GFRQ(Governor Free Response Quantity), are very important. this paper analyzes Optimal Fuel-Mix for 2022 Korea generation system satisfying these constraints of each fuel type and considering pump storage plants, construction cost and $CO_2$ emission charge Using MILP(Mixed Integer Linear Programming) method. Also the sensitivity analysis which follows in future power industry environmental change accomplished.