• Title/Summary/Keyword: Power prior

Search Result 617, Processing Time 0.029 seconds

Transient Heat Transfer Analysis on the Evaporator of a Micro-Cooler prior to Roiling (마이크로 쿨러 증발기의 비등 전 과도열전달 해석)

  • Park, Byeong-Gyu;Kim, Geun-O
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.26 no.2
    • /
    • pp.211-218
    • /
    • 2002
  • It has been investigated for the temperature profile in a planar evaporator of micro-cooler subject to a uniform heat flux prior to tole initiation of boiling. The results of the analysis allow for the determination of applied power levels fur which nucleation is likely to occur only within the vapor grooves of the evaporator while maintaining subcooling in the liquid core, thereby increasing the likelihood of a successful startup. Also, limits are fecund for which additional increases in the applied heat flux do not increase the temperature difference between the vapor grooves and the wick-liquid core interface. This analysis is appropriate for the microscale evaporators of micro-cooler during a fully-flooded startup as well as starter pump designs and micro-CPLs(capillary pumped loops). The results are useful in the initial basic design of microscale heat transfer devices.

Computationally efficient variational Bayesian method for PAPR reduction in multiuser MIMO-OFDM systems

  • Singh, Davinder;Sarin, Rakesh Kumar
    • ETRI Journal
    • /
    • v.41 no.3
    • /
    • pp.298-307
    • /
    • 2019
  • This paper investigates the use of the inverse-free sparse Bayesian learning (SBL) approach for peak-to-average power ratio (PAPR) reduction in orthogonal frequency-division multiplexing (OFDM)-based multiuser massive multiple-input multiple-output (MIMO) systems. The Bayesian inference method employs a truncated Gaussian mixture prior for the sought-after low-PAPR signal. To learn the prior signal, associated hyperparameters and underlying statistical parameters, we use the variational expectation-maximization (EM) iterative algorithm. The matrix inversion involved in the expectation step (E-step) is averted by invoking a relaxed evidence lower bound (relaxed-ELBO). The resulting inverse-free SBL algorithm has a much lower complexity than the standard SBL algorithm. Numerical experiments confirm the substantial improvement over existing methods in terms of PAPR reduction for different MIMO configurations.

Power Investigation of the Entropy-Based Test of Fit for Inverse Gaussian Distribution by the Information Discrimination Index

  • Choi, Byungjin
    • Communications for Statistical Applications and Methods
    • /
    • v.19 no.6
    • /
    • pp.837-847
    • /
    • 2012
  • Inverse Gaussian distribution is widely used in applications to analyze and model right-skewed data. To assess the appropriateness of the distribution prior to data analysis, Mudholkar and Tian (2002) proposed an entropy-based test of fit. The test is based on the entropy power fraction(EPF) index suggested by Gokhale (1983). The simulation results report that the power of the entropy-based test is superior compared to other goodness-of-fit tests; however, this observation is based on the small-scale simulation results on the standard exponential, Weibull W(1; 2) and lognormal LN(0:5; 1) distributions. A large-scale simulation should be performed against various alternative distributions to evaluate the power of the entropy-based test; however, the use of a theoretical method is more effective to investigate the powers. In this paper, utilizing the information discrimination(ID) index defined by Ehsan et al. (1995) as a mathematical tool, we scrutinize the power of the entropy-based test. The selected alternative distributions are the gamma, Weibull and lognormal distributions, which are widely used in data analysis as an alternative to inverse Gaussian distribution. The study results are provided and an illustrative example is analyzed.

Development of a Hybrid Power Generation System Using Photovoltaic Cells and Piezoelectric Materials (태양 전지와 압전 재료를 이용한 하이브리드 발전시스템 개발)

  • Kim, Yeongmin;Ahmed, Rahate;Zeeshan, Zeeshan;Chun, Wongee
    • Journal of the Korean Solar Energy Society
    • /
    • v.39 no.1
    • /
    • pp.51-58
    • /
    • 2019
  • This paper deals with the operation of a hybrid power generation system made with photovoltaic cells and piezoelectric materials. The system can produce power from the wind as well as from the sun subject to their availability. Irrespective of the largeness of their power production, the power developed by both generators (i.e., phtovoltaic cells and piezoelectric cells) were combined and stored before it was applied to a load. Especially, the AC power (current) developed from each piezoelectric generator was converted by a full wave bridge rectifier and then combined prior to its storage in a capacitor. It was observed that the system can produce a maximum output power of 6.49 mW at loading resistance of $100{\Omega}$.

LFG Utilization in Hong Kong (Case study of the Shuen Wan and Urban Landfills)

  • Lloyd, Bryce;Chan, Louis;Nardelli, Ray;Sullivan, Kevin
    • Proceedings of the Korean Institute of Resources Recycling Conference
    • /
    • 2001.05b
    • /
    • pp.85-91
    • /
    • 2001
  • This paper provides a case study of landfill gas (LFG) utilization fer direct use as process fuel, and for electrical power generation at restored landfills in the Hong Kong Special Administrative Region of China (HKSAR). The paper specifically covers the LFG utilization schemes, which are required under landfill restoration contracts at the Shuen Wan and Urban Landfills. These contracts provide for the restoration and aftercare of six landfills, and are administered by the Environmental Protection Department (EPD) of the Hong Kong Government. The LFG utilization scheme at the Shuen Wan Landfill incorporates the direct use of LFG by compressing and dehumidifying the LFG prior to conveyance through a 1.6-kilometer (1-mile) pipeline. The pipeline provides an alternate fuel source to naphtha during process heating for gas production at the Tai Po Gas Production Plant of the Hong Kong and China Gas Limited (HKCC). The LFG utilization scheme at the Jordan Valley Landfill (one of the Urban Landfills) beneficially uses the LFG as fuel for electrical power generation with reciprocating internal combustion engines. The LFG is compressed, cooled, and filtered prior to delivery to two engine/generator sets. This system provides power to operate the leachate pre-treatment plant, which processes leachate from all of the Urban Landfill sites. The case study will examine the technical and non-technical considerations, including harriers, for developing, designing and implementing the LFG utilization projects in Hong Kong. Specific regulatory considerations and external governmental agency approvals are discussed, including the requirement to register as a gas-producing utility. While the paper focuses on LFG utilization applications in Hong Kong, many of the considerations discussed are also applicable to development of LFG utilization in other regions of Asia.

  • PDF

Design and Evaluation of PMU Performance Measurement and GPS Monitoring System for Power Grid Stabilization

  • Yang, Sung-Hoon;Lee, Chang Bok;Lee, Young Kyu;Lee, Jong Koo
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.4 no.2
    • /
    • pp.67-72
    • /
    • 2015
  • Power grid techniques are distributed over general power systems ranging from power stations to power transmission, power distribution, and users. To monitor and control the elements and performance of a power system in real time in the extensive area of power generation, power transmission, wide-area monitoring (WAM) and control techniques are required (Sattinger et al. 2007). Also, to efficiently operate a power grid, integrated techniques of information and communication technology are required for the application of communication network and relevant equipment, computing, and system control software. WAM should make a precise power grid measurement of more than once per cycle by time synchronization using GPS. By collecting the measurement values of a power grid from substations located at faraway regions through remote communication, the current status of the entire power grid system can be examined. However, for GPS that is used in general national industries, unexpected dangerous situations have occurred due to its deterioration and jamming. Currently, the power grid is based on a synchronization system using GPS. Thus, interruption of the time synchronization system of the power system due to the failure or abnormal condition of GPS would have enormous effects on each field such as economy, security, and the lives of the public due to the destruction of the synchronization system of the national power grid. Developed countries have an emergency substitute system in preparation for this abnormal situation of GPS. Therefore, in Korea, a system that is used to prepare for the interruption of GPS reception should also be established on a long-term basis; but prior to this, it is required that an evaluation technique for the time synchronization performance of a GPS receiver using an atomic clock within the power grid. In this study, a monitoring system of time synchronization based on GPS at a power grid was implemented, and the results were presented.

A Study on Installation of Monitoring System of Wireless Power Transmission System (무선전력전송 시스템의 모니터링 시스템 구축에 관한 연구)

  • Song, Young-Sang;Han, Woon-Ki;Jung, Jin-Soo;Lim, Hyun-Sung;Cho, Sung-Koo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.4
    • /
    • pp.47-53
    • /
    • 2015
  • The electrical safety and efficiency is the most important thing of the electric vehicle charging system. The prior system is contact charging system that is contacted directly by human. So, it has riskiness such as electric shock in the case of poor insulation or contact problems. To solve these safety issues and the convenience problems, a wireless power transmission system has been developed and is currently in trial operation. However, because high frequency is used in wireless power transmission system instead of commercial frequency, we need to apply protection measures concerning electric shock and equipment protection. Also, it should be accompanied by measuring efficiency for the effective operation of the wireless power transmission system. Therefore, we structured monitoring system in trial operation area of wireless power transmission system and applied decision algorithm for protection of human and equipment and economic operation of it.

A Novel SIME Configuration Scheme Correlating Generator Tripping for Transient Stability Assessment

  • Oh, Seung-Chan;Lee, Hwan-Ik;Lee, Yun-Hwan;Lee, Byong-Jun
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.5
    • /
    • pp.1798-1806
    • /
    • 2018
  • When a contingency occurs in a large transmission route in a power system, it can generate various instabilities that may lead to a power system blackout. In particular, transient instability in a power system needs to be immediately addressed, and preventive measures should be in place prior to fault occurrence. Measures to achieve transient stability include system reinforcement, power generation restriction, and generator tripping. Because the interpretation of transient stability is a time domain simulation, it is difficult to determine the efficacy of proposed countermeasures using only simple simulation results. Therefore, several methods to quantify transient stability have been introduced. Among them, the single machine equivalent (SIME) method based on the equal area criterion (EAC) can quantify the degree of instability by calculating the residual acceleration energy of a generator. However, method for generator tripping effect evaluation does not have been established. In this study, we propose a method to evaluate the effect of generator tripping on transient stability that is based on the SIME method. For this purpose, the measures that reflect generator tripping in the SIME calculation are reviewed. Simulation results obtained by applying the proposed method to the IEEE 39-bus system and KEPCO system are then presented.

A new geophysical exploration method based on electrical resistivity to detect underground utility lines and geological anomalies: Theory and field demonstrations

  • Jo, Seon-Ah;Kim, Kyoung-Yul;Ryu, Hee-Hwan
    • Geomechanics and Engineering
    • /
    • v.18 no.5
    • /
    • pp.527-534
    • /
    • 2019
  • Although ground investigation had carried out prior to the construction, many problems have arisen during the civil-engineering works because of the presence of the unexpected underground utility lines or anomalies. In this study, a new geophysical exploration method was developed to solve those problems by improving and supplementing the existing methods. This new method was based on the difference of electrical resistance values between anomalies and surrounding ground medium. A theoretical expression was suggested to define the characteristics of the anomalies such as location, size and direction, by applying the electric field analysis. An inverse analysis algorithm was also developed to solve the theoretical expression using the measured electrical resistance values which were generated by the voltage flowing the subsurface medium. To verify the developed method, field applications were conducted at the sites under construction or planned. From the results of the field tests, it was found that not only the new method was more predictive than the existing methods, but its results were good agreed with the measured ones. Therefore, it is expected that application of the new exploration method reduces the unexpected accidents caused by the underground uncertainties during the underground construction works.

Development of Power Plant Simulator for Control System Verification & Validation (제어 검증용 발전소 시뮬레이터 개발)

  • Byun, Seung-Hyun;Hwang, Do-Hyun
    • Journal of the Korea Society for Simulation
    • /
    • v.19 no.1
    • /
    • pp.41-51
    • /
    • 2010
  • A control system has been being developed by korean engineers for 500MW korean standard type fossil power plant with the advent of retrofit of old control system. Simulators have been used for digital I&C system pre-tests and validation tests in nuclear power plants. In this paper, the power plant simulator for control system V&V was developed in order to verify the developed control system prior to application to a power plant. The control models were developed using plant control system data, translator programs, and vendor manuals. The developed simulator was verified by steady-state test, load swing test, transient test and so on.