• Title/Summary/Keyword: Power farm

Search Result 530, Processing Time 0.033 seconds

A Protective Scheme for Wind Farm Interconnected to Distribution System (풍력발전단지가 연계된 배전계통에서의 보호방안)

  • Kim, Kyoung-Ho;Lee, Jong-Beom;Seo, Je-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.478-480
    • /
    • 2002
  • Wind energy can be conversed into electrical power using wind generator. Wind farm is made up of many wind generators, and it is often interconnected into distribution system to supply power for utilities. There are many protection problems on distribution system connected with Wind farm. It can effect on power quality severely when faults are occurred on distribution line or Wind farms. Therefore the correct protective scheme must be set for distribution system which has a Wind farm. In this paper, A wind farm connected into distribution line is simulated with several fault types which can be occurred on distribution line and Wind farm using PSCAD/EMTDC. And this paper proposes necessary relays to protect both sides of distribution system and wind farm.

  • PDF

Hardware-in-the-loop Simulation Method for a Wind Farm Controller Using Real Time Digital Simulator

  • Kim, Gyeong-Hun;Kim, Jong-Yul;Jeon, Jin-Hong;Kim, Seul-Ki;Kim, Eung-Sang;Lee, Ju-Han;Park, Minwon;Yu, In-Keun
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.5
    • /
    • pp.1489-1494
    • /
    • 2014
  • A hardware-in-the-loop simulation (HILS) method for a wind farm controller using a real time digital simulator (RTDS) is presented, and performance of the wind farm controller is analyzed. A 100 MW wind farm which includes 5 MW wind power generation systems (WPGS) is modeled and analyzed in RSCAD/RTDS. The wind farm controller is implemented by using a computer, which is connected to the RTDS through transmission control protocol/internet protocol (TCP/IP). The HILS results show the active power and power factor of the wind farm, which are controlled by the wind farm controller. The proposed HILS method in this paper can be effectively utilized to validate and test a wind farm controller under the environment in practice without a real wind farm.

Salt Farm Parallel Solar Power System:Field tests and Simulations (염전 병행 태양광 발전의 실증과 시뮬레이션)

  • Park, Jongsung;Kim, Bongsuck;Gim, Geonho;Lee, Seungmin;Lim, Cheolhyun
    • Current Photovoltaic Research
    • /
    • v.7 no.4
    • /
    • pp.121-124
    • /
    • 2019
  • In this research, the concept of a salt farm parallel solar power system, which produce salt and electricity at the same site, is proposed for the first time in the world. The concept is that large waterproof plates made by interconnected solar modules are installed at the bottom of the salt farm. The pilot system was successfully installed at a sea shore, and verified its feasibility as a solar power plant. For deeper understanding, simulations for power prediction of the system were carried out and compared with the field test results. The power generation of the salt farm parallel system is comparable to conventional solar power plants. The cooling effect by sea water contributes more to the increase in the crystalline silicon photovoltaic module performance than the absorption loss due to sea water by maintaining certain height above the module.

A Study on the Determining ESS Capacity for Stabilizing Power Output of Haeng-won Wind Farm in Jeju (제주 행원 풍력발전단지의 출력 안정화를 위한 에너지저장시스템 용량산정에 관한 연구)

  • Kang, Myeong-Seok;Jin, Kyung-Min;Kim, Eel-Hwan;Oh, Sung-Bo;Lee, Jeong-Min
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.1
    • /
    • pp.25-31
    • /
    • 2012
  • This paper presents the characteristics of power generation output at Haeng-won wind farm and how to determine the optimized ESS capacity for power stabilizing. Depend on the fluctuation rate of wind power output variation, wind farm capacity and site, power stabilization will be impacted. Therefore, we need to determine proper ESS capacity. Using the actual data of Haeng-won wind farm from 2009. 3 to 2010.2., capacity of ESS was determined by moving average value. To verify the proposed algorithm, simulations are carried out with PSCAD/EMTDC program. As a result, optimal ESS capacity of Haeng-won wind farm in Jeju is estimated about 1.63 MWh.

Power Smoothening Control of Wind Farms Based on Inertial Effect of Wind Turbine Systems

  • Nguyen, Thanh Hai;Lee, Dong-Choon;Kang, Jong-Ho
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.3
    • /
    • pp.1096-1103
    • /
    • 2014
  • This paper proposes a novel strategy for attenuating the output power fluctuation of the wind farm (WF) in a range of tens of seconds delivered to the grid, where the kinetic energy caused by the large inertia of the wind turbine systems is utilized. A control scheme of the two-level structure is applied to control the wind farm, which consists of a supervisory control of the wind farm and individual wind turbine controls. The supervisory control generates the output power reference of the wind farm, which is filtered out from the available power extracted from the wind by a low-pass filter (LPF). A lead-lag compensator is used for compensating for the phase delay of the output power reference compared with the available power. By this control strategy, when the reference power is lower than the maximum available power, some of individual wind turbines are operated in the storing mode of the kinetic energy by increasing the turbine speeds. Then, these individual wind turbines release the kinetic power by reducing the turbine speed, when the power command is higher than the available power. In addition, the pitch angle control systems of the wind turbines are also employed to limit the turbine speed not higher than the limitation value during the storing mode of kinetic energy. For coordinating the de-rated operation of the WT and the storing or releasing modes of the kinetic energy, the output power fluctuations are reduced by about 20%. The PSCAD/EMTDC simulations have been carried out for a 10-MW wind farm equipped with the permanent-magnet synchronous generator (PMSG) to verify the validity of the proposed method.

Selection of Available Sector to Measure Power Generation for Validation of Wind Turbine Performance (풍력터빈 성능 검증을 위한 출력측정 유효영역 선정)

  • Oh, Ki-Yong;Jun, Hoon;Lee, Jun-Shin
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.525-528
    • /
    • 2009
  • Power generation of wind turbine which is installed in wind farm should be measured to predict economic feasibility of wind farm. Also electric power company want to verify wind turbine performance which is stated by manufacturer. The International Electrotechnical Commission(IEC) published 61400-12-1 "Power performance measurements of electricity producing wind turbines" for test of wind turbine power performance. In this paper, measurable sector of wind speed is analysed based on IEC 61400-12-1 to verify power curve of wind turbine with various wind turbine in wind farm.

  • PDF

A Study on the Application of DC HTS cable systems to enhance power transfer limits of a grid-connected offshore wind farm

  • Hur, Jin
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.2
    • /
    • pp.97-103
    • /
    • 2015
  • This paper introduces two on-going projects for DC high temperature superconducting (HTS) cable systems in South Korea. This study proposes the application of DC HTS cable systems to enhance power transfer limits of a grid-connected offshore wind farm. In order to develop the superconducting DC transmission system model based on HTS power cables, the maximum transfer limits from offshore wind farm are estimated and the system marginal price (SMP) calculated through a Two-Step Power Transfer (TSPT) model based on PV analysis and DC-optimal power flow. The proposed TSPT model will be applied to 2022 KEPCO systems with offshore wind farms.

Study of the Spatial Location Analysis for Domestic Offshore Wind Farm (국내 해상풍력 발전단지 입지 분석 연구)

  • Kim, Dong-Hwi;Lee, Yong-Jun;Ryu, In-Ho;Seo, Dae-Rim
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.504-511
    • /
    • 2010
  • After facing the fact such as fossil-fuel depletion, global warming, the Kyoto Protocol coming into force of mandatory reductions of carbon dioxide, the world is actively promoting the spread of the solar, wind, tidal, geothermal and other clean renewable energy technology development. Among them, wind power is the only alternative energy to secure a comparable price competition with fossil fuels because cheaper price power generation than other renewable energy when creating large-scale wind farm, thus wind power is the fastest growing industries in the world in the renewable energy field. Especially the offshore wind power is showing rapid growth as most of the wind power sector because of less changes of wind speed, no restrictions of land use, and large-scale development of offshore wind power. In this paper, the field of site selection and spatial location analysis techniques for development of large-scale offshore wind farm are discussed primarily. This paper shows overview of offshore wind power and establishment procedure for development of offshore wind farm.

  • PDF

A Study on the Power Loss Cost of Inner-Grid in the Offshore Wind Farm (해상풍력단지 내부그리드의 전력손실비용에 관한 연구)

  • Shin, Je-Seok;Kim, Sung-Yul;Bae, In-Su
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.3
    • /
    • pp.72-77
    • /
    • 2014
  • The cross-section area of cable in the Offshore Wind Farm (OWF) is smaller than that in the onshore wind farm. Because the power loss in OWF is large relatively, the power loss is a key element for the economic evaluation of OWF design. The availability of wind turbine in OWF and the size of OWF are larger than those of onshore wind farm. If the economic evaluation of OWF ignores the availability of wind turbines, the power loss cost of OWF is overpriced. Since there are so many wind turbines, also, the calculation of power loss should be more accurate. In this paper, a method to calculate power loss is proposed for the design of big and complex inner-grid in OWF. The 99.5MW OWF is used for case study to see what effect the proposed method have on the power loss cost.

A Study About Grid Impose Method On Real-Time Simulator For Wind-Farm Management System (풍력발전단지 관리·분석 시스템의 Real-Time Simulator 도입을 위한 계통모델 연동방안 연구)

  • Jung, Seungmin;Yoo, Yeuntae;Kim, Hyun-Wook;Jang, Gilsoo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.7
    • /
    • pp.28-37
    • /
    • 2015
  • Owing to the variability of large-scaled wind power system, the development of wind farm management technologies and related compensation methods have been receiving attention. To provide an accurate and reliable output power, certain wind farm adopts a specified management system including a wind prediction model and grid expectation solutions for considering grid condition. Those technologies are focused on improving the reliability and stability issues of wind farms, which can affect not only nearby system devices but also a voltage condition of utility grid. Therefore, to adapt the develop management system, an expectation process about voltage condition of Point of Common Coupling should be integrated in operating system for responding system requirements in real-time basis. This paper introduce a grid imposing method for a real-time based wind farm management system. The expected power can be transferred to the power flow section and the required quantity about reactive power can be calculated through the proposed system. For the verification process, the gauss-seidel method is introduced in the Matlab/Simulink for analysing power flow condition. The entire simulation process was designed to interwork with PSCAD for verifying real power system condition.