The Transactions of the Korean Institute of Electrical Engineers
/
v.45
no.4
/
pp.474-483
/
1996
In this paper, as a part of the method improving stability, the load-flow calculation in D.C. power system and the models for stability analysis are studied with A.C-D.C. interconnected power systems transmission performed. Moreover, the theory is established in relation to each control method of D.C. power systems. Then the stability of A.C-D.C.interconnected power systems is compared and considered by the way of dividing the operating control method of the rectifier inverter converter into ACR-AVR, APR-A.gamma.R, A.alpha.R-ACR. The dynamics characteristic of terminal voltage, frequency, active-reactive power and rotor angle of the generator with disturbances and load fluctuations is considered. In addition, the characteristic of direct voltage, direct current, power and control systems. From this the comparative analysis of the direct current control method, the possibility of the stability analysis of A.C.-D.C. interconnected power system is considered. (author). refs., figs., tabs.
Recently, due to the increase of power conversion devices and nonlinear loads with the development of information, communication and control technologies, the instantaneous minute interruption factors such as voltage & current harmonics, surge occurring frequency, instantaneous voltage variation, voltage unbalance, flicker etc. have greatly threatened the power quality, and the deterioration of electric power facilities and the functional error of controllers are increasing. As such an instantaneous minute interruption appears to be small and local, accurate evaluation with measurement is difficult and total analysis system is required through a wide range of power quality effect analysis such as the simultaneous measurement on various power supply phenomena and the analysis on the interrelation with system loads. Most of conventional power quality diagnosis equipments have beer developed and applied, which were able to measure the stability rate of frequency, the stability rate of voltage, the electricity-failure duration etc, However, they were insufficient to analyze the system present situation, understand the cause of the failure occurred by the problem of power quality and analyze out the phenomena. Accordingly, this study will address the development of the system for a wide range of power quality diagnosis over the present level, the system for supporting the determination such as the analysis on risk factors, failure mode and impact, the system for harmonic evaluation based on international standards(IEC 61000 Series) and the total power quality diagnosis network & system with the extension and openness as a local and national-scale broadband power quality diagnosis system.
The Transactions of The Korean Institute of Electrical Engineers
/
v.58
no.12
/
pp.2322-2327
/
2009
Uncertainty of power system operation increases due to complexity and facilities diversification in the power system. Therefore the importance of SCADA(Supervisory Control and Data Acquisition) system which obtain and manage the actual data in real-time is very important. Accordingly in the studies of power system analysis, the efforts to include real-time power system analysis in simulation and applications are made in many ways. The real-time communication characteristics of SCADA system is considered so as to develop the power system analysis program that matches actual system conditions. The observation and management of SCADA system is realized by Intouch which is mainly used for factory automation and PSS/E(Power System Simulator for Engineers) provides real time system data. SQL DB and Python language is used for real-time communication between the softwares. It is very comfortable to use the various functions in Intouch WindowMaker.
1.Power utilities and CRIEPI are very active in almost all aspects of power systems research. 2.About 50% of research activity of CRIEPI is made under the joint work with power utilities. 3.Research motivation of manufactures are mainly stimulated by the need of power utilities and manufacturers are closely collaborating with power utilities. 4.Main effort of universities is concentrated upon the theoretical aspects of network analysis and the means of stability improvement. Univer sities are doing research rather independently of industry unless inexceptional cases. 5.Universities are making a significant contribution to the exploration of new horizon of power systems engineering, namely, in the research on the social impact on the future of power system. 6.Current main interest of power systems reserch is centered around the stability problem and power system operation and control. Research activity in power system planning is rather low as compared to that in these two major fields. A similar statement holds for the analysis of electromagnetic transients and short circuit analysis. However a new research field is sprouting in the area of power system protection.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.25
no.8
/
pp.140-149
/
2011
This paper deals with the impact analysis of the impedance change of 345/154[kV] power transformers on the KEPCO system's overall performance. Through the steady-state and dynamic analysis of power system, the maximum available impedance of power transformers were determined. Checking violation of short-circuit current ratings and transformer overload, parallel operation of power transformers, calculation of voltage variation ratio according to the impedance changes of power transformers are included in the steady-state analysis. In addition, transient and voltage stability analysis are also performed in the study. Available magnitudes to be able to change the impedance of the transformers in KEPCO system are finally determined in the paper.
Kim Gi Hyun;Park Chang Hyun;Lee Yil Hwa;Jang Gil Soo
Proceedings of the KIEE Conference
/
summer
/
pp.64-66
/
2004
Due to the involvedness of power system, the analysis of power system is hard to make out. In some cases, visualized analysis results help to understand the power system effectively. In this paper, 3D graphic is used to visualize the power system, and chains of power system's changes are represented using the result of HyperSim, a real-time simulator. We represent states of each bus by changing height and colors of cylinder. The current of transmission lines and the angle of generators are represented by the size of pyramids and the drection of arrows respectively. Results of power system analysis are represented more easily and more intuitably using the visualization.
Transactions of the Korean Society of Mechanical Engineers A
/
v.28
no.6
/
pp.717-725
/
2004
A power generation systems are proposed to convert ambient mechanical vibration into electrical energy using cantilever-type piezoelectric materials. The vibration-based power device can be used for self-powered systems without batteries. This paper presents the theoretical analysis for the coupled equations of piezoelectric and structural motions and investigates the dynamic characteristics of the self-power system using transfer function method. The theoretical model is verified by the finite element analysis of the resonance frequency, the dynamic response of the structure and the sensor sensibility. Experimental results measured using a prototype system agree with the theoretical predictions. The system is shown to produce 34.5 ㎼ in average. Finally, we perform the optimal design for system variables to maximize output power.
Kim, Sung-Wan;Jeon, Bub-Gyu;Hahm, Dae-Gi;Kim, Min-Kyu
Nuclear Engineering and Technology
/
v.51
no.2
/
pp.561-572
/
2019
In the design criterion for the nuclear power plant piping system, the limit state of the piping against an earthquake is assumed to be plastic collapse. The failure of a common piping system, however, means the leakage caused by the cracks. Therefore, for the seismic fragility analysis of a nuclear power plant, a method capable of quantitatively expressing the failure of an actual piping system is required. In this study, it was conducted to propose a quantitative failure criterion for piping system, which is required for the seismic fragility analysis of nuclear power plants against critical accidents. The in-plane cyclic loading test was conducted to propose a quantitative failure criterion for steel pipe elbows in the nuclear power plant piping system. Nonlinear analysis was conducted using a finite element model, and the results were compared with the test results to verify the effectiveness of the finite element model. The collapse load point derived from the experiment and analysis results and the damage index based on the stress-strain relationship were defined as failure criteria, and seismic fragility analysis was conducted for the piping system of the BNL (Brookhaven National Laboratory) - NRC (Nuclear Regulatory Commission) benchmark model.
Xu Zhang;Zhiguang Deng;Yifan Jian;Qichang Huang;Hao Peng;Quan Ma
Nuclear Engineering and Technology
/
v.55
no.5
/
pp.1901-1910
/
2023
The safety-class (1E) digital control system (DCS) of nuclear power plant characterized structural multiple redundancies, therefore, it is important to quantitatively evaluate the reliability of DCS in different degree of backup loss. In this paper, a reliability evaluation model based on T-S fuzzy fault tree (FT) is proposed for 1E DCS of nuclear power plant, in which the connection relationship between components is described by T-S fuzzy gates. Specifically, an output rejection control system is chosen as an example, based on the T-S fuzzy FT model, the key indicators such as probabilistic importance are calculated, and for a further discussion, the T-S fuzzy FT model is transformed into Bayesian Network(BN) equivalently, and the fault diagnosis based on probabilistic analysis is accomplished. Combined with the analysis of actual objects, the effectiveness of proposed method is proved.
Every engineering discipline has, in recent year, felt the impact of computer-aided analysis and design Normally the studies of power system analysis by computer are load flow, short circuit and harmonic calculation, the amount the voltage deviates from motor starting, reliability and system stability. These studies are very important from the operating and planning points of power system. This paper presents analysis of load flow, short circuit current calculation, the effect for voltage deviation of induction motor starting and harmonic distortion in power system of continuous casting(C. C) plant. The resulting of analysis is applied the configuration and design engineering of power system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.