• 제목/요약/키워드: Power Quality Cost

검색결과 437건 처리시간 0.022초

Cost-effective Power System with an Electronic Double Layer Capacitor for Reducing the Standby Power Consumption of Consumer Electronic Devices

  • Park, Kyung-Hwa;Yi, Kang-Hyun
    • Journal of Power Electronics
    • /
    • 제13권3호
    • /
    • pp.362-368
    • /
    • 2013
  • Commercial home appliances using remotely controlled systems consume electric power while in standby mode to prepare for receiving a remote turn-on signal. The proposed power system can significantly reduce standby power consumption without increasing cost. Furthermore, since a Electronic Double Layer Capacitor (EDLC) is used as an auxiliary power storage element, the life cycle is longer and system reliability can be better than with existing approaches. When the energy of the EDLC is not sufficient for turning on the appliance, the power system charges the EDLC without affecting the main system. The proposed power system is verified with a commercial LCD TV and a 3.93mW standby consumption is obtained. This standby consumption can be regarded as zero standby equipment according to the IEC-62031 standard.

다이나믹 UPS 시스템의 전력품질 외란발생을 위한 전압 Sag-Swell 발생기 (Voltage Sag-Swell Generator for Power Quality Disturbance of Dynamic UPS System)

  • 변우열;김중원;이기수;노의철;김인동;전태원;김흥근
    • 전력전자학회논문지
    • /
    • 제10권1호
    • /
    • pp.102-107
    • /
    • 2005
  • 본 논문에서는 새로운 방식의 전압 sag-swell 발생기를 제안하여 UPS(Uninterruptible Power Supply), DVR(Dynamic Voltage Restorer), DSTATCOM(Distribution Static Compensator), SSTS(Solid State Transfer Switch)등의 전력품질 개선장치들의 성능시험을 하는데 용이하도록 하였다. 제안한 방식에 대하여 단상과 3상의 경우 전압 sag, swell, outage, unbalance 발생원리 및 동작원리를 설명하였으며 시뮬레이션과 실험을 통하여 효용성을 입증하였다. 제안한 방식은 간단한 구조, 높은 신뢰도, 넓은 전압변동발생 범위, 간단한 제어 등의 장점 뿐 아니라 저렴한 비용으로 시스템을 구현할 수 있는 특징이 있으므로, 특히 실험실 레벨에서 효과적으로 경제적인 시스템을 구현하고자 하는 경우에 크게 기여할 것으로 기대한다.

An Input Current Waveshaping AC-DC Converter for Rectifier Loads

  • Singh, Bhim;Garg, Vipin;Bhuvaneswari, G.
    • Journal of Power Electronics
    • /
    • 제8권1호
    • /
    • pp.1-9
    • /
    • 2008
  • This paper presents the design and analysis of a new input AC current wave shaping AC-DC converter for cost effective harmonic mitigation under varying loads. The proposed converter consists of a delta-polygon connected autotransformer based twelve-pulse AC-DC converter and a small rating passive shunt filter tuned at $11^{th}$ harmonic frequency. The proposed AC-DC converter eliminates the most dominant $5^{th},\;7^{th}$ and $11^{th}$ harmonics and reduces higher order harmonics; thereby, resulting in an improved power quality at AC mains. Moreover, the design of the autotransformer is modified to make it suitable for retrofit applications, where presently a 6-pulse diode bridge rectifier is used. To validate the proposed approach, various power quality indices are presented under varying loads. Experimental results obtained on the developed converter are given to validate the model and design of the proposed converter.

Geophysical investigations for deciding alignment of head race tunnel and location of lake tapping at Koyna hydroelectric project, Maharashtra, India

  • Wadhwa R. S.;Chaudhari M. S.;Chandrasekhar V.;Saha A.;Mukhopadhyay R.
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2003년도 Proceedings of the international symposium on the fusion technology
    • /
    • pp.370-378
    • /
    • 2003
  • Continuous seismic refraction, reflection and echo-sounder surveys conducted at Koyna Project site provided geotechnical information which helped in choosing the alignment for Head race tunnel and in designing and choosing the site for Lake Tap. Seismic refraction survey both on land and in shallow water determined depths to bedrock and helped in inferring the bedrock quality. Seismic reflection survey mapped the subsurface stratigraphy with high resolution. Reservoir-bed and bedrock contours drawn from the results of the survey helped in choosing the tunnel alignment and the lake tap position cost effectively. It was inferred from the results of the survey that the geology and the quality of rock do not change unexpectedly around the site for extension of Head race tunnel and the lake tapping. The bedrock levels evaluated by seismic survey agreed remarkably well with those inferred in boreholes having Rock Quality Designation 90 percent or more.

  • PDF

전력품질을 고려한 LVDC 배전계통의 신뢰도 분석 (A Reliability Analysis in LVDC Distribution System Considering Power Quality)

  • 노철호;김충모;김두웅;권기현;오윤식;한준;김철환
    • 조명전기설비학회논문지
    • /
    • 제29권4호
    • /
    • pp.54-61
    • /
    • 2015
  • Recently, DC-based power system is being paid attention as the solution for energy efficiency. As the example, HVDC (High Voltage DC) transmission system is utilized in the real power system. On the other hand, researches on LVDC (Low Voltage DC) distribution system, which are including digital loads, are not enough. In this paper, reliability in LVDC distribution system is analyzed according to the specific characteristics such as the arrangement of DC/DC converters and the number of poles. Furthermore, power quality is also taken account of since LVDC distribution system includes multiple sensitive loads and electric power converters. In order to achieve this, LVDC distribution systems are modeled using ElectroMagnetic Transient Program (EMTP) and both the minimal cut-set method and Customer Interruption Cost (CIC) are used in the reliability analysis.

온라인 전기자동차 시스템의 고조파 및 고주파가 배전계통에 미치는 영향에 관한 연구 (Effect of Harmonics and High-Frequency on OLEV System in Distribution Power System)

  • 최성호;허재선;한운기;김재철
    • 전기학회논문지
    • /
    • 제63권6호
    • /
    • pp.738-745
    • /
    • 2014
  • Recently, various measures have been discussed for overcoming depletion of fossil fuels and environmental pollution. One of the measures is electric vehicles. But electric vehicles has some limitations from high cost of battery and low efficiency, so operation distance of electric cars is limited. Also there are difficulties that charging lines should be connected by an electric car whenever it charges. Thus, many studies have been conducted to overcome the limitation using conventional batteries of electric vehicles. As a result, the OLEV(On-Line Electric Vehicle) was developed. But the OLEV system is some limitations. The OLEV system causes power quality problems when it charges. Power quality problem cannot be ignored because OLEV systems are closely connected by distribution grids. In this paper, the OLEV system is designed by using PSCAD/EMTDC, and the power quality is measured and evaluated. Power quality is divided by two cases; harmonics and high-frequency. Harmonics were evaluated according to IEEE Std. 519-1992. But the evaluation of High-frequency could not take it because there was no standard. For this reason, the data measured by OLEV system was compared with the EN50065 regulation.

표준석탄화력 발전소 해수온도 상승에 따른 복수기 압력 손실 최소화 방안 (A Study on Minimizing of Condenser Pressure Loss according to the Temperature Rise of the Seawater for Korean Standard Coal-fired Power Plants)

  • 안효열;문승재
    • 플랜트 저널
    • /
    • 제11권2호
    • /
    • pp.45-51
    • /
    • 2015
  • 손실비용을 고려하여 발전소 효율에 큰 영향을 미치는 복수기의 운전 관리 방안을 연구하였다. 2013년 S발전소의 해수온도는 복수기 압력과 뚜렷한 상관관계를 보였으며, 해수온도가 변화함에 따라 복수기 압력은 설계 압력 38.1 mmHg 보다 -1.7~+20 mmHg의 차이로 운전되었다. 제작사에서 제시한 열소비율 보정곡선을 통해 복수기 압력 1 mmHg 증가시 1,2호기 0.0201%, 3,4호기 0.0155%의 효율 손실과 1,2호기 12,830 원/h, 3,4호기 9,832 원/h의 시간당 손실비용이 발생함을 알 수 있었다. 또한 계절별 대응운전, 설비 노후화, 예방정비 시점에 따른 손실비용의 차이를 확인하고 월별 관리범위를 설정하였다. 이를 통해 운전 관리범위 준수, 손실비용을 고려한 정비 계획 수립으로 최소 2.5억원/년(1호기, 40일 정비)의 관리적 손실을 줄일 수 있을 것으로 판단된다.

  • PDF

발전소 시뮬레이터 I/O 인터페이스 시스템 구축에 관한 연구 (An Implementation of I/O Interface System for Power Plant Simulator)

  • 변승현;장태인;조지용;곽귀일
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 1999년도 하계종합학술대회 논문집
    • /
    • pp.773-776
    • /
    • 1999
  • For providing good quality power steadily, it is required that operators manipulate the control system of power plant with the good knowledge of power plant system and the control strategies, and cope with accidents effectively. With those requirements, it is general to train operators in power plant control room using full-scope simulator. A full scope simulator adopts the I&C instruments in the main cotrol room, so has to include I/O interface system to interface the simulation computer with I&C instruments in main control room. In already developed simulators, most of I/O interface systems are closed. vendor-dependent. proprietary systems. so have the many disadvantages in terms of cost and maintenance. In this paper. we suggest the method to configure I/O interface system for Thermal Power Plant Simulator based on standard technology which gives the advantages of ease-of-use. cost effectiveness, and simplicity of maintenanceuse by using off-the-shelf products for system integration.

  • PDF

화공플랜트 프로젝트에서 통합관리 소프트웨어 적용에 관한 연구 (A Study on the Application of an Integrated Management Software for a Petrochemical Plant Project)

  • 김윤;이동언;유호선
    • 플랜트 저널
    • /
    • 제6권2호
    • /
    • pp.56-61
    • /
    • 2010
  • In this paper, an integrated management software is developed to promote the business competitive power. The interoperability among the software accounts for an ever growing performance of petrochemical plant project. If the interoperability is built up, company has taken advantages of quality, schedule, cost, and safety by active communication. The advantage of an integrated management software is examined in three aspects. In efficiency aspect, It takes advantage of the saving about the various information and the standard of project performance procedure. In quality, the integration gave aid to a quality improvement through team collaboration and data management within project life cycle. In cost, poor communications between systems waste 30% of project costs. If information could be inputted once and used by all, reductions in delivery time up to 40% were possible. Therefore, 10% savings of engineering cost was also possible.

  • PDF

배전계통 운영비용의 최소화에 의한 분산전원의 최적용량과 위치결정 (Optimal capacity and allocation of distributed generation by minimum operation cost of distribution system)

  • 박정훈;배인수;김진오;심헌
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.360-362
    • /
    • 2003
  • In operation of distribution system, DGs(Distributed Generations) are installed as an alternative of extension and establishment of substations, transmission and distribution lines according to increasing power demand. Optimal capacity and allocation of DGs improve power quality and reliability. This paper proposes a method for determining the optimal number, size and allocation of DGs needed to minimize operation cost of distribution system. Capacity of DGs for economic operation of distribution system can be estimated by the load growth and line capacity during operation planning duration. DG allocations are determined to minimize total cost with failure rate and annual reliability cost of each load point using GA(Genetic Algorithm).

  • PDF