• 제목/요약/키워드: Power Quality Cost

검색결과 437건 처리시간 0.027초

플라이휠 저장에너지 UPS의 성능 시험을 위한 순간정전 및 전압불평형 발생기 (Outage and Voltage Unbalance Generator for the Test of Flywheel Energy Storage UPS)

  • 김중원;이기수;변우열;노의철;김인동;전태원;김흥근
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2004년도 전력전자학술대회 논문집(2)
    • /
    • pp.570-574
    • /
    • 2004
  • This paper deals with a novel 3-phase power quality disturbance generator. The proposed generator can be applied to the performance that of custom power devices. Voltage sag, swell, outage unbalance and phase shift are provided by the generator. The control scheme for the disturbance generation is simple, and hardware setup is cost effective compared with conventional scheme. The operating principle of the generator is described and the usefulness verified through simulation with 10kVA power rating.

  • PDF

부밴드 MUSIC/ESPRIT를 이용한 전력신호 고조파 및 중간고조파 검출 및 추정 (Harmonic and Interhamonic Detection and Estimation of Power Signal using Subband MUSIC/ESPRIT)

  • 최훈;배현덕
    • 전기학회논문지
    • /
    • 제64권1호
    • /
    • pp.149-158
    • /
    • 2015
  • This paper proposes a subband filtering technique to the MUSIC and the ESPRIT algorithm for estimating the magnitude and frequency of the harmonics of power signal. In proposed method, the input power signal is decomposed to the odd harmonics and the even harmonics respectively by the filter bank system. The amplitude and the frequency estimation of the decomposed harmonics are carried out using the MUSIC and the ESPRIT method. Subband filtering can reduce the autocorrelation matrix size of input data, and spectrum leakage between adjacent harmonics. Therefore, this subband technique has advantage in computational cost and estimation accuracy compared to fullband MUSIC and ESPRIT. To demonstrate the performance of the method, computer simulations are performed to the synthesized input signal, and experiment results are compared in subband and fullband cases.

광케이블을 이용한 발전소 계측제어시스템 (Power plant instrumentation and control system by using optical fiber cable)

  • 신건학;조홍근;오면택
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1990년도 한국자동제어학술회의논문집(국내학술편); KOEX, Seoul; 26-27 Oct. 1990
    • /
    • pp.79-84
    • /
    • 1990
  • Analog systems could not fully deal with instrumentation and control facilities in power plants since these facilities have become more and more complex on account of various needs for large power generation capacity highly cost effective operation to conserve energy and operation management to prevent pollution. Digitalizations of control device and augmentations of control informations increased the necessity of fiber optic data networks which have excellent noise immunity and high quality wide-band with information transfer capability. The goal of this study is to offer a fiber optic data-way system which has high reliabilities, high data transmission rates and small cable ducts with large transmission capacities for the instrumentation and control of power plants.

  • PDF

66kV XLPE Cable용 조립형 접속함의 개발 (Development of Prefabricated Joint for 66kV Cross Linked Polyethylene Cable.)

  • 오응종;김기영;이준용;박정기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 E
    • /
    • pp.2123-2125
    • /
    • 1999
  • In recent the XLPE cable has been applied more widely because of its advantages, such as the low-cost and simple installation. For a prefabricated joint, its working time is short, its jointing procedures aγe simple, and its quality control is easy. Electrical performance targets of our developed 66kV cable accessories has been approved through the type test in accordance with IEC publication 840. This paper describes the developmental effort in terms of the design, structure and results of performance verification tests for 66kV XLPE cable system.

  • PDF

765kV 송전선로 유지.보수 활선공법 고찰 (765kV Transmission maintenance live-line work study)

  • 최한열;민병욱
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.723-724
    • /
    • 2007
  • Live line work is well known for mending and maintenance of electrical power equipment. Nowadays needs of electric power supply quality require live line work In Korea, live line work is needed since 765kV transmission operation and restructure of electric power industry has changed. In other words, in case of suspension of power supply on the transmission is getting hard to keep up with efficiency of transmission operation, customer's confidence and generation-limited cost. Therefore live line work is very meaningful. As the condition of 765kV Transmission both bare hand and Helicopter live line technique must be used in moderation because of economic, geographical, environmental circumstances around steel tower.

  • PDF

배전용 변압기의 실시간 고조파 분석 알고리즘 개발 (The Development of Real-Time Harmonic Analysis Algorithm in Distribution Transformer)

  • 박철우
    • 조명전기설비학회논문지
    • /
    • 제27권3호
    • /
    • pp.43-49
    • /
    • 2013
  • Recently harmonics flowing into power system is increasing as the usage of semiconductor equipments and switching mode power equipments are increasing. Harmonics cause problems such as heat increasing and reduction in capacity of transformers, especially the harmonics flowing into a distribution transformer can lead to the lifetime reduction of transformer. In this paper, we are about to develop a device that can monitor harmonics in real-time as it is affixed to a distribution transformer. Unlike the existing expensive harmonic analysis device, a new harmonic analysis algorithm is proposed in order to implement low-cost equipment. The real-time harmonic analysis algorithm proposed in this paper allows implementation on low performance microcontrollers, thus it can monitor the harmonic in real-time as it is individually affixed to the transformer. Therefore, it would improve the reliability of the transformer and stable power system operation would be possible as it can prevent the transformer accidents in advance.

2700kW급 고주파 유도가열장치의 전원시스템 시뮬레이션 (Simulation of High-Frequency Induction-Heating Application Power Supply at 2700kW Power)

  • 이광수;고희석;이영호;이현우
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 추계학술대회 논문집 학회본부A
    • /
    • pp.189-191
    • /
    • 1998
  • The development of the high- frequency induction-heating for 2700kW power range intend to make localization at forging and rolling mill part by technical innovation. And, the development makes to increase our's competitive power at technique, quality and cost. This paper describes the heart of high-frequency induction-heating technique, switching technique, a few problem in common using as an unsatisfied technique, load adjustment technique, system control, diagnostic system and auto-interface etc.

  • PDF

기어피치분석 및 공정관측을 위한 PC기반시스템 구축 (A PC-Based System for Gear Pitch Analysis and Monitoring in Gear Manufacturing Process)

  • 김성준;지용수
    • 품질경영학회지
    • /
    • 제30권3호
    • /
    • pp.111-119
    • /
    • 2002
  • Gears are essential elements for mechanical power transmission. Geometric precision is the main factor for characterizing gear grade and qualify. Gear pitch is one of the crucial measurements, which is defined as a distance between two adjacent gear teeth. It is well-known that variability in gear pitches may causes wear-out and vibration noise. Therefore maintaining pitch errors at a low level plays a key role in assuring the gear quality to customers. This paper is concerned with a case study, which presents a computerized system for Inspecting pitch errors in a gear machining process. This system consists of a PC and window-based programs. Although the start and stop is manually accomplished, the process of measuring and analyzing pitch data is automatically conducted in this system. Our purpose lies in reducing inspection cost and time as well as Increasing test reliability. Its operation is briefly illustrated by example. Sometimes a strong autocorrelation is observed from pitch data. We also discuss a process monitoring scheme taking account of autocorrelations.

Development of the Numerical Guide for Cost-Benefit Analysis of Occupational Radiation Exposure In the Korean Next Generation Reactor

  • Sohn, Ki-Yoon;Kang, Chang-Sun
    • Nuclear Engineering and Technology
    • /
    • 제29권1호
    • /
    • pp.78-84
    • /
    • 1997
  • The specific purpose of this study is to develop the numerical guide for the cost-benefit analysis of ORE ($/person-Sv reduction) to meet the criterion of ALARA in the design stage of the KNGR. In deriving the guide, the risk factor which is defined by the risk to unit collective radiation exposure dose (deaths/person-Sv) and the monetary value of human life ($/death) are required. The risk factor has been estimated from various clinical data accumulated for a number of years and continuously modified. And the monetary value of human life is usually quantified using the human capital approach. In this study, the risk to radiation exposure perceived by a group of people is investigated through an extensive poll survey conducted among university students in order to modify the existing risk factor for radiation exposure. And in evaluating the monetary value of human life, the QOL factor is introduced in order to incorporate the degree of public welfare or quality of life. As a result of study, a value within the range of 151, 000~172, 000 dollars per person-Sv reduction is recommended as the appropriate interim numerical guide for cost-benefit analysis of ORE to meet the criterion of ALARA in the design stage of the KNGR. A poll survey was also conducted in order to see whether the public acceptance cost of nuclear power should be incorporated in developing the guide, and the result of study shooed that such a cost does not need to be considered.

  • PDF

순간전압강하 보상을 위한 확률론적 위험도 분석 연구 (Probabilistic Method of Risk Assessment in Voltage Sag Mitigation Studies)

  • 한종훈;장길수;박창현
    • 전기전자학회논문지
    • /
    • 제14권3호
    • /
    • pp.236-243
    • /
    • 2010
  • 전력품질 문제는 다양한 산업분야에서 중요한 역할을 차지한다. 전력품질솔루션 선택의 폭은 점점 다양해지고 있으며, 특히 순간전압강하와 정전에 대한 보상장치를 선정하는 것은 전력회사나 수용가 모두에게 중요한 과제이다. 이것은 기술적인 관점에서 뿐만 아니라 경제적인 관점에서도 같이 고려되어야 하는데 불행히도 지금까지는 주로 경험에 의해 결정되어졌다. 본 논문에서는 순간전압강하 보상장치 선정을 위한 위험도 분석을 확정적 방법과 확률론적 방법으로 수명비용을 계산하여 두 가지 방법의 결과 해석에 대한 차이점을 모의사례를 통하여 비교하고자한다.