• Title/Summary/Keyword: Power Plant Boiler

Search Result 345, Processing Time 0.046 seconds

The Development of Boiler Furnace Pressure Control Algorithm and Distributed Control System for Coal-Fired Power Plant (석탄화력발전소 보일러 노내압력 제어알고리즘과 분산제어시스템의 개발)

  • Lim, Gun-Pyo;Hur, Kwang-Bum;Park, Doo-Yong;Lee, Heung-Ho
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.62 no.3
    • /
    • pp.117-126
    • /
    • 2013
  • This paper is written for the development and application of boiler furnace pressure control algorithm and distributed control system of coal-fired power plant by the steps of design, coding, simulation test, site installation and site commissioning test. The control algorithms were designed in the shape of cascade control for two parts of furnace pressure control and induced draft fan pitch blade by standard function blocks. This control algorithms were coded to the control programs of distributed control systems. The simulator for coal-fired power plant was used in the test step and automatic control, sequence control and emergency stop tests were performed successfully like the tests of the actual power plant. The reliability was obtained enough to be installed at the actual power plant and all of distributed control systems had been installed at power plant and all signals were connected mutually. Tests for reliability and safety of plant operation were completed successfully and power plant is being operated commercially. It is expected that the project result will contribute to the safe operation of domestic new and retrofit power plants, the self-reliance of coal-fired power plant control technique and overseas business for power plant.

Effect of Recirculated Exhaust Gas upon Performance and Exhaust Emissions in Power Plant Boilers with FGR System (FGR 시스템 공력 플랜트 보일러의 성능 및 배기 배출물에 미치는 재순환 배기의 영향)

  • Bae, Myung-Whan;Jung, Kwong-Ho;Choi, Seung-Chul;Cho, Yong-Soo;Kim, Yi-Suk
    • Proceedings of the KSME Conference
    • /
    • 2004.11a
    • /
    • pp.1686-1691
    • /
    • 2004
  • The effect of recirculated exhaust gas on performance and exhaust emissions with FGR rate are investigated by using a natural circulation, pressurized draft and water tube boiler with FGR system operating at several boiler loads and over fire air(OFA) damper openings. The purpose of this study is to apply the FGR system to a power plant boiler for reducing $NO_{x}$ emissions. To activate the combustion, the suction damper of two stage combustion system installed in the upper side of wind box is opened by handling the lever between $0^{\circ}$ and $90^{\circ}$ , and the OFA with 0 to 20% into the flame is supplied, as the combustion air supplied to burner is reduced. It is found that the fuel consumption rate divided by evaporation rate does not show an obvious tendency to increase or decrease with rising the FOR rate, and $NO_{x}$ emissions are decreased, at the same OF A damper opening, as FOR rates are elevated and boiler loads are dropped.

  • PDF

FPGA application for wireless monitoring in power plant

  • Kumar, Adesh;Bansal, Kamal;Kumar, Deepak;Devrari, Aakanksha;Kumar, Roushan;Mani, Prashant
    • Nuclear Engineering and Technology
    • /
    • v.53 no.4
    • /
    • pp.1167-1175
    • /
    • 2021
  • The process of automation and monitoring in industrial control system involves the use of many types of sensors. A programmable logic controller plays an important role in the automation of the different processes in the power plant system. The major control units are boiler for temperature and pressure, turbine for speed of motor, generator for voltage, conveyer belt for fuel. The power plant units are controlled using microcontrollers and PLCs, but FPGA can be the feasible solution. The paper focused on the design and simulation of hardware chip to monitor boiler, turbine, generator and conveyer belt. The hardware chip of the plant is designed in Xilinx Vivado Simulator 17.4 software using VHDL programming. The methodology includes VHDL code design, simulation, verification and testing on Virtex-5 FPGA hardware. The system has four independent buzzers used to indicate the status of the boiler, generator, turbine motor and conveyer belt in on/off conditions respectively. The GSM is used to display corresponding message on the mobile to know the status of the device in on/off condition. The system is very much helpful for the industries working on plant automation with FPGA hardware integration.

A Welding Characteristics of Large Caliber-Thick Plate Pressure Vessel Low Alloy Steel (Mn-Mo) (대구경-후판 압력용기용 저 합금강(Mn-Mo)의 용접특성)

  • Ahn, Jong-Seok;Park, Jin-Keun;Yoon, Jae-Yeon
    • Journal of Welding and Joining
    • /
    • v.30 no.6
    • /
    • pp.10-14
    • /
    • 2012
  • Recently the low alloy steel plate made with manganese-molybdenum is used widely in steam drum and separator of the new coal-fired power plant boiler. This material is suitable for the vapor storage of high pressure and high temperature. The high temperature creep strength of Mn-Mo alloy is higher than the carbon plate(SA516) that used in the subcritical pressure boiler. It reduces the thickness of the pressure vessel and makes the lightweight possible. Recently in the power plant boiler operation and production process, the damage has happened frequently in the heat affected zone and base material according to the hydrogen crack and delayed crack. This paper describes the research result about the damage case experienced in the boiler steam drum production process and present the optimum manufacture method for the similar damage prevention of recurrence.

Development of Fuzzy Expert System for Fault Diagnosis in a Drum-type Boiler System of Fossil Power Plant (화력 발전소 드럼형 보일러 시스템의 고장 진단을 위한 퍼지 전문가 시스템의 개발)

  • ;;Zeungnam Bien
    • Journal of the Korean Institute of Telematics and Electronics B
    • /
    • v.31B no.10
    • /
    • pp.53-66
    • /
    • 1994
  • In this paper, a fuzzy expert system is developed for fault diagnoisis of a drum-type boiler system in fossil power plants. The develped fuzzy espert system is composed of knowledge base, fuzzification module, knowledge base process module, knowledge base management module, inference module, and linguistic approximation module. The main objective of the fuzzy expert system is to check the states of the system including the drum level and detect faults such as the feedwater flow sensor fault, feedwater flow control valve fault, and water wall bube rupture. The fuzzy expert system diagnoses faults using process values, manipulated values, and knowledge base which is built via interviews and questionaries with the experts on the plant operations. Finally, the validity of the developed fuzzy expert system is shown via experiments using the digital simulator for boiler system is Seoul Power Plant Unit 4.

  • PDF

Fluid-Dynamic Study for the Chemical Cleaning of Young-Heung Thermal Power Plant Boiler Pipelines (영흥화력발전소 보일러배관 화학세정을 위한 유동검토)

  • Kim, Jin-Kwon;Kang, Shin-Hyoung
    • 유체기계공업학회:학술대회논문집
    • /
    • 2004.12a
    • /
    • pp.665-672
    • /
    • 2004
  • Chemical cleaning of boiler pipelines is necessary before the commissioning of thermal power plant after many years of construction. Fluid-Dynamic study for the chemical cleaning of boiler piplelines in Young-Heung thermal power plant is carried out. First, flow velocity necessary to sustain and exhaust solid particles in the vertical pipelines is calculated. Second, the flowrate necessary to make the calculated velocities in each vertical pipelines is calculated. Third, all the pipelines are analyzed with the Piping Systems Fluid Flow software to calculated the pressure loss in the pipelines. Finally, the operating point of the applied pump is calculated with the help of the same software.

  • PDF

Dynamic performance prediction of a Supercritical oil firing boiler - Load Runback simulation in a 650MWe thermal power plant (초임계 오일 연소 보일러의 동특성 예측 연구 - 650MWe급 화력발전소의 Load Runback 모사)

  • Yang, Jongin;Kim, Jungrae
    • 한국연소학회:학술대회논문집
    • /
    • 2014.11a
    • /
    • pp.19-20
    • /
    • 2014
  • Boiler design should be desinged to maximize thermal efficiency of the system under imposed load requirement and a boiler should be validated for transient operation. If a proper prediction is possible on the transient behavior and transient characteristics of a boiler, one may asses the performance of boiler component, control logics and operation procedures. In this work, dynamic modeling method of boiler is presented and dynamic simulation of load runback scenario was carried out on suprecritical oil-firing boiler.

  • PDF

Modeling of Boiler Steam System in a Thermal Power Plant Based on Generalized Regression Neural Network (GRNN 알고리즘을 이용한 화력발전소 보일러 증기계통의 모델링에 관한 연구)

  • Lee, Soon-Young;Lee, Jung-Hoon
    • Journal of IKEEE
    • /
    • v.26 no.3
    • /
    • pp.349-354
    • /
    • 2022
  • In thermal power plants, boiler models have been used widely in evaluating logic configurations, performing system tuning and applying control theory, etc. Furthermore, proper plant models are needed to design the accurate controllers. Sometimes, mathematical models can not exactly describe a power plant due to time varying, nonlinearity, uncertainties and complexity of the thermal power plants. In this case, a neural network can be a useful method to estimate such systems. In this paper, the models of boiler steam system in a thermal power plant are developed by using a generalized regression neural network(GRNN). The models of the superheater, reheater, attemperator and drum are designed by using GRNN and the models are trained and validate with the real data obtained in 540[MW] power plant. The validation results showed that proposed models agree with actual outputs of the drum boiler well.

Adequate Excessive Air Ratio for The Various Blended Coal at a USC Boiler (USC 보일러에서 혼합연료별 적정과잉공기비)

  • Park, Jin-Chul;Lee, Jae-Heon;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.7 no.2
    • /
    • pp.44-51
    • /
    • 2011
  • Given the fact that the entire bituminous coal used for a boiler is imported, the supply of coal is often affected by the rise of international coal price. Moreover, coal suppliers have been diversified due to the competition among power generation companies for reducing costs and inexpensive sub-bituminous coal is used. As a result, boilers combustion conditions have been deviated from the initial boiler design. This requires the selection of adequate excessive air ratio for different combustion conditions to enhance the efficiency of boiler operation. The boiler efficiency has been identified through an examination on the change of excessive air ratio by mixed fuel in unit 8 of Dangjin power plant complex. In addition, an excessive air ratio was calculated based on the examination result. According to the study result, the adequate excessive air ratio was 13% when Macquarie and Powder river were mixed at a ratio of 5:5 and when Sonoma and Megaprima persada were mixed at a ratio of 5:5. When BHP Billiton and Powder river were mixed at a ratio of 4:6 and Centennial and Batubara were mixed at a ratio of 3:7, the adequate excessive air ratio was 11%.

  • PDF

The Development of Feed-Water Flow Controller of Boiler Feed-Water Pump in 500MW Class Coal-Fired Power Plant (500MW급 석탄화력발전소 보일러 급수펌프 유량 제어기 개발)

  • Lim, Geon-Pyo;Choi, In-Kyu;Park, Doo-Yong;Jeong, Tae-Won;Kim, Gun-Jung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.9
    • /
    • pp.1663-1672
    • /
    • 2010
  • The boiler feed-water pump controllers which can be applied to 500MW class coal fired power plants was developed. The validity of the developed controllers was shown via the applied test result in a power plant. It is expected that the developed controllers are used to retrofit the existing controllers that have surpassed their expected service life and have limited spare parts, and contributes to the stable operation of plants. Based on the collected data and analysis, new control schemes were developed and implemented during the overhaul period in the new control systems. During normal operation, feed water could be supplied to the boiler with the capability of the 1600t/h flow without any problems in automatic mode of controllers. In this study, the feed-water pump controllers were developed successfully. In addition, it is expected that the developed controllers can make the plant operation more stable and can be applied to a lot of power plants.