• 제목/요약/키워드: Power Plant

검색결과 7,166건 처리시간 0.039초

원자력발전소 1차 계통 주요기기에 대한 웹기반 피로수명평가 시스템 개발 (Development of a Web-based Fatigue Life Evaluation System for Primary Components in a Nuclear Power Plant)

  • 서형원;이상민;최재붕;최성남;장기상;홍승렬;김영진
    • 대한기계학회논문집A
    • /
    • 제28권6호
    • /
    • pp.663-669
    • /
    • 2004
  • A nuclear power plant is composed of a number of primary components. Maintaining the integrity of these components is one of the most critical issues in nuclear industry. In order to maintain the integrity of these primary components, a complicated procedure is required including regular in-service inspection, failure assessment, fracture mechanics analysis, etc. Also, experts in different fields have to co-operate to resolve the integrity issues on the basis of inspection results. This integrity evaluation process usually takes long, and thus, is detrimental for the plant productivity. Therefore, an effective safety evaluation system is essential to manage the integrity issues on a nuclear power plant. In this paper, a web-based fatigue life evaluation system for primary components in nuclear power plant is proposed. This system provides engineering knowledge-based information and concurrent and collaborative working environment through internet, and thus, is expected to raise the efficiency of integrity evaluation procedures on primary components of a nuclear power plant.

원자력발전소 1 차 계통 주요기기에 대한 웹기반 피로수명평가 시스템 개발 (Development of a Web-based Fatigue Life Evaluation System for Primary Components in a Nuclear Power Plant)

  • 서형원;이상민;최재붕;김영진;최성남;장기상;홍승렬
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2003년도 춘계학술대회
    • /
    • pp.279-284
    • /
    • 2003
  • A nuclear power plant is composed of a number of primary components. Maintaining the integrity of these components is one of the most critical issues in nuclear industry. In order to maintain the integrity of these primary components, a complicated procedure is required including regular in-service inspection, failure assessment, fracture mechanics analysis, etc. Also, experts in different fields have to co-operate to resolve the integrity issues on the basis of inspection results. This integrity evaluation process usually takes long, and thus, is detrimental for the plant productivity. Therefore, an effective safety evaluation system is essential to manage the integrity issues on a nuclear power plant. In this paper, a web-based fatigue life evaluation system for primary components in nuclear power plant is proposed. This system provides engineering knowledge-based information and concurrent and collaborative working environment through internet, and thus, is expected to raise the efficiency of integrity evaluation procedures on primary components of a nuclear power plant.

  • PDF

Development of RCM Framework for Implementation on Safety Systems of Nuclear Power Plant

  • Kim, Tae-Woon;Brijendra Singh;Park, Chang K.;Chang, Tae-Whee;Song, Jin-Bae
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 1996년도 춘계학술발표회논문집(2)
    • /
    • pp.631-636
    • /
    • 1996
  • This paper presents a Reliability Centered Maintenance (RCM) framework for implementation on safety system of nuclear power plant (NPP). RCM is a systematic methodology to optimize the surveillance and maintenance tasks for critical components which provides efficiently and effectively reliability of system and safety of plant. Maintenance of the safety systems is essential for its safe and reliable operation. Reliability Centered Maintenance at NPP is the program which assure that plant system remains within original design criteria and that is not adversely affected during the plant life time. Aim of this paper is to provide the RCM framework to implement it on safety systems. RCM framework is described in four major steps.

  • PDF

추정모델에 의한 화력발전 플랜트 계측데이터의 검증 및 유효화 (Estimation Model-based Verification and Validation of Fossil Power Plant Performance Measurement Data)

  • 김성근;윤문철;최영석
    • 한국정밀공학회지
    • /
    • 제17권2호
    • /
    • pp.114-120
    • /
    • 2000
  • Fossil power plant availability is significantly affected by gradual degradations of equipment as operation of the plant continues. It is quite important to determine whether or not to replace some equipment and when to replace the equipment. Performance calculation and analysis can provide the information. Robustness in the performance calculation can be increased by using verification & validation of measured input data. We suggest new algorithm in which estimation relation for validated measurement can be obtained using correlation between measurements. Input estimation model is obtained using design data and acceptance measurement data of domestic 16 fossil power plant. The model consists of finding mostly correlated state variable in plant state and mapping relation based on the model and current state of power plant.

  • PDF

3상 전류평형 제어기술 알고리즘 개발 (A Development of 3 Phase Current Balance Control Algorithm)

  • 천영식;성형수;원학재;한정훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 B
    • /
    • pp.1091-1093
    • /
    • 2001
  • The power semiconductor is widely used in the power plant or industrial field because of genealization and enlargement. It has been controlled and operated according to its own control method. Especially in case of Power plant, it plays a major role in AVR(Automatic Voltage Regulator) or electro chlorination control circuits. Generally, they used in Analog control system at above field. But each SCR current value is different because of load unbalance or switching characteristic variations, it may cause power plant unit trip or system disorder according to SCR element burn out or bad operating condition. Therefore, in this paper a development of 3 phase current balance control algorithm is described. it gets over the past analog control system limit, controls SCR gate firing angle for 3 phase current balance.

  • PDF

SIEMENS DCS 환경에서 화력발전소 성능감시 시스템 구현 (Implementation of Performance Monitoring System for Thermal Power Plant in SIEMENS DCS)

  • 김승민;문태선;조창호
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2000년도 제15차 학술회의논문집
    • /
    • pp.37-37
    • /
    • 2000
  • This paper introduces the Performance Monitoring System(PMS) in a thermal power plant. The purpose of the PMS is to offer the operator current performance information of plant which could be an index of plant status or information to improve plant efficiency. The PMS of Bukcheju thermal power plant unit #2&3 is implemented under the SIEMENS DCS which supplies about 150 function blocks for performance calculation and all measured signals. The performance of unit, boiler, turbines, feedwater heaters, condenser, airpreheaters, feedwater pumps will be monitored and updated for every 5 minutes in PMS of Bukcheju TPP.

  • PDF

전력선 통신을 이용한 plant 감시 제어 시스템 (Spread Spectrum Method based Power Line Communication for Plant Monitoring and Control System)

  • 서민상;성석경;안병규
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 1997년도 전력전자학술대회 논문집
    • /
    • pp.211-215
    • /
    • 1997
  • Localized communication networks for office automation, security monitoring, environmental management of buildings, computer communications, and other applications enjoy every increasing demand. This paper proposes a direct sequence spread spectrum communication system for use in power line data transmission. Advantages of power distribution circuits include reasonably universal coverage and easy access vis a standard wall plug. Disadvantages include limited communication bandwidth, relatively high noise levels, and varying levels of impedance, noise, and attenuation. Spread spectrum signalling provides immunity to narrow-band signal impairments and multiplexing capability. Our prototype power line communication module supports completely physical and data link layers based on the international standard ISO 10368 for reliable high-speed power line communication system. Moreover it provides useful functions to compose a plant monitoring and control system. All the circuits of the communication module are included in one compact circuit. Thus a functional communication system for the power line plant monitoring and control is implemented.

  • PDF

최소 컷셋법에 의한 화력발전소 기동전원의 신뢰도 예측에 관한 연구 (A Study on the Reliability Evaluation of Start-up Power Supply in Fossil Power Plant by Minimal Cut-Set Method)

  • 최규식
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제48권4호
    • /
    • pp.358-364
    • /
    • 1999
  • The auxiliary transformers or start-up/stand-by transformer(s) are installed against the start-up and shut-down of generator and emergency status in fossil power plant. The on-site power supply configuration using these transformers must be determined, considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and ecfonomy of plant. The auxiliary or start-up/stand-by power supply configuration has been determined considering only safety requirements and construction cost until now in Korea. This paper presents general theorems for the reliability estimation and proposes 2-unit based 4 alternatives for the start-up power supply stystem of 500㎿ standardized fossil power plant. The reliability and unavailability of equipment, system and configuration are determined using minimal cut-set methodology. The optimized plan of 4 alternatives is determined based on this ultimate reliability and unavailability.

  • PDF

Kt Factor Analysis of Lead-Acid Battery for Nuclear Power Plant

  • Kim, Daesik;Cha, Hanju
    • Journal of international Conference on Electrical Machines and Systems
    • /
    • 제2권4호
    • /
    • pp.460-465
    • /
    • 2013
  • Electrical equipments of nuclear power plant are divided into class 1E and non-class 1E. Electrical equipment and systems that are essential to emergency reactor shutdown, containment isolation, reactor core cooling, and containment and reactor heat removal, are classified as class 1E. batteries of nuclear power plant are divided into four channels, which are physically and electrically separate and independent. The battery bank of class 1E DC power system of the nuclear power plant use lead-acid batteries in present. The lead acid battery, which has a high energy density, is the most popular form of energy storage. Kt factor of lead-acid battery is used to determine battery size and it is one of calculatiing coefficient for capacity. this paper analyzes Kt factor of lead-acid battery for the DC power system of nuclear power plant. In addition, correlation between Kt parameter and peukert's exponent of lead-acid battery for nuclear plant are discussed. The analytical results contribute to optimize of determining size Lead-acid battery bank.

원자력발전소 주제어실의 공간특성에 따른 디자인 요소에 관한 연구 (A Study on Design Elements of Main Control Room in Nuclear Power Plants by Analyzing Space Characteristics)

  • 이승훈;이태연
    • 한국실내디자인학회논문집
    • /
    • 제19권6호
    • /
    • pp.249-256
    • /
    • 2010
  • For guaranteeing for security of nuclear power plant, ergonomic factors have been applied to design of main control room, core area for management and control of nuclear power plant, but design elements for performance of operators have been ignored. As the behaviors of operators are important for security of nuclear power plant, space design which makes them pleasant psychologically and makes them maintain attention on security equipments ceaselessly is required. Therefore, the purpose of this study is to analyze space characteristics of main control rooms according to regulations of nuclear power plant and general guidelines of space design, and to offer basic data for designing of main control room which makes operators pleasant psychologically and physically. At first, theoretical issues related with design of main control room are reviewed and several premises of space are developed by abstracting design elements from common space and regulations of nuclear power plant and, then integrating each design elements interactively. In short, the improvement of system environment based on human-machine interface space has brought about perceptual, cognitive, and spatial changes and has realized next generation of main control rooms. And, differences and similarities between ordinary space and main control room, which ergonomic sizes and regulations are applied and is VDT environment based on LDP, are discussed in relation to 13 design elements and 17 space premise.