• Title/Summary/Keyword: Power Performance Evaluation

Search Result 1,686, Processing Time 0.039 seconds

Electrical Power Subsystem Performance Evaluation of the GEO Satellite (정지궤도위성 전력계 성능 평가)

  • Koo, Ja Chun;Ra, Sung Woong
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.19 no.1
    • /
    • pp.31-41
    • /
    • 2014
  • The satellite on geostationary orbit accommodates multiple payloads into a single spacecraft platform and launched in June 26, 2010. The Electrical Power Subsystem provides a fully regulated power bus at $50V_{DC}$ in sunlight and eclipse conditions. The electrical power required to the satellite is generated by a solar array wing and the energy is stored by a Li-Ion battery with a capacity of 192.5Ah. This paper selects the main design parameters, compares and analyzes with the results at ground test and in orbit operation to apply this performance evaluation of the Electrical Power Subsystem to next satellite design on geostationary orbit. The Electrical Power Subsystem is demonstrated nominal behavior without significant degradation through the performance evaluation from design to in orbit operation.

The Performance Evaluation of NSSS Control Systems for UCN 4

  • Sohn, Suk-Whun;Song, In-Ho;Sohn, Jong-Joo;Park, Jong-Ho;Seo, Jong-Tae
    • Nuclear Engineering and Technology
    • /
    • v.33 no.3
    • /
    • pp.339-348
    • /
    • 2001
  • NSSS Control Systems automatically mitigate transient conditions and leads to a stable plant condition without operator actions when a transient occurs during normal power operation. In this paper, the function and performance of NSSS control systems were examined and evaluated by comparing the predicted results with the measured data for the selected events. Loss of a Main Feedwater Pump and Load Rejection to House Load Operation events were selected for the evaluation among the transient tests peformed during the Power Ascension Test (PAT) of UCN unit 4. The overall schematic control actions of NSSS control systems can be evaluated easily through the observation of these two typical events. The selected events were analyzed by the KISPAC computer code[l] which had been used in developing the control logic and determining the control setpoints during the plant design. Additionally, the performance of FWCS during low power operation was evaluated. The result of evaluation showed that the NSSS control systems were designed properly and the performance of the NSSS control systems was excellent and also the computer code had a good prediction capability.

  • PDF

Performance Evaluation of Small-Scaled Wind Power Generator with Outer Permanent Magnet Rotor considering Electromagnetic Losses (1) - Magnetic Field Analysis and Electrical Parameters Derivation using Electromagnetic Transfer Relations Theorem - (전자기 손실을 고려한 소형 외전형 영구자석 풍력발전기의 성능 평가 (1) - 전자기 전달관계 기법을 이용한 자계특성해석 및 회로정수 도출 -)

  • Jang, Seok-Myeong;Ko, Kyoung-Jin;Choi, Jang-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.12
    • /
    • pp.2179-2189
    • /
    • 2010
  • This paper deals with analytical techniques for performance evaluation of small scaled wind power generator with outer permanent magnet rotor. In part (1), using transfer relations theorem, magnetic field distribution characteristics by PM and armature reaction field are derived. Moreover, electrical parameters such as back-EMF, inductance and resistance are calculated from the obtained field characteristic equations. The proposed analytical techniques are validated by nonlinear finite element method using commercial software 'Maxwell' and performance experiments of the manufactured generator. In part (2), generating characteristics analysis such as constant speed characteristics and constant resistive load characteristics, and performance evaluation according to variation of wind speed will be accomplished using the derived electrical parameters.

Seismic Response Amplification Factors of Nuclear Power Plants for Seismic Performance Evaluation of Structures and Equipment due to High-frequency Earthquakes (구조물 및 기기의 내진성능 평가를 위한 고주파수 지진에 의한 원자력발전소의 지진응답 증폭계수)

  • Eem, Seung-Hyun;Choi, In-Kil;Jeon, Bub-Gyu;Kwag, Shinyoung
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.24 no.3
    • /
    • pp.123-128
    • /
    • 2020
  • Analysis of the 2016 Gyeongju earthquake and the 2017 Pohang earthquake showed the characteristics of a typical high-frequency earthquake with many high-frequency components, short time strong motion duration, and large peak ground acceleration relative to the magnitude of the earthquake. Domestic nuclear power plants were designed and evaluated based on NRC's Regulatory Guide 1.60 design response spectrum, which had a great deal of energy in the low-frequency range. Therefore, nuclear power plants should carry out seismic verification and seismic performance evaluation of systems, structures, and components by reflecting the domestic characteristics of earthquakes. In this study, high-frequency amplification factors that can be used for seismic verification and seismic performance evaluation of nuclear power plant systems, structures, and equipment were analyzed. In order to analyze the high-frequency amplification factor, five sets of seismic time history were generated, which were matched with the uniform hazard response spectrum to reflect the characteristics of domestic earthquake motion. The nuclear power plant was subjected to seismic analysis for the construction of the Korean standard nuclear power plant, OPR1000, which is a reactor building, an auxiliary building assembly, a component cooling water heat exchanger building, and an essential service water building. Based on the results of the seismic analysis, a high-frequency amplification factor was derived upon the calculation of the floor response spectrum of the important locations of nuclear power plants. The high-frequency amplification factor can be effectively used for the seismic verification and seismic performance evaluation of electric equipment which are sensitive to high-frequency earthquakes.

Performance Analysis of Upgrading Process with Amine-Based CO2 Capture Pilot Plant

  • Kwak, No-Sang;Lee, Junghyun;Lee, Dong Woog;Lee, Ji Hyun;Shim, Jae-Goo
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.4 no.1
    • /
    • pp.33-38
    • /
    • 2018
  • This study applied upgrades to the processes of a 10 MW wet amine $CO_2$ capture pilot plant and conducted performance evaluation. The 10 MW $CO_2$ Capture Pilot Plant is a facility that applies 1/50 of the combustion flue gas produced from a 500 MW coal-fired power plant, and is capable of capturing up to 200 tons of $CO_2$. This study aimed to quantitatively measure efficiency improvements of post-combustion $CO_2$ capture facilities resulting from process upgrades to propose reliable data for the first time in Korea. The key components of the process upgrades involve absorber intercooling, lean/rich amine exchanger efficiency improvements, reboiler steam TVR (Thermal Vapor Recompression), and lean amine MVR (Mechanical Vapor Recompression). The components were sequentially applied to test the energy reduction effect of each component. In addition, the performance evaluation was conducted with the absorber $CO_2$ removal efficiency maintained at the performance evaluation standard value proposed by the IEA-GHG ($CO_2$ removal rate: 90%). The absorbent used in the study was the highly efficient KoSol-5 that was developed by KEPCO (Korea Electric Power Corporation). From the performance evaluation results, it was found that the steam consumption (regeneration energy) for the regeneration of the absorbent decreased by $0.38GJ/tonCO_2$ after applying the process upgrades: from $2.93GJ/ton\;CO_2$ to $2.55GJ/tonCO_2$. This study confirmed the excellent performance of the post-combustion wet $CO_2$ capture process developed by KEPCO Research Institute (KEPRI) within KEPCO, and the process upgrades validated in this study are expected to substantially reduce $CO_2$ capture costs when applied in demonstration $CO_2$ capture plants.

Performance Evaluation of Small-Scaled Wind Power Generator with Outer Permanent Magnet Rotor considering Electromagnetic Losses (2) - Electromagnetic Losses and Performance Analysis - (전자기 손실을 고려한 소형 외전형 영구자석 풍력발전기의 성능 평가 (2) - 전자기 손실 해석 및 성능 평가 -)

  • Ko, Kyoung-Jin;Jang, Seok-Myeong;Choi, Jang-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.1
    • /
    • pp.50-62
    • /
    • 2011
  • In this paper, analytical techniques for performance characteristics analysis of wind power generator with outer permanent magnet rotor are proposed. Furthermore, the proposed analytical techniques are validated by performance experiments of the manufactured generator. In this part, characteristic equations of losses such as copper loss, core loss are derived. Using the derived loss characteristic equations, electrical parameters obtained in [15] and d-q axes method, constant load and constant speed characteristics of wind power generator are analyzed. And then, to analyze performance of wind power system according to wind speed, d-q analysis model considering wind turbine characteristics is proposed. Finally, the obtained performance characteristics results are validated in comparison with those by experiments.

Consideration for Heat Exchanger Performance Evaluation with reduced spend fuel pool heat due to the long-term over-haul maintenance (장기 예방정비로 인한 사용후연료저장조 열원 감소가 열교환기 성능평가에 미치는 영향 고찰)

  • Park, Chan;Lee, Sung Ho
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.16 no.1
    • /
    • pp.56-64
    • /
    • 2020
  • The safety related heat exchangers have been evaluated for their performance during the operation of the nuclear power plant. The evaluation program for the safety related heat exchanger was developed in 2010 and used by KHNP based on EPRI TR-10739 algorithms. The spend fuel pool heat exchanger is one of the safety related heat exchanger in the nuclear power plant and also evaluated for their performance. Recently the performance evaluation for the spend fuel pool heat exchanger was not available because of the decreased heat in the spend fuel pool due to the long term overhaul. This paper analyzes the main cause of evaluation failure in the evaluation process and suggests the criteria for the heat exchanger performance evaluation during the long term overhaul.

Preformance evaluation for optimal power assignment and frequency plan of carrier groups (위성중계기 입력방송파군의 최적전력할당 및 주파수 배치에 따른 성능평가)

  • 김병균;최형진
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.21 no.12
    • /
    • pp.3183-3195
    • /
    • 1996
  • As a method for effective utilization of the limited power and frequency resources in satellite communications, this paper develops software which can assigns the optimal power of input carrier groups inthe multi-level SCPC systems and performs evaluation to a various satellite link environment. Using the developed software, the paper presents performance according to the frequency plan of carrier groups and suggest a frequency play method for performance improvement of satellite link. A various interference and noise caused by satellite link are analyzed for reliable performance evaluation. The performance criteria for evaluation is classified into 2 categories according to the CNR of destination receiver earth station.

  • PDF

The Optimization Study on the Test Method of Remanufactured Power Steering Oil Pump by Using FMEA (FMEA를 활용한 재제조 파워스티어링 오일펌프 시험법에 대한 최적화 연구)

  • Seo, Youngkyo;Jung, Dohyun;Yu, Sangseok;Rha, Wanyong
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.24 no.1
    • /
    • pp.90-98
    • /
    • 2016
  • Currently government certified test method for an automobile remanufactured products is insufficient. Thus many automotive parts in the remanufacturing market are lacking proper evaluation criteria and production of defective products are causing customer dissatisfaction. In this paper a power steering oil pump, which requires stringent manufacturing standards, is studied by the failure mode and effect analysis approach. The research suggested that the test criteria such as discharge flow characteristic test, tightness test, pulley run-out test, pressure switch operation test, low temperature test and rotation pressure durability test should be performed to evaluate the reliability of remanufactured power steering oil pumps. As a result of tests, the performance of remanufactured power steering oil pump satisfied the evaluation criteria of pressure switch operation test and low temperature test. However, the remanufactured power steering oil pump failed to satisfy the evaluation criteria on discharge performance test, tightness test and pulley run-out test. These performance evaluation tests proved the necessity of standard process for the remanufactured power steering oil pump.

Evaluation for the Cooling Capability of Secondary Cooling Tower in HANARO (하나로 2차 냉각탑의 냉각능력 평가)

  • Park, Yong-Chul;Wu, Jong-Sup;Cho, Yeong-Gurb;Ryu, Jeong-Soo
    • 유체기계공업학회:학술대회논문집
    • /
    • 2000.12a
    • /
    • pp.345-350
    • /
    • 2000
  • The heat produced by the fission in the fuel of HANARO, 30 MW research reactor, is transferred from the primary cooling water to the secondary cooling water through heat exchangers, and the heat absorbed by the secondary cooling water is released into the atmosphere by the 33 MW cooling tower which is a mechanical induced draft and counter flow type. If the outlet temperature of cooling tower exceeds 33 of due to the loss of the cooling tower performance under reactor operation above $50\%$ of the full power, the reactor power should be reduced to half of the full power for safe operation. Therefore, the cooling capability of cooling tower should be maintained for the reactor to be normally operated. To predict the capability of cooling tower for full power reactor operation of 30 MW, the performance test of cooling tower was done at the reactor present power of 24 MW and the capability was respectively evaluated by characteristics and performance curves methods in accordance with the Code of Cooling Tower Institute of U.S.A. to confirm the reliability of evaluation. As a result, it was confirmed, through the results of each evaluation, that the cooling capability of cooling tower meets the design required heat load. Also, the equations of the performance and the characteristics curves of the cooling tower, based on the collected data during this performance test, was obtained for developing the calculation program to predict the cooling capability during reactor operation.

  • PDF