An internet-based, real-time GPS synchronized wide-area power system frequency monitoring network(FNET) has been monitoring wide-area power system frequency in continuous time in the United States. This paper analyzes the FNET measurement to the verified disturbances in the US eastern interconnected power system and simulates it using the dynamic system model. By comparing the frequency measurements with its simulation results to the same disturbances in detail, this paper finds that the sequence of monitoring points to detect the frequency fluctuation caused by the disturbances is matched well in the measured data and the simulation results. The similarity comparison index is also proposed to quantify the similarity of the compared cases. The dynamic model based simulation result is expected to compensate for the lack of FNET measurement in its applications.
Localized communication networks for office automation, security monitoring, environmental management of buildings, computer communications, and other applications enjoy every increasing demand. This paper proposes a direct sequence spread spectrum communication system for use in power line data transmission. Advantages of power distribution circuits include reasonably universal coverage and easy access vis a standard wall plug. Disadvantages include limited communication bandwidth, relatively high noise levels, and varying levels of impedance, noise, and attenuation. Spread spectrum signalling provides immunity to narrow-band signal impairments and multiplexing capability. Our prototype power line communication module supports completely physical and data link layers based on the international standard ISO 10368 for reliable high-speed power line communication system. Moreover it provides useful functions to compose a plant monitoring and control system. All the circuits of the communication module are included in one compact circuit. Thus a functional communication system for the power line plant monitoring and control is implemented.
Rack-level DC power supply is the optimal technology for providing DC power to a volume server without any power infrastructure changes in an existing AC data center. In this paper, we propose a smartly controllable and monitorable DC rack power system. The proposed system improves power efficiency by changing the power distribution architecture of a conventional method in the rack. We developed an optimal power control method in multipower modules to provide high efficiency at low loads. In addition, the proposed system provides real-time web monitoring of the rack power and environment around a rack. In our experiments, the proposed system improved the power efficiency by over 10% compared to an AC power system providing N+1 redundant power and power monitoring.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.57
no.1
/
pp.30-35
/
2008
In this paper, the application of power Quality monitoring based on Sampled Value(SV) which is introduced in the IEC61850 International Standard for substation communication are discussed. Firstly, while Merging Unit(MU) is designed as a process level device transmitting sensor data, the practical problems such as time delay compensation and optical fiber communication are encountered. Secondly, the Sampled Value message which is proper to a power quality monitoring system is presented. Because the power quality monitoring system requests less time-critical service compared to protection and control applications, the Sampled Value service message structure is introduced to improve efficiency. Lastly, the power quality monitoring server having various power quality analysis functions is suggested to verify the performance of Merging Unit With the diverse experiments, it is proved that the process bus distributed solution is flexible and economic for the power quality monitoring.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.56
no.1
/
pp.13-18
/
2007
In this paper, authors deal with an application of power quality monitoring using the Sampled Value which is described in the IEC61850 International Standard for substation communication. Firstly, while Merging Unit is designed as a process level device transmitting sensor data, the practical problems such as time delay compensation and optical fiber communication are issued. Secondly, the Sampled Value message which is proper to a power quality monitoring system is presented. Because the power quality monitoring system requests non time critical service comparing to protection and control applications, the Sampled Value service message structure is introduced to improve efficiency. At last, the power quality monitoring server having various power quality analysis functions is suggested to verify the performance of Merging Unit. With the diverse experiments, it is proved that the process bus distributed solution is flexible and economic for the power quality monitoring.
KIEE International Transactions on Power Engineering
/
v.4A
no.4
/
pp.214-220
/
2004
Power quality monitoring is the cornerstone for power quality analysis, diagnosis and improvement. The measurement of power quality (PQ) evolves from instantaneous metering to continuous monitoring. Furthermore, recent technologies enable us to construct more flexible, reliable, rapid and economical power quality monitoring system (PQMS). Therefore, this paper presents an improved PQMS with a new distributed monitoring structure. The proposed PQMS consists of a PQ meter, PQ analyzer and GUI. The PQ meter only collects raw data and the PQ analyzer performs power quality analysis. It has several advantages compared to conventional structures in economic efficiency, modularity, speed, etc. PQ monitoring algorithms to catch steady-state trends and to detect PQ events are also adapted to the proposed structure. Using the proposed structure and monitoring algorithm, a prototype PQMS is constructed and real-time testing is performed.
Journal of the Korea Institute of Information and Communication Engineering
/
v.11
no.3
/
pp.532-539
/
2007
Photovoltaic power generation system is one of new renewable energy sources. Such distributed power generation system has important issues for the system management ad operating after its installation. To solve the problem, remote monitoring and control systems can be employed. In this paper, LabVBEW based monitoring and control system is proposed for efficient management and operation of the photovoltaic power generation system. Interface method between monitoring part and DSP controller is given in detail. The proposed system is verified through experiments using a grid-connected photovoltaic power generation system.
Since the Internet-based real-time Global Positioning System(GPS) synchronized widearea power system frequency monitoring network (FNET) was proposed in 2001, it has been monitoring the power system frequency in interconnected United States power systems and numerous interesting behaviors have been observed, including frequency excursion propagation. We address the consistency of a frequency excursion detection order of frequency disturbance recorders in FNET in relation to the same generation trip, as well as the ability to recreate by power systems dynamic simulation. We also propose a new method, as an application of FNET measurement, to locate a tripped generator using power systems dynamic simulation and wide-area frequency measurement. The simulation database of all the possible trips of generators in the interconnected power systems is created using the off-line power systems dynamic simulation. When FNET detects a sudden drop in the monitoring frequency, which is most likely due to a generation trip in power systems, the proposed algorithm locates a tripped generator by finding the best matching case of the measured frequency excursion in the simulation database in terms of the frequency drop detection order and the time of monitoring points.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.64
no.2
/
pp.50-56
/
2015
This paper presents a smart monitoring technique for photovoltaic power systems by using wire and wireless communication networks in which the RS-232/484 and the Zigbee communication networks are inherently established respectively. In the proposed monitoring systems, environmental data sequences and the output power measured by sensors in photovoltaic systems are transferred to PC systems via two communication networks. We made electronic hardware boards for sensors and communication networks to construct its real-time monitoring system and carry out experiments for demonstrating reliability of the proposed monitoring system.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.58
no.3
/
pp.276-284
/
2009
In this paper, we develop the image transfer remote maintenance monitoring system for hand held device which can compensate defects of human mistake. The human mistakes always happen when the worker communicate information each other to check and maintenance the equipment of the power plant under bad circumstance such as small place and long distance in power plant. A worker couldn't converse with other when in noisy place like Power plant. So, we make some hand device for handy size and able to converse in noisy place. The developed system can have improvement of productivity through increasing plant operation time. And developed system is composed of advanced H/W(hard ware) system and S/W(soft ware)system. The H/W system consist of media server unit, communication equipment with hand held device, portable camera, mike and head set. The advanced s/w system consist of data base system, client pc(personal computer) real time monitoring system which has server GUI(graphic user interface) program, wireless monitoring program and wire ethernet communication program. The client GUI program is composed of total solution program as pc camera program, and phonetic conversation program etc.. We analyzed the required items and investigated applicable part in the image transfer remote maintenance monitoring system with hand held device. Also we investigated linkage of communication protocol for developed prototype, developed software tool of two-way communication and realtime recording skill of voice with image. We confirmed the efficiency by the field test in preventive maintenance of plant power.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.