• Title/Summary/Keyword: Power Measurement

Search Result 4,630, Processing Time 0.027 seconds

Calibration of digital wide-range neutron power measurement channel for open-pool type research reactor

  • Joo, Sungmoon;Lee, Jong Bok;Seo, Sang Mun
    • Nuclear Engineering and Technology
    • /
    • v.50 no.1
    • /
    • pp.203-210
    • /
    • 2018
  • As the modernization of the nuclear instrumentation system progresses, research reactors have adopted digital wide-range neutron power measurement (DWRNPM) systems. These systems typically monitor the neutron flux across a range of over 10 decades. Because neutron detectors only measure the local neutron flux at their position, the local neutron flux must be converted to total reactor power through calibration, which involves mapping the local neutron flux level to a reference reactor power. Conventionally, the neutron power range is divided into smaller subranges because the neutron detector signal characteristics and the reference reactor power estimation methods are different for each subrange. Therefore, many factors should be considered when preparing the calibration procedure for DWRNPM channels. The main purpose of this work is to serve as a reference for performing the calibration of DWRNPM systems in research reactors. This work provides a comprehensive overview of the calibration of DWRNPM channels by describing the configuration of the DWRNPM system and by summarizing the theories of operation and the reference power estimation methods with their associated calibration procedure. The calibration procedure was actually performed during the commissioning of an open-pool type research reactor, and the results and experience are documented herein.

Measurement of Indoor Power Line Channel Characteristics Considering Capacitive Loads (용량성 부하를 고려한 옥내 전력선 채널 특성 측정)

  • Heo Yoon-Seok;Hong Bong-Hwa;Kim Chul;Jun Kye-Suk;Lee Dae-Young
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.42 no.6 s.336
    • /
    • pp.53-60
    • /
    • 2005
  • Considerable efforts has been recently devoted to the determination of accurate channel models for the power line environment, both for the indoor and outdoor cases. The common limitation of the known and previously published models is the particular type of approach followed. This paper is concerned with a power line channel characteristic measurement for the more fast and efficiently power line communication experiment. The need arises from the fact that indoor power cables consist of conductors and inductors. A capacitive load simulator is a essential equipment in the power line modem development for indoor power line network. We accomplished a channel data base by the frequency response method about the total 224 capacitor load cases. On the basis of this measurement modeling it is here revealed that the power line communication channel is a more deterministic media.

A Study on Measurement Accuracy and Required Time based on SCPI of Power Meter in Ka Band (Ka 밴드에서 Power Meter 계측 명령어에 따른 측정 정확도와 소요시간에 대한 연구)

  • Cho, Tae-Chong;Shin, Suk-Ho
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.20 no.5
    • /
    • pp.51-56
    • /
    • 2020
  • Measurement accuracy and required time is important to make ATE(Automatic test equipment) system in Ka band, and SCPI commands of power meter which is a representative RF test equipment are studied in this paper. Comparison data between FETCH and MEASURE which are SCPI commands are measured in 30 G ~ 31 GHz and -70 ~ +20 dBm using two power sensor. The data show that FETCH which is the fastest SCPI is able to get reliable data in linear interval above noise level. MEASURE which is the best accurate command takes longer time than FETCH, and the longest time is 13.2 seconds. These results offer that measurement accuracy and required time of the two SCPI for power meter and would be used as a guideline for efficient ATE system in Ka band.

Development of Operational Technology and Integrated Measurement Information Management System for the Radioactivity Measurement Device (방사능 측정장치 운영 기술 및 측정정보 통합관리 시스템 개발)

  • Dong-Sik Jin;Kyeong-Ryeong Kim;Jae-Geun Lee
    • Journal of radiological science and technology
    • /
    • v.47 no.3
    • /
    • pp.183-195
    • /
    • 2024
  • Additional functional upgrades to the large-area compton camera (LACC) measurement device that can provide characteristics evaluation information (nuclear species and radioactivity) and two-dimensional or three-dimensional distribution imaging information of radioactive materials existing in surface or internal of concrete structures are required in terms of work stability and efficiency in order to apply to actual decommissioning sites such as nuclear power plants or medical cyclotron facilities by using this measurement device. To this purpose, the technology that allows radiation workers to intuitively and visually check the distribution of radioactive materials in advance by matching the two-dimensional distribution imaging information of radioactive materials obtained through the LACC measurement device and visual imaging of the measurement zone (10 m × 5 m) was developed. In addition, the separate system that can automatically adjust the position (height) in units of the measurement area size (0.7 m × 0.3 m × 0.8 m) of the LACC measurement device was developed and the integrated management system for characteristics evaluation information and two-dimensional or three-dimensional distribution imaging information obtained per unit of measurement for radioactive materials was developed. These functional upgrades related to LACC measurement device can improve work efficiency and safety when measuring radioactivity of concrete structures and enable the establishment of appropriate decommissioning strategies using radioactivity measurement information for decommissioning nuclear power plants or medical cyclotron facilities.

Comparison of Global Field Power Measurement and Conventional Method in Multi-channel Auditory Event Related Potential P300 Determination (다채널 청각 사건관련전위 P300 결정에서 전부위장력측정법과 전통적방법의 비교)

  • Jeon, Yang-Whan;Han, Sang-Ick
    • Korean Journal of Biological Psychiatry
    • /
    • v.7 no.2
    • /
    • pp.180-185
    • /
    • 2000
  • Objective : The present study was designed to compare Global Field Power Measurement and conventional method in P300 determination. Method : The subjects were composed of patients(N=20) with schizophrenia by DSM-IV and normal controls(N=20). The auditory event related potential P300 was measured by "oddball paradigm". P300 components were determined by Global Field Power Measurement and conventional method at 5 electrodes(Fz, Cz, Pz, $T_3$, $T_4$). Results : P300 amplitudes of patients were smaller than those of controls across all electrodes and in both methods, but there was no differential power in P300 determination between two methods. Asymmetry of auditory event-related potential P300 was not shown between patients with schizophrenia and normal controls. Conclusion : It is implicated that it depends on clinical situations and research purposes what method of P300 determination will be more appropriate for patients with schizophernia.

  • PDF

Research for Implementation of Real-time Power Measurement and Storage System (소규모 전력시스템를 위한 실시간 전원 계측 및 저장 시스템 구현에 관한 연구)

  • Seo, Jong-Wan;Suh, Hee-Seok;Shin, Myong-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.21 no.7
    • /
    • pp.29-36
    • /
    • 2007
  • According to the using of electric power source such as solar cell, fuel cell and wind energy, consumer is supplied from distributed generator and electric power company. Therefore, it is required that the real-time measurement and control instrument for those distributed generator. In this paper, describes the development of measuring equipment for the power system with distributed generator. The equipment has real-time measure function and communication with PC via USB port, which is used for various purposes such as investigation of transient state, and is compared with measurement instrument to verify the reliability.

Centralized Adaptive Under Frequency Load Shedding Schemes for Smart Grid Using Synchronous Phase Measurement Unit

  • Yang, D.Y.;Cai, G.W.;Jiang, Y.T.;Liu, C.
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.3
    • /
    • pp.446-452
    • /
    • 2013
  • Under frequency load shedding (UFLS) is an effective way to prevent system blackout after a serious disturbance occurs in a power system. A novel centralized adaptive under frequency load shedding (AUFLS) scheme using the synchronous phase measurement unit (PMU) is proposed in this paper. Two main stages are consisted of in the developed technique. In the first stage, the active power deficit is estimated by using the simplest expression of the generator swing equation and static load model since the frequency, voltages and their rate of change can be obtained by means of measurements in real-time from various devices such as phase measurement units. In the second stage, the UFLS schemes are adapted to the estimated magnitude based on the presented model. The effectiveness of the proposed AUFLS scheme is investigated simulating different disturbance in IEEE 10-generator 39-bus New England test system.

A Basic Study of Displacement Measurement of Magnetic Bearing System Using Hall Effect Sensor (자기베어링 시스템에서의 변위측정을 위한 홀 효과 센서의 기초 연구)

  • Yang, J.H.;Jeong, G.G.;Jeong, H.H.;Son, S.K.
    • Journal of Power System Engineering
    • /
    • v.11 no.2
    • /
    • pp.72-76
    • /
    • 2007
  • Since the magnetic bearing system has unstability inherently it is necessary to measure the displacement for stable operation. Normally the displacement measurement is implemented by using sensors. The sensor for the displacement measurement is selected by precision, installation space, effect of magnetic field and response speed. And the cost of displacement measurement sensor also is considered. At the cost the hall effect sensor has a large advantage comparing with the others. Therefore this study concern about the basis experimental test for the displacement measurement of the magnetic bearing system that uses the hall effect sensor coupled with a tiny permanent magnet. The experimental results confirm the validity and practicability for this displacement measurement sensor.

  • PDF

Selection Criteria of Measurement Locations for Advanced Power Reactor 1400 Reactor Vessel Internals Comprehensive Vibration Assessment Program (APR1400 원자로내부구조물 종합진동평가 측정위치 선정 기준)

  • Ko, Do-Young;Kim, Kyu-Hyung;Kim, Sung-Hwan
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.21 no.8
    • /
    • pp.708-713
    • /
    • 2011
  • U.S. nuclear regulatory commission(NRC) regulatory guide(RG) 1.20 requires a comprehensive vibration assessment program(CVAP) for use in verifying the structural integrity of reactor vessel internals(RVI) for flow-induced vibrations prior to commercial operation. The CVAP program consist of vibration and fatigue analysis, a vibration measurement program, an inspection program, and a correlation of their results. One of the main purposes of the analysis program is to select measurement locations, however measurement locations can not be determined by only analysis results, therefore we developed selection criteria of measurement locations for advanced power reactor 1400(APR1400) RVI CVAP, It will be used to select measurement locations and instrument types for APR1400 RVI CVAP.

An Implementation of Real-time Measurement and Assessment System for Power Quality Characteristics of Grid Connected Wind Turbines (계통연계 풍력발전기의 전력품질 평가를 위한 IEC 61400-21 표준 실시간 계측 장치 구현)

  • Lee, Jong-Joo;Kim, Dong-Joon;Moon, Young-Hwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.9
    • /
    • pp.1560-1565
    • /
    • 2010
  • The renewable resource are getting more attentions with increased concerns on the depletion of fossil fuels and several environmental issues like emission problem. Wind power is a representative option among several renewable sources and the generation capacity using wind power is being increased. However, the wind generation is so volatile on its output characteristic, so it is required to assess the grid impact of wind power generation by measuring the fluctuation effect more precisely. This paper proposes the method for measuring the generation output according to IEC 61400-21(Measurement and assessment of power quality characteristics of grid connected wind turbines) to assess the power quality of wind turbine generation. In addition, it shows an application case to a small-scale wind power generator. In the case study, it suggests a structure design of the proposed measurement instrument both on hardware and software aspects, which is composed of a remote monitoring & data analysis program and an FPGA based real-time signal processing device.