• Title/Summary/Keyword: Power Margin

Search Result 585, Processing Time 0.033 seconds

Optimal Power Flow based on Priority of Generation Rescheduling (발전력재배분의 priority를 이용한 최적전력조류)

  • Kim, Kyu-Ho;Kim, Soo-Nam;Rhee, Sang-Bong;Lee, Sang-Keun;Song, Kyung-Bin
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.412-413
    • /
    • 2011
  • This paper presents a new generation rescheduling approach for preventive control of power systems, which can optimally reallocate power generations for unstable contingencies. The transient stability constraints used in the optimal rescheduling model are described by energy margin sensitivity. Especially the energy margin sensitivity is evaluated for change with respect to generation. For a given contingency, the energy margin is computed and the respective sensitivities are also computed.

  • PDF

Study on Optimal Power Flow Considering Voltage Stability Margin (전압안정도 여유를 고려한 최적조류계산에 관한 연구)

  • Kim, S.;Jeong, M.H.;Lee, B.;Song, K.Y.;NamGoong, J.;Choi, H.;Moon, Y.H.
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.3-6
    • /
    • 2000
  • In this paper the concept of voltage stability operating limit in optimal power flow problem is described. A methodology of optimal power flow considering voltage stability margin is proposed based on auxiliary constraint to get a secure dispatch solution. The look-ahead margin is used to shift dispatch solutions to the secure direction in proposed framework. The a1gorithm proposed is successfully tested on IEEE 30-bus system.

  • PDF

A Study of the Gain Margin in Accordance with the PSS Inputs (PSS 입력신호에 따른 이득여유 연구)

  • Kim, Dong-Joon;Moon, Young-Hwan;Kim, Tae-Kyun;Shin, Jeong-Hoon;Kim, Yong-Hak
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1060-1062
    • /
    • 1999
  • This paper proposes a guideline of choosing the optimum stabilizer input considering the gain margin of power system stabilizer between the optimum stabilizer gain and the allowable maximum stabilizer gain in accordance with the five inputs, such as generator shaft speed, bus frequency, electrical power, accelerating power and bus terminal voltage. The local mode damping and exciter mode damping are considered with increasing the stabilizer gain to determine each gain margin of the inputs.

  • PDF

Structural Integrity and Safety Margin Evaluation for Thinned Pipe Component (감육배관의 구조건전성 및 안전여유도 평가 기술)

  • Lee, Sung-Ho;Kim, Tae-Ryong;Kim, Bum-Nyun
    • Proceedings of the KSME Conference
    • /
    • 2004.04a
    • /
    • pp.264-267
    • /
    • 2004
  • Wall thinning of carbon steel pipe components due to Flow-Accelerated Corrosion (FAC) is one of the most serious threats to the integrity of steam cycle piping systems in Nuclear Power Plants (NPP). Since the mid-1990s, secondary side piping systems in Korean NPPs have experienced wall thinning, leakages and ruptures caused by FAC. Korea Electric power Research Institute (KEPRI) and Korea Hydro & Nuclear Power Co., LTD. (KHNP) have conducted a study to develop the methodology for systematic pipe management and established the Korean Thinned Pipe Management Program (TPMP). To effectively maintain the integrity of piping system, FAC engineer should understand the criterions of the structural integrity evaluation and the safety margin assessment for the thinned pipe component. This paper describes the technical items of TPMP, and shows the example of the integrity evaluation and safety margin assessment for three thinned pipe component of a NPP.

  • PDF

A Study of TRM and ATC Determination for Electricity Market Restructuring (전력산업 구조개편에 대비한 적정 TRM 및 ATC 결정에 관한 연구)

  • 이효상;최진규;신동준;김진오
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.3
    • /
    • pp.129-134
    • /
    • 2004
  • The Available Transfer Capability (ATC) is defined as the measure of the transfer capability remaining in the physical transmission network for further commercial activity above already committed uses. The ATC determination s related with Total Transfer Capability (TTC) and two reliability margins-Transmission Reliability Capability (TRM) and Capacity Benefit Margin(CBM) The TRM is the component of ATC that accounts for uncertainties and safety margins. Also the TRM is the amount of transmission capability necessary to ensure that the interconnected network is secure under a reasonable range of uncertainties in system conditions. The CBM is the translation of generator capacity reserve margin determined by the Load Serving Entities. This paper describes a method for determining the TTC and TRM to calculate the ATC in the Bulk power system (HL II). TTC and TRM are calculated using Power Transfer Distribution Factor (PTDF). PTDF is implemented to find generation quantifies without violating system security and to identify the most limiting facilities in determining the network’s TTC. Reactive power is also considered to more accurate TTC calculation. TRM is calculated by alternative cases. CBM is calculated by LOLE. This paper compares ATC and TRM using suggested PTDF with using CPF. The method is illustrated using the IEEE 24 bus RTS (MRTS) in case study.

Research on Voltage Stability Boundary under Different Reactive Power Control Mode of DFIG Wind Power Plant

  • Ma, Rui;Qin, Zeyu;Yang, Wencan;Li, Mo
    • Journal of Electrical Engineering and Technology
    • /
    • v.11 no.6
    • /
    • pp.1571-1581
    • /
    • 2016
  • A novel method is proposed to construct the voltage stability boundary of power system considering different Reactive Power Control Mode (RPCM) of Doubly-Fed Induction Generator (DFIG) Wind Power Plant (WPP). It can be used for reflecting the static stability status of grid operation with wind power penetration. The analytical derivation work of boundary search method can expound the mechanism and parameters relationship of different WPP RPCMs. In order to improve the load margin and find a practical method to assess the voltage security of power system, the approximate method of constructing voltage stability boundary and the critical points search algorithms under different RPCMs of DFIG WPP are explored, which can provide direct and effective reference data for operators.

A Study on the Method of the Vulnerable Area Investigation In Severe Contingencies Using Branch Parameter Continuation Power Flow (BCPF)

  • Seo Sangsoo;Lee Byongjun;Kim Tae-Kyun;Song Hwachang
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.4
    • /
    • pp.390-395
    • /
    • 2005
  • The most widely used index for the vulnerable area investigation has been the reactive power margin or sensitivity analysis. But we can only obtain the results of these analyses if the results of load flow are convergent in severe contingencies. Otherwise these methods are not adoptable. This paper presents a good index for overcoming severe contingencies, though the power flow equation is unsolvable using the branch parameter continuation power flow. In simulation, the Korea Electric Power Corporation (KEPCO) Systems are applied.

Concept Development of a Simplified FPGA based CPCS for Optimizing the Operating Margin for I-SMRs

  • Randiki, Francis;Jung, Jae Cheon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.17 no.2
    • /
    • pp.49-60
    • /
    • 2021
  • The Core Protection Calculator System (CPCS) is vital for plant safety as it ensures the required Specified Acceptance Fuel Design Limit (SAFDL) are not exceeded. The CPCS generates trip signals when Departure from Nucleate Boiling Ratio (DNBR) and Local Power Density (LPD) exceeds their predetermined setpoints. These setpoints are established based on the operating margin from the analysis that produces the SAFDL values. The goal of this research is to create a simplified CPCS that optimizes operating margin for I-SMRs. Because the I-SMR is compact in design, instrumentation placement is a challenge, as it is with Ex-core detectors and RCP instrumentation. The proposed CPCS addresses the issue of power flux measurement with In-Core Instrumentation (ICI), while flow measurement is handled with differential pressure transmitters between Steam Generators (SG). Simplification of CPCS is based on a Look-Up-Table (LUT) for determining the CEA groups' position. However, simplification brings approximations that result in a loss of operational margin, which necessitates compensation. Appropriate compensation is performed based on the result of analysis. FPGAs (Field Programmable Gate Arrays) are presented as a way to compensate for the inadequacies of current systems by providing faster execution speeds and a lower Common Cause Failure rate (CCF).

SENSITIVITY ANALYSES OF THE USE OF DIFFERENT NEUTRON ABSORBERS ON THE MAIN SAFETY CORE PARAMETERS IN MTR TYPE RESEARCH REACTOR

  • Kamyab, Raheleh
    • Nuclear Engineering and Technology
    • /
    • v.46 no.4
    • /
    • pp.513-520
    • /
    • 2014
  • In this paper, three types of operational and industrial absorbers used at research reactors, including Ag-In-Cd alloy, $B_4C$, and Hf are selected for sensitivity analyses. Their integral effects on the main neutronic core parameters important to safety issues are investigated. These parameters are core excess reactivity, shutdown margin, total reactivity worth of control rods, thermal neutron flux, power density distribution, and Power Peaking Factor (PPF). The IAEA 10 MW benchmark core is selected as the case study to verify calculations. A two-dimensional, three-group diffusion model is selected for core calculations. The well-known WIMS-D4 and CITATION reactor codes are used to carry out these calculations. It is found that the largest shutdown margin is gained using the $B_4C$; also the lowest PPF is gained using the Ag-In-Cd alloy. The maximum point power densities belong to the inside fuel regions surrounding the central flux trap (irradiation position), surrounded by control fuel elements, and the peripheral fuel elements beside the graphite reflectors. The greatest and least fluctuation of the point power densities are gained by using $B_4C$ and Ag-In-Cd alloy, respectively.

A Study on the Causality between Electric Reserve Margin, Electricity Tariff, Renewable Energy, Economic Growth, and Concurrent Peak in Winter and Summer: OECD Panel Analysis (전력예비율과 전기요금, 신재생, 경제성장, 동·하계 동시피크 간 인과관계 연구 : OECD 패널 분석)

  • Lee, Jung-Ho;Park, Kyung-Min;Park, Jung-Gu
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.11
    • /
    • pp.1415-1422
    • /
    • 2018
  • In Korea, prior to 2011, the electric reserve margin followed the probabilistic reliability view and the planning reserve margin had been operated at about 15% based on the assumption that power outage was permitted within 0.5 days a year. However, after experiencing the shortage of the electric generation capacity in Sept. 15, 2011, the planning reserve margin was selected as 22% to improve the reliability of the electric supply. In this paper, using panel data of 28 OECD countries over the period 2000-2014 we attempted to empirically examine the linkage between reserve margin, electricity tariffs, renewable energy share, GDP per capita, and summer / winter peak-to-peak ratios. As a result, all four independent variables have been significant for the electric reserve margin, and in particular, we found that countries with similar peaks in winter and summer have operated 4.3% higher reserve margin than countries experiencing only summer peak.