• Title/Summary/Keyword: Power Line

Search Result 6,057, Processing Time 0.049 seconds

Windows Based Programming for Optimal Power Flow Analysis (윈도우환경을 기반으로 한 최적전력조류 프로그램 팩키지 개발)

  • Kim, Kyu-Ho;Rhee, Sang-Bong;Lee, Jae-Gyu;You, Seok-Ku
    • Proceedings of the KIEE Conference
    • /
    • 2001.11b
    • /
    • pp.239-242
    • /
    • 2001
  • This paper presents a windows program package for solving security constrained OPF in interconnected power systems, which is based on the combined application of evolutionary programming(EP) and sequential quadratic programming(SQP). The objective functions are the minimization of generation fuel costs and system power losses. The control variables are the active power of the generating units, the voltage magnitude of the generator, transformer tap settings and SVC setting. The state variables are the bus voltage magnitude, the reactive power of the generating unit, line flows and the tie line flow. In OPF considering security, the outages are selected by contingency ranking method. The resulting optimal operating point has to be feasible after outages such as any single line outage(respect of voltage magnitude, reactive power generation and power flow limits). The OPF package proposed is applied to 10 machines 39 buses model system.

  • PDF

An analysis according to the caange in power SCADA systems from the viewpoint of the operator (운영자입장에서 본 전력 SCADA시스템 변화에 따른 분석)

  • Oh, Sung-Hyo;Choi, Sang-Chun;Choi, Si-Haeng
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.407-416
    • /
    • 2008
  • The OCC of Seoul Metro whose operation began in 1974 is in charge of conveying 4,000,000 passengers across 117 subway stations in travel zones of 134.9Km in length. It continues to strive to ensure passenger safety by applying state-of-the-art-technology to each control system without delay. The power control center especially designed to provide power system operations for all stations of Seoul Metro(Line 1 to 4) and the rolling stocks implements preventive safety systems with the real time power system operational information on changes in conditions from the field through the power SCADA system(41 substations, 117 stations, 137 terminal units). This paper reports the differences of each line's power SCADA system(power SCADA systems of Seoul Metro(Line 1 to 4)), the roles and functions of the system, and the system operating characteristics and limits from the standpoint of the operator.

  • PDF

A Low Power SDRAM Output Buffer with Minimized Power Line Noise and Feedthrough Current (최소화된 Power line noise와 Feedthrough current를 갖는 저 전력 SDRAM Output Buffer)

  • Ryu, Jae-Hui
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.39 no.8
    • /
    • pp.42-45
    • /
    • 2002
  • A low power SDRAM output buffer with reduced power line noise and feedthrough current is presented. In multi I/O SDRAM output buffer, feedthrough current as well as the corresponding power dissipation are reduced utilizing proposed undershoot protection circuits. Ground bounce is minimized by the pull down driver using intelligent feedback scheme. Ground bounce noise is reduced by 66.3% and instantaneous and average power are reduced by 27.5% and 11.4%, respectively.

The Enhancement of Power System Security Using flexible AC Transmission Systems (FACTS) (FACTS 기기를 이용한 전력시스템의 안전도 향상)

  • 송성환;임정욱;문승일
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.52 no.3
    • /
    • pp.165-172
    • /
    • 2003
  • This paper presents an operation scheme to enhance the power system security by applying FACTS on Power systems. Three main generic types of FACTS devices are suggested an illustrated. Flow congestions over lines have been solved by controlling active power of series-compensated FACTS devices and low voltages at buses have been solved by controlling reactive power of shunt-compensated FACTS devices. Especially, Especially, UPFC has been applied in both line congestion and low voltages. Two kinds of indices which indicate the power system security level related to line flow and bus voltage are utilized in this paper. They have been minimized to enhance the power system security level through the iterative method and the sensitivity vector of security index is derived to determine the direction to minimum. The proposed algorithm has been tested on the IEEE 57-bus system with FACTS devices in a normal condition and a line-faulted contingency.

Islanding Detection Based on Complex Power at the Intertie (연계점에서의 복소전력을 이용한 단독운전 판단기법)

  • Kang, Yong-Cheol;Cha, Sun-Hee;Jang, Sung-Il;Kang, Hae-Gweon;Kim, Yong-Gyun;Park, Goon-Cherl
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.12
    • /
    • pp.2167-2172
    • /
    • 2008
  • A large scale embedded generator or a micro-grid is usually interconnected to the grid through the dedicated line. Immediately after the removal of the grid supply, it must be disconnected and remain disconnected until the normal grid supplies are restored. This paper proposes an islanding detection algorithm based on complex power at the intertie. Complex power at the intertie delivered to the grid has a value depending on power flow during normal operation. When loss of mains occurs, complex power at the intertie moves to a value depending on the parameters of the dedicated line. The performance of the proposed algorithm was investigated under various operating and fault conditions. The proposed algorithm can detect an islanding operation even if no power is exchanged prior to loss of mains and discriminate the fault condition from islanding.

A Study on the Adjusting Output Energy of the $CO_2$ Laser Controlled Directly in AC Power Line

  • Noh, Ki-Kyong;Jeong, Jong-Jin;Chung, Hyun-Ju;Kim, Hee-Je
    • KIEE International Transactions on Electrophysics and Applications
    • /
    • v.5C no.4
    • /
    • pp.152-154
    • /
    • 2005
  • We demonstrate a simple $CO_2$ laser by controlling firing angle of a TRIAC switch in ac power line. The power supply for our laser system switches the voltage of the AC power line (60Hz) directly. The power supply does not need elements such as a rectifier bridge, energy-storage capacitors, or a current-limiting resistor in the discharge circuit. In order to control the laser output power, the pulse repetition rate is adjusted up to 60Hz and the firing angle of TRIAC gate is varied from $45^{circ}$ to $135^{circ}$. A ZCS(Zero Crossing Switch) circuit and a PIC one-chip microprocessor are used to control the gate signal of the TRIAC precisely. The maximum laser output of 40W is obtained at a total pressure of 18 Torr, a pulse repetition rate of 60Hz, and a TRAIC gate firing angle of $90^{circ}$.

Medium Voltage HTS Cable Thermal Simulation using PSCAD/EMTDC

  • Jung, Chaekyun;Kang, Yeonwoog;Kang, Jiwon
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.1 no.1
    • /
    • pp.145-150
    • /
    • 2015
  • This paper described the medium voltage high temperature superconducting cable thermal simulation and its application. New simulation method for HTS cable modeling using PSCAD/EMTDC is introduced in this paper. The developed simulation method consists of electrical model part and thermal model part. In electrical model part, power loss and thermal capacitance can be calculated in each layer, then the temperature of each layer can be calculated by power loss and thermal capacitance in thermal model part. This paper also analyzes the electrical and thermal characteristic in the case of normal operating condition and transient including single line to ground fault and line to line ground fault using new simulation method.

Demand Response Effect on Market Power with Transmission Congestion in Electricity Market (전략적 수요반응이 송전선 혼잡의 시장지배력에 미치는 영향)

  • Lee, Kwang-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.12
    • /
    • pp.1705-1711
    • /
    • 2017
  • This paper analyzes the impact of DRA (Demand Response Aggregator) on market power when competing with power generation companies (Gencos) in the electricity market. If congestion occurs in the transmission line, the strategic choice of the power generation company increases exercise of market power. DRA's strategic reduction of power load impacts the strategy of Gencos, which in turn affects the outcome of the load reduction. As the strategy of Gencos changes according to the location of the congested transmission line, the impact on the market depends on the relative location of the congested line and the DRA.

The Electric Power System Remote Control Of Semiconductor Plasma Manufacturing Equipment Using Power Line Communication (Power Line Communication을 이용한 반도체 Plasma 장비 전력시스템 원격제어)

  • Lee, Nae-Il;Kim, Jin-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.1678-1679
    • /
    • 2007
  • This paper is the electric power system remote control of semiconductor plasma manufacturing equipment using PLC(power line communication). PLC is useful for economical data link but various problems and limitations are caused in using power lines for communications channel Develop of Semiconductor plasma manufactur ing equipment and remote automation technologies of tool develops day after day and standards. Also, Remote electric power control and device module control by GUIRCS(Graphic User Interface Remote Control System) of tool are monitoring in real time.

  • PDF

A Study on the Modeling of a Position Control System with a Pneumatic Cylinder Considering Transfer Characteristics of a Transmission Line (전달 관로의 전달특성을 고려한 공기압 실린더 구동장치의 모델링에 관한 연구)

  • Kang B.S.;Jang J.S.
    • Transactions of The Korea Fluid Power Systems Society
    • /
    • v.1 no.2
    • /
    • pp.20-25
    • /
    • 2004
  • In this study, a position control characteristics of pneumatic cylinder with transmission line is analyzed. Dynamic characteristics of transmission line using compressible fluid is changed by the flowing stiles of the fluid the diameter and the length of the line. But, the effect of the change of dynamic characteristics of transmission line by the flowing states on the position control characteristics can be neglected because of the friction force of the pneumatic cylinder. So, We assume that the position control characteristics is affected by the diameter and length of the transmission line. The experimental results according to the change of parameter of the transmission line show that the relation between the parameter of the transmission line and the position control characteristics of pneumatic cylinder driving system with the transmission line.

  • PDF