Analysis of effect on power system considering the maximum penetration limit of wind power (풍력발전 한계운전용량에 대한 계통영향 분석)

  • Myung, Ho-San;Kim, Bong-Eon;Kim, Hyeong-Taek;Kim, Se-Ho
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.3
    • /
    • pp.19-25
    • /
    • 2012
  • About supply and demand to see that you need to match, the limitations of wind power capacity is low demand and the commitment of the general generator will exist between the minimum generation. if the turbine's output can be controlled, The limitation of wind power capacity will be adopted based on instant power generation. Namely, The minimum limits of wind power generation based load operation by calculating the amount that is higher than if the output should be restricted to highest operation. in this paper, we committed to the demand for low enough that the combination of the general generator of wind power capacity to accommodate the operation of determining whether the limit is intended to. For this, power system analysis program PSS/E was used, Jeju system by implementing the model simulations were performed.

The Study on the Controller for Supplying Stably Power with a Stand-Alone Photovoltaic/Wind/Small Generator Hybrid Power Generation System (독립형 태양광, 풍력, 소형발전기 복합시스템에서 안정적인 전력공급을 위한 컨트롤러에 관한 연구)

  • Choi, Byoung-Soo;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.4
    • /
    • pp.48-56
    • /
    • 2012
  • The object of this paper is the controller for supplying stably power in a separate house in which a hybrid electrical storage system with a stand-alone photovoltaic/wind power generation system and a small generator is applied. In the photovoltaic/wind hybrid power system used in the separate house, when only the battery is used in sunless days, the capacity of the battery is become larger. In particular, as in recent days, if cloudy days are frequent due to anomaly climate, it is difficult to estimate the number of sunless days. Accordingly, it is preferable to build the electrical storage system that numbers of sunshineless days are to be controlled and a shortage amount of the power generation capacity is to be handled by a small generator system. In order to supply stably power of new renewable energy such as solar to any separate houses, it is preferable to reduce the capacity of battery by decreasing the number of sunless days when estimating the capacity of battery and to drive the small generator for compensation of the power shortage. Such system needs components including inverters for photovoltaic and wind power generation system, batteries and controllers for automatically driving the small generator, based upon the nature of the stand-alone house, and it is preferable to use the controller having a simpler and higher stability by adopting the all-in-one scheme to facilitate its maintenance.

Estimation of the Optimal Generation Capacity of Solar-Wind Hybrid Power System for Economic Operations (태양광-풍력 복합발전시스템의 경제적 운용을 위한 최적 용량 산정에 관한 연구)

  • Lee, Seung-Chul;Moon, Un-Chul;Kwon, Byeong-Gook;Kim, Jong-Hwan
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.18 no.3
    • /
    • pp.156-162
    • /
    • 2004
  • In this paper, a technique that estimate the optimal capacity of the solar-wind hybrid power system for minimizing the total monthly electric power expenses is presented. The hybrid power system is assumed to be operated in connection with the utility power system and electric bill be paid for the power not covered by the hybrid system generation. Monthly generation cost is estimated based on total life-cycle cost analysis. The monthly utility power bill is assumed to be increased quadratically in proportion with the net utility power consumption which is the difference between the total monthly load minus the hybrid system generations. Test results demonstrate applications potential of the proposed technique.

Bidding Strategics in Competitive Electricity Market (경쟁시장에서 입찰전략 수립에 관한 연구)

  • Ko, Young-Jun;Lee, Hyo-Sang;Shin, Dong-Jun;Kim, Jin-O
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.550-552
    • /
    • 2001
  • The vertically integrated power industry was divided into six generation companies and one market operator, where electricity trading was launched at power exchange. In this environment, the profits of each generation companies are guaranteed according to utilization of their own generation equipments. Especially, the electricity demand shows seasonal and weekly regular pattern, which the some capacity should be provided into ancillary service based on the past demand forecasting error and operating results of electricity market. Namely, if generation cost function is applied to SMP and BLMP as announced the previous day, the available generation capacity of the following day could be optimally distributed, and therefore contract capacity of ancillary service applied to CBP(Cost Based Pool) and TWBP(Two-Way Bidding Pool) is determined. Consequently, it is Possible to use the retained equipments optimally. This paper represents on efficient bidding strategies for generation equipments through the calculation of the contract and the application of each generator cost function based on the past demand forecasting error and market operating data.

  • PDF

A Study on the Development of Critical Transmission Operating Constraint Prediction (CTOCP) System With High Wind Power Penetration (대규모 풍력발전 계통 연계시 주요 송전망 제약예측시스템 개발에 관한 연구)

  • Hur, Jin
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.1
    • /
    • pp.86-93
    • /
    • 2015
  • Globally, wind power development is experiencing dramatic growth and wind power penetration levels are increasing. Wind generation is highly variable in time and space and it doesn't guarantee the system reliability and secure system operation. As wind power capacity becomes a significant portion of total generation capacity, the reliability assessment for wind power are therefore needed. At present, this operational reliability assessment is focusing on a generation adequacy perspective and does not consider transmission reliability issues. In this paper, we propose the critical transmission operating constraint prediction(CTOCP) system with high wind power penetration to enhance transmission reliability.

Effect of Generation Capacity Constraints on a Mixed Strategy Nash Equilibrium in a Multi-Player Game (다자게임에서 발전력제약이 복합전략 내쉬균형에 미치는 영향)

  • Lee, Kwang-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.1
    • /
    • pp.34-39
    • /
    • 2008
  • Nash Equilibrium(NE) is essential to investigate a participant's bidding strategy in a competitive electricity market. Congestion on a transmission line makes it difficult to compute the NE due to causing a mixed strategy. In order to compute the NE of a multi-player game, some heuristics are proposed with concepts of a key player and power transfer distribution factor in other studies. However, generation capacity constraints are not considered and make it more difficult to compute the NE in the heuristics approach. This paper addresses an effect of generation capacity limits on the NE, and suggest a solution technique for the mixed strategy NE including generation capacity constraints as two heuristic rules. It is reported in this paper that a role of the key player who controls congestion in a NE can be transferred to other player depending on the generation capacity of the key player. The suggested heuristic rules are verified to compute the mixed strategy NE with a consideration of generation capacity constraints, and the effect of the generation constraints on the mixed strategy NE is analyzed in simulations of IEEE 30 bus systems.

Effect of a large-scale wind farm on power system transient stability (대단위 풍력발전단지의 과도 안정도 특성에 관한 연구)

  • Yoon, Dong-Hee;Oh, Sea-Sung;Jang, Gil-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.226-227
    • /
    • 2006
  • Wind power is one of the fastest growing distributed generation types. As part of a worldwide trend, the concerns of large wind generation have been risen rather than small wind generation since it influences the whole power system Including the transient stability. The objective of this paper is to understand the effect of a large-scale wind generation on power system transient stability and to develop a systematic procedure to assess the effect according to the location and capacity of a wind farm. In the proposed procedure, an index is presented to evaluate the appropriateness of the location and capacity of a wind farm for transient stability contingencies.

  • PDF

Performance Analysis of long term operation for photovoltaic system (태양광발전시스템의 장기운전에 의한 성능변화 분석)

  • Kim, EuiHwan;Kim, Jungsam
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.110.1-110.1
    • /
    • 2011
  • This study analyzed the performance of long term operation photovoltaic system The 50 kWp grid connected photovoltaic system which was installed at KEPRI site in 1999 has been operated more than 12 years. In order to acquire long term operation characteristics of medium size photovoltaic system, the operation test data related on power generation electricity and capacity factor of 50 kWp system, which have been collected since 1999, were analysed. From the analysing results, 57.7 MWh in annual power generation electricity of 50 kWp photovoltaic system in 1999 has been decreased 49.1 MWh in 2005 and reached 38.0 MWh in 2010. In addition to, the capacity factor of 50 kWp photovoltaic system also showed 13.2 % in 1999, 11.2% in 2005 and finally reached 8.8% in 2011. The operation test data showed a trend of decreasing of generation electricity and capacity factor during the 12 years operation time and we guessed that was caused by solar cell performance degradation and decreasing of PCS system efficiency.

  • PDF

The long-term operating evaluation of the grid connected photovoltaic system (중규모 태양광발전시스템 장기 실증운전 평가)

  • Kim, Eui-Hwan;Ahn, Kyo-Sang;Lim, Hee-Chun
    • Journal of the Korean Solar Energy Society
    • /
    • v.29 no.5
    • /
    • pp.14-19
    • /
    • 2009
  • The 50 kWp grid connected photovoltaic system which was installed at KEPRI site in 1999 has been operated more than 10 years. In order to acquire long term operation characteristics of medium size photovoltaic system, the operation test data related on power generation electricity and capacity factor of 50 kWp system, which have been collected since 1999, were analysed. From the analysing results, 57.7 MWh in annual power generation electricity of 50 kWp photovoltaic system in 1999 has been decreased 49.1 MWh in 2005 and reached 41.9 MWh in 2008. In addition to, the capacity factor of 50 kWp photovoltaic system also showed 13.2 % in 1999, 11.2% in 2005 and finally reached 9.6% in 2008. The operation test data showed a trend of decreasing of generation electricity and capacity factor during the 10 years operation time and we guessed that was caused by solar cell performance degradation and decreasing of PCS system efficiency.

Capacity Factor-based Approximation Approach for Calculating Capacity Credit of Solar Power in Korea (국내 태양광 발전의 용량크레딧 산정을 위한 이용률 기반 근사화 방법)

  • Paik, Chunhyun;Chung, Yong Joo;Kim, Young Jin
    • Journal of the Korean Solar Energy Society
    • /
    • v.37 no.5
    • /
    • pp.13-26
    • /
    • 2017
  • Solar power is expected to account for a considerable proportion of domestic renewable energy compared to other renewable energy sources. In this study, capacity credits, which are the most important factors for evaluating the effective capacity of photovoltaic power, are estimated by capacity factor-based approximation method. To do this, we use the data of solar power generation and capacity over many years and calculate the capacity factors of the domestic solar power. The results of the existing methods and ours proposed in this paper are compared and analyzed.