• 제목/요약/키워드: Power Facility

검색결과 1,278건 처리시간 0.029초

배전용 변압기 단락강도 시험설비 개발 (Development of Short-circuit Testing Facility for Distribution Transformers)

  • 박지훈;민윤홍;강영학;유호근;안규선;함길호;오창주
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 춘계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.64-67
    • /
    • 2002
  • To increase the short-circuit testing capacity of distribution transformers, testing facility has been installed for KEPCO in Vi-wang. The power supply of testing facility is directly supplied from the network substation located closely. Testing can be performed up to 300 kVA for single-phase transformers, 500 kVA for three-phase transformers. Operating with this facility, the distribution company is able to maintain the reliable supply of electricity. Also the critical quality of transformers from manufacturers can be verified by short-circuit testing. This paper describes the design concept and specification of newly developed equipment and the procedure of short-circuit test.

  • PDF

소음/진동을 고려한 발전설비용 감속기 개발 (Development of Reducer for Generating Facility of Electric Power for Low Noise/vibration)

  • 이형우;박철우
    • 한국정밀공학회지
    • /
    • 제25권11호
    • /
    • pp.73-82
    • /
    • 2008
  • A dynamic model of reducer for generating facility of electric pourer having bevel gear pair and planetary gear train is developed by lumped method. The model accounts for the shaft and bearing flexibilities, gyroscopic effects and the force couplings among the transverse and torsion motions due to gearing. Vibration/noise analysis as well as strength of bevel gear pair and planetary gear train are considered. Exciting forces of high reducer for generating facility of electric power areconsidered as the mass unbalance of the rotors, misalignment and a function of gear transmission error. A Campbell diagram, in which the excitation sources caused by the mass unbalance of the rotors, misalignment and the transmitted errors of the gearing are considered, shows that, at the operating speed, there are not critical speed.

Design of online damage images detection system for large-aperture mirrors of high power laser facility based on wavefront coding technology

  • Fang, Wang;Qinxiao, Liu;Dongxia, Hu;Hongjie, Liu;Tianran, Zheng
    • Nuclear Engineering and Technology
    • /
    • 제53권9호
    • /
    • pp.2899-2908
    • /
    • 2021
  • The laser transport system of the high power laser facility is mainly composed of large-aperture laser transport mirrors (TMs). Obtaining the high-resolution online damage images during the operation, which is of great significance for operating safely of the mirrors and the facility. Based on wavefront coding, pan-tilt scanning and image stitching technologies, an online laser-damage images detection system is designed, and it can achieve high-precision detection of surface characteristics of large-aperture laser transport mirrors. The preliminary simulation proves that the system can solve the depth of field matching problem caused by pan-tilt tilt imaging and achieve higher resolution.

발전소 관리실의 작업환경 소음에 관한 연구 (A Study on the Workplace Noise Environment of Office Areas in Power Plant)

  • 김병삼
    • 한국생산제조학회지
    • /
    • 제7권4호
    • /
    • pp.35-41
    • /
    • 1998
  • The workplace noise environment is composed of three basic elements : manufacturing (in a generic sense) facilities, office areas, and the community around the facility. Work must be done by all employees , and this involves communication within a variety of locations within the facility ; areas may be extremely noisy, moderately noisy, or quiet, such as an office. At the same time, the facility should not be annoying to the community. In this paper, the workplace environmental noise of office areas in power plant are studied. Turbine generator in power plant generates the noise of 90∼95 dB(A) in the frequency range of 1 kHz, which may cause occupational hearing loss. By abatement method which are made of isolation material and distance damping effect, about 29.5 dB(A) reduction has been obtained in office areas of the Power Plant . But, the workplace environmental noise of office areas in the power plant is not suited to office's purpose.

제주시 폐기물환경사업소의 미활용에너지 활용방안 연구 (A Study on Unused Energy Management of Jeju City Waste Environment Center)

  • 김상혁;권기린;박윤철
    • 동력기계공학회지
    • /
    • 제8권1호
    • /
    • pp.48-54
    • /
    • 2004
  • In this study, waste heat of Jeju City Waste Environment Center is investigated and the utilization method is suggested with economical analysis of additional investment that needed for new facility. Energy balance of the typical facilities is considered in this study such as incineration plant and LFG power plant. The payback period of the investment which is used for the LFG power plant waste heat utilization facility is about 2.4 years and the economic profit of the facility during 10 years operation is up to 926 million won.

  • PDF

Pseudo-BIPV Style Rooftop-Solar-Plant Implementation for Small Warehouse Case

  • Cha, Jaesang;Cho, Ju Phil
    • International journal of advanced smart convergence
    • /
    • 제11권3호
    • /
    • pp.187-196
    • /
    • 2022
  • In this paper, we propose an example of designing and constructing a roof-type solar power plant structure equipped with a Pseudo-BIPV (Building-Integrated Photovoltaic) shape suitable for use as a roof of a small warehouse with a sandwich-type panel structure. As the characteristics of the roof-type solar power generation facility to be installed in the small warehouse proposed in this study, the shape of the roof is not a general A type, but a right-angled triangle shape with the slope is designed to face south. We chose a structure in which an inverter for one power plant and a control facility are linked by grouping several roofs of buildings. In addition, the height of the roof structure is less than 20 cm from the floor, and it has a shape similar to that of the BIPV, so it is building-friendly because it is almost in close contact with the roof. At the same time, the roof creates a reflective light source due to the white color. By linking this roof with a double-sided solar panel, we designed it to obtain both the advantage of the roof-friendliness and the advantage of efficiency improvement for the electric power generation based on the double-sided panel. Compared to the existing solar power generation facilities using A-shaped cross-sectional modules, the power generation efficiency of roofs in this case is increased by more than 11%, which we can confirm, through the comparison analysis of monitoring data between power plants in the same area. Therefore, if the roof-type solar structure suitable for the small warehouse we have presented in this paper is used, the facilities of electric power generation is eco-friendly. Further it is easier to obtain facility certification compared to the BIPV, and improved capacity of the power generation can be secured at low material cost. It is believed that the roof-type solar power generation facility we proposed can be usefully used for warehouse or factory-based smart housing. Sensor devices for monitoring, CCTV monitoring, or safety and environment management, operating in connection with the solar power generation facilities, are linked with the Internet of Things (IoT) solution, so they can be monitored and controlled remotely.

해양교통시설물의 파력발전 방오장치 설계 (Design of Marine Transport Facilitie's Anti-Fouling System of Wave Power Generation)

  • 김지윤;조관준;한성훈;오진석
    • 한국마린엔지니어링학회:학술대회논문집
    • /
    • 한국마린엔지니어링학회 2011년도 전기공동학술대회 논문집
    • /
    • pp.192-192
    • /
    • 2011
  • For the safety of vessels sailing Marine Transport Facility announces sea route, reefs or shallow water. Photovoltaic, independent power system, installation in the general Marine Transport Facilities to be used in the marine lantern. Due to install of communications, controls, power consumption inceases. And the weather of cloudy day or rainy, generation of electricity is decrease. Recently, power system of marine facility using a hybrid generation system, photovoltaic generation system and wave power generation system. But increase of adhered shellfish inside the water column, is the cause of the reduction of efficiency. So study was conducted to Single channel AFS(Anti-Fouling system). In this paper we offer the Multi channel AFS for Marine Transport Facility and have simulated. Improve the accuracy of the research, we using the result of anode, in the experiment were actually in the buoy, is based on simulation. The experimental results is shown every anode's, in the Marine Transport Facility, ionization was conducted identically.

  • PDF

Water Balance Evaluation of Final Closure Cover for Near- surface Radioactive Wastes Disposal Facility

  • Keunmoo Chang;Park, Joo-Wan;Yoon, Jeong-Hyoun;Park, Heui-Joo;Kim, Chang-Lak
    • Nuclear Engineering and Technology
    • /
    • 제32권3호
    • /
    • pp.274-282
    • /
    • 2000
  • The simulation of water balance was conducted for suggested four alternative multi-layer cover design of near-surface radioactive waste disposal facility under domestic climate condition. The analysis was also conducted for the most favorable one out of four alternative cover design under conservative scenarios. Until 100 years after closure of disposal vault, the infiltration flux for the most favorable cover design was negligible even under doubling of the ambient precipitation condition. When the degradation of asphalt and geomembrane after 100 years of closure was considered, the infiltration flux significantly increased almost to the design criteria of cover system in I' Aube disposal facility. And it was found that the hydraulic conductivity of bentonite/sand as a bottom barrier should be no greater than 1$\times$10$^{-7}$ cm/sec recommended by U.S. EPA.

  • PDF

Review of Aging Management for Concrete Silo Dry Storage Systems

  • Donghee Lee;Sunghwan Chung;Yongdeog Kim;Taehyung Na
    • 방사성폐기물학회지
    • /
    • 제21권4호
    • /
    • pp.531-541
    • /
    • 2023
  • The Wolsong Nuclear Power Plant (NPP) operates an on-site spent fuel dry storage facility using concrete silo and vertical module systems. This facility must be safely maintained until the spent nuclear fuel (SNF) is transferred to an external interim or final disposal facility, aligning with national policies on spent nuclear fuel management. The concrete silo system, operational since 1992, requires an aging management review for its long-term operation and potential license renewal. This involves comparing aging management programs of different dry storage systems against the U.S. NRC's guidelines for license renewal of spent nuclear fuel dry storage facilities and the U.S. DOE's program for long-term storage. Based on this comparison, a specific aging management program for the silo system was developed. Furthermore, the facility's current practices-periodic checks of surface dose rate, contamination, weld integrity, leakage, surface and groundwater, cumulative dose, and concrete structure-were evaluated for their suitability in managing the silo system's aging. Based on this review, several improvements were proposed.

소형 축류터빈의 상온 성능시험기 개발 (Development of a Test Facility for Cold-air Performance of Small Axial Turbine)

  • 손창민;차봉준;이대성
    • 대한기계학회논문집
    • /
    • 제19권7호
    • /
    • pp.1780-1786
    • /
    • 1995
  • The main goal of the present study is to establish the techniques and methodolgies of turbine performance test through evaluating the objective turbine test piece, and checking the reliability of the self-developed test facility by performing a series of turbine tests under ambient temperature condition. A high speed coupling, a lubrication system and a test bed of the test facility were modified through a series of preliminary test in order to reduce the vibration and oil leakage. The flowrate control of the test facility and data acquisition were accomplished by using a software called "Labview" The measurement of shaft horse power and control of rotational speed according to the conditions of turbine rotation were performed by a separate system. The preliminary evaluation of the measured data suggests that the developed test facility and the test technique can be used reliably for the performance test of turbines with the minor improvement.provement.