• Title/Summary/Keyword: Power Constraint

Search Result 500, Processing Time 0.027 seconds

Reference Trajectory Design for Atmosphere Re-entry of Transportation Mechanical Structure (수송기계구조물의 대기권 재진입 기준궤도 설계)

  • Park, J.H.;Eom, W.S.
    • Journal of Power System Engineering
    • /
    • v.7 no.4
    • /
    • pp.67-73
    • /
    • 2003
  • The entry guidance design involves trajectory optimization and generation of a drag acceleration profile as the satisfaction of trajectory conditions during the entry flight. The reference trajectory is parameterized and optimized as piecewise linear functions of the velocity. A regularization technique is employed to achieve desired properties of the optimal drag profile. The regularized problem has smoothness properties and the minimization of performance index then prevents the drag acceleration from varying too fast, thus eliminating discontinuities. This paper shows the trajectory control using the simple control law as well as the information of reference drag acceleration.

  • PDF

Combined Design of Robust Control System and Structure System (강인성 제어 시스템과 구조 시스템의 통합 최적 설계)

  • Park, J.H.
    • Journal of Power System Engineering
    • /
    • v.7 no.4
    • /
    • pp.38-43
    • /
    • 2003
  • This paper proposes an optimum design problem of structural and control systems. taking a 3-D truss structure as an example. The structure is supposed to be subjected to initial static loads and time-varying disturbances. The structure is controlled by a state feedback $H_{\infty}$ controller to suppress the effect of the disturbances. The design variables are the cross sectional areas of truss members. The structural objective function is the structural weight. As the control objective, we consider two types of performance indices. The first function represents the effect of the initial loads. The second one is the norm of the feedback gain. These objective functions are in conflict with each other. Then, first, two control objective functions are transformed into one control objective by the weighting method. Next, the structural objective is treated as the constraint. By introducing the second control objective which considers the magnitude of the feedback gain, we can per limn the design which is robust in modeling errors.

  • PDF

The Maximum Installable DG Capacity According to Operation Methods of Voltage Regulator in Distribution Systems (배전계통의 전압조정기 운영방법에 따른 분산형전원 최대 도입 용량 산출)

  • Kim, Mi-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.7
    • /
    • pp.1263-1269
    • /
    • 2009
  • Stable and sustainable power supply means maintaining a certain level of power quality and service while securing energy resource and resolving environmental issues. Distributed generation (DG) has become an essential and indispensable element from environmental and energy security perspectives. It is known that voltage violation is the most important constraint for load variation and the maximum allowable DG. In distribution system, sending voltage from distribution substation is regulated by ULTC (Under Load Tap Changer) designed to maintain a predetermined voltage level. ULTC is controlled by LDC (Line Drop Compensation) method compensating line voltage drop for a varying load, and the sending voltage of ULTC calls for LDC parameters. The consequence is that the feasible LDC parameters considering variation of load and DG output are necessary. In this paper, we design each LDC parameters determining the sending voltage that can satisfy voltage level, decrease ULTC tap movement numbers, or increase DG introduction. Moreover, the maximum installable DG capacity based on each LDC parameters is estimated.

A Study on Project Scheduling under Multiple Resource Constraints (다수 자원제약 하에서의 프로젝트 일정계획에 관한 연구)

  • Lee, Jeong-Hun;Kim, Pan-Sool;Moon, Il-Kyeong
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.36 no.4
    • /
    • pp.219-229
    • /
    • 2010
  • The PERT/CPM are considered as the base procedures for the most successful project scheduling programs. Unfortunately, it is not easy to apply these procedures to real-life projects. This is due to the fact that PERT/CPM assume an infinite number of resources for each activity in project networks. Obviously, the completion time under no constraints is less than when constraints are imposed. One way of approaching this problem is to use heuristic solution techniques. In this paper, we present three heuristics; MRU (Maximum Resource Use) rule, STU (Shortest Time Use) rule, MRUP (Max Resource Use and Period) rule for allocating resources to activities of projects under multiple resource constraints. Comparisons of the project durations show that these heuristic rules are superior to AG3 rule that has been widely used in practice (Elsayed and Boucher, 1994).

The Analysis of The Domestic Transmission System and Transmission Congestion Price (국내 송전계통 및 송전제약 비용 분석)

  • Baeck Woong Ki;Chun Yeong han;Kim Jung hun;Kwak No hong;Son In Jun
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.737-739
    • /
    • 2004
  • The domestic power system established with Cost-Based-Pricing(CBP) from April 2001. The system is a uniform pricing system. System Operator(50) establishes a Price Setting Schedule by the prediction of consumption and the presented bid price(generation cost) of the generation utility. But the Price Setting Schedule doesn't take account of the constraint of the system. This cause a transmission congestion, constrained-on generation and constrained-off generation. This Paper search the way of the increasing efficiency of domestic power system through the redemption of congestion charge.

  • PDF

The Development of Optimal Power Flow Algorithm Considering Environmental Constants (환경제약을 고려한 최적조류계산 알고리즘의 개발에 관한 연구)

  • Kim, Yong-Ha;Lee, Buhm;Choi, Sang-Kyu;Moon, Hyuc-Ki;Jung, Hyun-Sung
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.11
    • /
    • pp.551-558
    • /
    • 2002
  • This paper describes an optimal power flow algorithm considering environmental constraints. In this algorithm, we use the costate method, concepts of fictitious generator, variable reduction and effective constraint for the effective linear programming application. Especially we consider environmental constraints. The proposed method is applied to IEEE RTS-30 model system, 24 and 96 Reliability Test Systems and the results shows the effectiveness of the method.

A Study on the Decomposition of Nodal Price for the Zonal Evaluation of System Loss & Congestion Cost (손실 및 혼합비용의 지역별 산정을 위한 모선한계가격의 분해에 관한 연구)

  • Lee, S.R.;Kim, S.A.;Jeong, M.H.;Lee, B.;Cha, J.M.
    • Proceedings of the KIEE Conference
    • /
    • 2000.11a
    • /
    • pp.6-9
    • /
    • 2000
  • This paper presents the detailed derivation of optimal nodal price for active power to regionally evaluate system loss and congestion cost. The method is to decompose them into different components corresponding to system loss, transmission congestion, voltage constraint, and so on. The decomposed information for nodal price can be used to provide economic signals for generation or transmission investment as well as to improve the efficient usage of power grid and congestion management. The result of case study on IEEE 30 bus system is reported to illustrate the proposed method.

  • PDF

A Method of Determining B-coefficient Applying VDLM/LRDA (전압의존형 부하모델과 손실재분배 알고리즘을 적용한 B계수 산정법)

  • Chae, Myung-Suk;Lee, Myung-Hwan;Kim, Byung-Seop;Shin, Joong-Rin
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1183-1185
    • /
    • 1999
  • The basic purpose of economic dispatch problem is that minimize fuel cost with inequality constraint of generator output. To solve this problem it is very important to express power loss equation that have quadratic function of generator output power included B-coefficient. This Paper presents a method in determining B-coefficient by use A-matrix that is calculated by loss re-distribution algorithm (LRDA) considering voltage dependent load model (VDLM)s. The Proposed algorithm is tested with IEEE 6 bus sample system, which shows the result in each cases by the change of load component factor.

  • PDF

Approximate Optimization of the Power Transmission Drive Shaft Considering Strength Design Condition (강도 조건을 고려한 동력 전달 드라이브 샤프트의 근사최적설계)

  • Shao, Hailong;Lee, Jongsoo
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.24 no.2
    • /
    • pp.186-191
    • /
    • 2015
  • Presently, rapidly changing and unstable global economic environments demand engineers. Products should be designed to increase profits by lowering costs and provide distinguished performance compared with competitors. This study aims to optimize the design of the power-transmission drive shaft. The mass is reduced as an objective function, and the stress is constrained under a constant value. To reduce the number of experiments, CCD (central composite design) and D-Optimal are used for the experimental design. RSM (response surface methodology) is employed to construct a regression model for the objective functions and constraint function. In this problem, there is only one objective function for the mass. The other objective function gives 1; thus, NSGA-II is used.

Sensitivity Analysis on the Priority Order of the Radiological Worker Allocation Model using Goal Programming

  • Jung, Hai-Yong;Lee, Kun-Jai
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1998.05b
    • /
    • pp.577-582
    • /
    • 1998
  • In nuclear power plant, it has been the important object to reduce the occupational radiation exposure (ORE). Recently, the optimization concept of management science has been studied to reduce the ORE in nuclear power plant. In optimization of the worker allocation, the collective dose, working time, individual dose, an total number of worker must be considered and their priority orders must be thought because the main constraint is necessary for determining the constraints variable of the radiological worker allocation problem. The ultimate object of this study s to look into the change of the optimal allocation of the radiological worker as priority order changes. In this study, the priority order is the characteristic of goal programming that is a kind of multi-objective linear programming. From a result of study using goal programming, the total number of worker and collective dose of worker have changed as the priority order has changed and the collective dose limit have played an important role in reducing the ORE.

  • PDF