• Title/Summary/Keyword: Potential hydropower

Search Result 38, Processing Time 0.028 seconds

Damage analysis of arch dam under blast loading

  • Xue, Xinhua;Yang, Xingguo;Zhang, Wohua
    • Computers and Concrete
    • /
    • v.12 no.1
    • /
    • pp.65-77
    • /
    • 2013
  • This paper examines the dynamic response of an arch dam subjected to blast loading. A damage model is developed for three dimensional analysis of arch dams. The modified Drucker-Prager criterion is adopted as the failure criteria of the damage evolution in concrete. Then, Xiluodu arch dam serves as an example to simulate the failure behaviors of structures with the proposed model. The results obtained using the proposed model can reveal the reliability degree of the safe operation level of the high arch dam system as well as the degree of potential failure, providing a reliable basis for risk assessment and risk control.

Micro-Hydropower System with a Semi-Kaplan Turbine for Sewage Treatment Plant Application: Kiheung Respia Case Study (하수처리장 적용을 위한 Semi-카플란 수차가 장착된 마이크로수력발전 시스템: 기흥레스피아 사례)

  • Chae, Kyu-Jung;Kim, Dong-Soo;Cheon, Kyung-Ho;Kim, Won-Kyoung;Kim, Jung-Yeon;Lee, Chul-Hyung;Park, Wan-Soon
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.35 no.5
    • /
    • pp.363-370
    • /
    • 2013
  • Small scale hydropower is one of most attractive and cost-effective energy technologies for installation within sewage treatment plants. This study was conducted to evaluate the potential of a semi-kaplan micro-hydropower (MHP) system for application to sewage treatment plants with high flow fluctuations and a low head. The semi-kaplan MHP is equipped with an adjustable runner blade, and is without a guide vane, so as to reduce the incidence of mechanical problems. A MHP rating 13.4 kWp with a semi-kaplan turbine has been considered for Kiheung Respia sewage treatment plant, and this installation is estimated to generate 86.8 MWh of electricity annually, which is enough to supply electricity to over 25 households, and equivalent to an annual reduction of 49 ton $CO_2$. The semi-kaplan turbine showed a 90.2% energy conversion efficiency at the design flow rate of 0.35 $m^3/s$ and net head of 4.7 m, and was adaptable to a wide range of flow fluctuations. Through the MHP operation, approximately 2.1% of total electricity demand of Kiheung Respia sewage treatment plant will be achievable. Based on financial analysis, an exploiting MHP is considered economically acceptable with an internal rate of return of 6.1%, net present value of 15,539,000 Korean Won, benefit-cost ratio of 1.08, and payback year of 15.5, respectively, if initial investment cost is 200,000,000 Korean Won.

Scenario-based Vulnerability Assessment of Hydroelectric Power Plant (시나리오 기반 수력플랜트 설비의 취약성 평가)

  • Nam, Myeong Jun;Lee, Jae Young;Jung, Woo Young
    • Journal of Korean Society of Disaster and Security
    • /
    • v.14 no.1
    • /
    • pp.9-21
    • /
    • 2021
  • Recently, the importance of eco-friendly power generation facility using renewable energy has newly appeared. Hydropower plant is a very important source of electricity generation and supply which is very important to secure safety because it is commonly connected with multi facility and operated on a large scale. In this study, a scenario-based analysis method was suggested to assess vulnerability of a penstock system caused by water hammer commonly occurred in the operation of hydropower plants. A hypothetical hydropower plant was used to demonstrate the applicability of a transient analysis model. In order to verify reliability of the model, the prediction of pressure behaviors were compared with the results of commercial model (SIMSEN) and measured data, then a real hydroelectric power plant was applied to develop all potential water hammer scenarios during the actual operation. The scenario-based simulation and vulnerability assessment for water hammer in the penstock system were performed with internal and external load conditions. The simulation results indicated that the vulnerability of a penstock system was varied with the operating conditions of hydropower facilities and significantly affected by load combination consisting of different load scenarios. The proposed numerical method could be an useful tool for the vulnerabilityty assessment of the hydropower plants due to water hammer.

The Performance Analysis of a Counter-rotating Tubular Type Turbine with the Number of Runner Vane (러너베인 깃수의 변화에 따른 튜블러형 상반전 수차의 성능해석)

  • Park, Jihoon;Lee, Nakjoong;Hwang, Youngho;Kim, Youtaek;Lee, Youngho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.192.1-192.1
    • /
    • 2010
  • Micro hydraulic turbines take a growing interest because of its small and simple structure as well as high possibility of applying to micro and small hydropower resources. The differential pressure exiting within the city water pipelines can be used efficiently to generate electricity like the energy generated through gravitational potential energy in dams. In order to reduce water pressure at the inlet of water cleaning centers, pressure reducing valves are used widely. Therefore, pressure energy is wasted. Instead of using the pressure reduction valve, a micro counter-rotating hydraulic turbine can be replaced to get energy caused by the large differential pressure found in the city water pipelines. In this paper, detail studies have been carried out to acquire basic design data of micro counter-rotating hydraulic turbine, output power, head, and efficiency characteristics on various number of runner vane. Moreover, the influences of pressure, tangential and axial velocity distributions on turbine performance are also investigated.

  • PDF

Priority assessment and estimation of annual power generation for potential development site of hydroelectric dam in North Korea (북한지역 수력발전댐 개발가능지점에 대한 연간가능발생전력량 분석 및 개발 우선순위 평가)

  • Kwon, Minsung;Kim, Tae-Woong;Ahn, Jaehyun
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.10
    • /
    • pp.929-939
    • /
    • 2018
  • In North Korea, hydropower which occupies about 63% of power generation is a major electric power source, and North Korea has many advantages in the geographical for developing hydroelectric power. In this study, Information on the basin and dam capacity for 33 potential development site of hydroelectric dam was analyzed using DEM, and potential annual power generation was estimated by applying results of long-term runoff simulation with MWSWAT model for recent 30-year. The potential annual power generation at 33 dam was estimated to be about 28% of the current hydroelectric power in North Korea. In addition, a priority of dam development in each province was assessed by estimating the scale of an industry and prospecting the population change in the future. And a priority for dam development within the province was estimated based on the dam capacity and the potential annual power generation. The priority of each province was ranked in order of Pyeongannamdo, Hamgyungnamdo, Hamgyungbukdo, Hwanghaebukdo, Pyeonganbukdo, Jagangdo, Ryanggangdo, Hwanghaenamdo, and Gangwondo. The results of this study can be used as an initial review data for advancing to hydropower development project in North Korea.

Priority Decision of Small Hydropower Development using Spatial Multi-Criteria Decision Making (공간 다기준의사결정을 활용한 소수력 개발의 우선순위 결정)

  • Kim, Gil-Ho;Yi, Choong-Sung;Yeo, Gyu-Dong;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.12
    • /
    • pp.1029-1038
    • /
    • 2009
  • Recently, it is expected that small hydropower (SHP) could potentially provide sufficient amounts of alternative energy in Korea where there is an abundance of potential sites and where social efforts are being made to reduce the emissions of green house gases. In the past, the resources survey for SHP development has been carried out using onsite surveys and paper maps, which incurred a great deal of time and cost. Furthermore, the tools for decision making such as determining development priorities or evaluating feasibility have been considered only economic aspect and focused on the performance characteristics of power generation. However, as the concept of sustainable development has been being advanced in recent years, especially focused on human-social, environmental and ecological in addition to economical sector; the consideration of these multiple criteria has become essential for sustainable SHP development. This study aims to propose the spatial multi-criteria decision making (MCDM) methodology for determining priorities among a number of locations on the planning stage of SHP development using AHP and GIS. The proposed methodology is applied for determining development priorities among the SHP locations in Cho River basin and this study presents the detailed spatial information data and the results of development priorities. As a fundamental work, this study will be beneficial to the future activation of SHP development and will help the decision making in evaluating the feasibility of SHP development.

Evaluation of hydrokinetic energy potentials of selected rivers in Kwara State, Nigeria

  • Adeogun, Adeniyu Ganiyu;Ganiyu, Habeeb Oladimeji;Ladokun, Laniyi Laniran;Ibitoye, Biliyamin Adeoye
    • Environmental Engineering Research
    • /
    • v.25 no.3
    • /
    • pp.267-273
    • /
    • 2020
  • This Hydrokinetic energy system is the process of extracting energy from rivers, canals and others sources to generate small scale electrical energy for decentralized usage. This study investigates the application of Soil and Water Assessment Tool (SWAT) in Geographical Information System (GIS) environment to evaluate the theoretical hydrokinetic energy potentials of selected Rivers (Asa, Awun and Oyun) all in Asa watershed, Kwara state, Nigeria. SWAT was interfaced with an open source GIS system to predict the flow and other hydrological parameters of the sub-basins. The model was calibrated and validated using observed stream flow data. Calibrated flow results were used in conjunction with other parameters to compute the theoretical hydrokinetic energy potentials of the Rivers. Results showed a good correlation between the observed flow and the simulated flow, indicated by ash Sutcliffe Efficiency (NSE) and R2 of 0.76 and 0.85, respectively for calibration period, and NSE and R2 of 0.70 and 0.74, respectively for the validation period. Also, it was observed that highest potential of 154.82 MW was obtained along River Awun while the lowest potential of 41.63 MW was obtained along River Asa. The energy potentials obtained could be harnessed and deployed to the communities around the watershed for their energy needs.

Policy implication of nuclear energy's potential for energy optimization and CO2 mitigation: A case study of Fujian, China

  • Peng, Lihong;Zhang, Yi;Li, Feng;Wang, Qian;Chen, Xiaochou;Yu, Ang
    • Nuclear Engineering and Technology
    • /
    • v.51 no.4
    • /
    • pp.1154-1162
    • /
    • 2019
  • China is undertaking an energy reform from fossil fuels to clean energy to accomplish $CO_2$ intensity (CI) reduction commitments. After hydropower, nuclear energy is potential based on breadthwise comparison with the world and analysis of government energy consumption (EC) plan. This paper establishes a CI energy policy response forecasting model based on national and provincial EC plans. This model is then applied in Fujian Province to predict its CI from 2016 to 2020. The result shows that CI declines at a range of 43%-53% compared to that in 2005 considering five conditions of economic growth in 2020. Furthermore, Fujian will achieve the national goals in advance because EC is controlled and nuclear energy ratio increased to 16.4% (the proportion of non-fossil in primary energy is 26.7%). Finally, the development of nuclear energy in China and the world are analyzed, and several policies for energy optimization and CI reduction are proposed.

Municipal Solid Waste Management: Challenges and Opportunities in Nepal

  • Gurung, Anup;Oh, Sang-Eun
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.45 no.3
    • /
    • pp.421-427
    • /
    • 2012
  • Nepal is one of the least urbanized countries in the world where more than 80% of the total population live in rural areas. In recent years, the rate of urbanization became rampant which ultimately accelerated immense pressure on municipal services, especially on managing the ever increasing amount of wastes. Due to lack of technology, infrastructure and financial capacity management of increasing amount of solid waste has become a major challenge in municipalities of Nepal. The indiscriminate dumping of solid wastes already affected the urban environment by creating a serious occupational health and environmental hazard to the vicinity of the dumping sites. However, there is great possibility of recovering methane from the landfill sites since the typical Nepalese municipal solid waste contains more than 65% of organic wastes. Despite having enormous potential of generating electricity from hydropower, Nepal is facing acute shortage of energy. Therefore, comprehensive scientific research and development is necessary for making solid waste to environmentally friendly by converting waste to the energy.

Fractal behavior identification for monitoring data of dam safety

  • Su, Huaizhi;Wen, Zhiping;Wang, Feng
    • Structural Engineering and Mechanics
    • /
    • v.57 no.3
    • /
    • pp.529-541
    • /
    • 2016
  • Under the interaction between dam body, dam foundation and external environment, the dam structural behavior presents the time-varying nonlinear characteristics. According to the prototypical observations, the correct identification on above nonlinear characteristics is very important for dam safety control. It is difficult to implement the description, analysis and diagnosis for dam structural behavior by use of any linear method. Based on the rescaled range analysis approach, the algorithm is proposed to identify and extract the fractal feature on observed dam structural behavior. The displacement behavior of one actual dam is taken as an example. The fractal long-range correlation for observed displacement behavior is analyzed and revealed. The feasibility and validity of the proposed method is verified. It is indicated that the mechanism evidence can be provided for the prediction and diagnosis of dam structural behavior by using the fractal identification method. The proposed approach has a high potential for other similar applications.