• 제목/요약/키워드: Post-monitoring and maintenance

검색결과 26건 처리시간 0.023초

생태계보전협력금 반환사업 사후관리 실태와 개선 방안 (A Study on the Post-management and Improvement of Ecosystem Conservation Fund Return Projects)

  • 이지현;성현찬
    • 한국환경복원기술학회지
    • /
    • 제16권2호
    • /
    • pp.1-12
    • /
    • 2013
  • This study reviews the current conditions of the completed 'Ecosystem Conservation Fund Return Project' sites to suggest management methods for their conservation and sustainability. For the scope of the study, five microsites of completed return projects in Seoul were selected and their project planning documents were reviewed to help with site surveying and analysis. To increase the accuracy of the site surveying and analysis, and to evaluate the management problems from different perspectives, the site managers were interviewed in-depth. The experts were surveyed as well to develop a realistic and practical improvement method. The survey results helped to categorize the post-management problems, and separate improvement methods were suggested for each category. First, the post-management guidelines are proposed for the ecosystem-based environment/ecosystem environment, user management, and monitoring. These guidelines will increase the expertise and practicality of the management principles. Second, the regulations for the participation of expert management enterprises and the development of separate monitoring or maintenance management team are suggested. These regulations will improve the participation of experts and consistency of management systems. Third, the post monitoring or maintenance management during the year after the project completion should be set as a separate project to secure budget. Furthermore, policies and/or institutions should be established to set a portion of ecosystem conservation return fund or a grant for post monitoring and maintenance management. Forth, as a way of adaptive management, at least more than three years of post-management should be evaluated under detailed categories and vigorous standard to improve the institutional operation for 'Ecosystem Conservation Fund Return Projects'.

운봉 향교 정밀 모니터링을 통한 목재 기둥 부재의 함수율 분포 특성 (Study on Moisture Contents Distribution of Wooden Post Member by Precise Monitoring in Un-Bong Confucian School)

  • 박천영;김광철
    • 한국가구학회지
    • /
    • 제24권1호
    • /
    • pp.104-112
    • /
    • 2013
  • Monitoring for moisture contents of wooden post member of Un-bong confucian school was performed in 6 months and analyzed to conserve scientifically the wooden culture building and open for common people. In inner post member of the building, variation of moisture contents was very small and upper part had relatively higher moisture contents. In outer post member, moisture contents were changed according to the weather conditions and was relatively high in bottom and upper part. Southern post has lower moisture content than eastern. These results were related to air ventilation in interior, depth of eaves and orientation of the building. In the design, construction and maintenance of wooden building, characteristics of wood should be considered like moisture contents.

  • PDF

도로비탈면 녹화공사의 사후환경평가 항목 제언 (Suggestion of the Post-Environmental Evaluation of Road-side Cut Slope after Revegetation Works)

  • 김태국;김남춘;김은범;구민규
    • 한국환경복원기술학회지
    • /
    • 제21권4호
    • /
    • pp.75-86
    • /
    • 2018
  • This research was thereby made to study and analysis ecological, landscape, and stability qualities of roadside cut Slopes in expressways and national highways that went through revegetation works. Also, evaluation items and framework for integrated assessment of plant structure and restored state for the maintenance were suggested. Following is the summary of the result. firstly, for stabilization of introduced native plant species on roadside cut slops, assessment on the post-project environmental management through long-term monitoring and maintenance works must be made. It signifies a form of authentic recovery and restoration by the native plants. second, current evaluation framework on the test beds is well managed with clear evaluation standards and table while its method of assessing the post management with only test bed results lacks conformity with this study site. Newly developed evaluation framework on the post construction sites is estimated to be used as assessment standards on any roadside construction sites. Third, after site investigation distinction was observed among different revegetating construction types in the long-term perspective. Due to the different duration time of vegetation state between seed-spray measures(degraded in time) and layer-spray measure(maintained), the use of coarse straw-mat mulching work or Coir net was suggested in long term maintenance of cut slopes. forth, segmentation of post environmental assessment is organized into three large categories of "ecological", "stabile", and "landscape" qualities regarding post restoration quality and stability of slope through native plants with which categories marks 50, 30, 20 points of rates. fifth, components of the post environmental assessment were segmented in twelve categories driving results from former experimental construction and newly focused items on site. In the future, it is possible to propose a customized assessment method considering the location and location of construction work if the research on the application of post-environment assessment methods for road construction surface recording is conducted systematically.

환경영향평가 협의 시 대체서식지 조성을 위한 가이드라인 마련 (A Study on the Guidelines for Creating Alternative Habitats through Environmental Impact Assessment)

  • 심윤진;박용수
    • 한국환경복원기술학회지
    • /
    • 제22권5호
    • /
    • pp.69-79
    • /
    • 2019
  • The purpose of this study is to suggest a guideline that can be used as a standard for consultation and review by environmental impact assessment consultation and review practitioner to enhance the practical effectiveness of creating alternative habitats. The consultation stage of environmental impact assessment was significantly divided into 1) preparation of draft environmental impact assessment reports and gathering of consensus thereon, 2) preparation of environmental impact assessment reports and consultation thereon, 3) follow-up survey of environmental impacts(under construction) and 4) follow-up survey of environmental impacts(in operation). And it was suggested that the procedures of creating alternative habitat by each consultation stage were linked in order of 1) planning, 2) designing, 3) construction, and 4) post-monitoring and maintenance. The basic principles were also proposed for each stage of consultation on environmental impact assessment and procedure for the creation of alternate habitats. Then, issues and methods to be reviewed by the consulting agency and review agency of environmental impact assessment were presented in detail. The guideline of this study provides important information not only to environmental impact assessment consultation and review practitioner, but also to developers and environmental impact assessment agents who plan, construct, and manage alternative habitats.

Structural monitoring and identification of civil infrastructure in the United States

  • Nagarajaiah, Satish;Erazo, Kalil
    • Structural Monitoring and Maintenance
    • /
    • 제3권1호
    • /
    • pp.51-69
    • /
    • 2016
  • Monitoring the performance and estimating the remaining useful life of aging civil infrastructure in the United States has been identified as a major objective in the civil engineering community. Structural health monitoring has emerged as a central tool to fulfill this objective. This paper presents a review of the major structural monitoring programs that have been recently implemented in the United States, focusing on the integrity and performance assessment of large-scale structural systems. Applications where response data from a monitoring program have been used to detect and correct structural deficiencies are highlighted. These applications include (but are not limited to): i) Post-earthquake damage assessment of buildings and bridges; ii) Monitoring of cables vibration in cable-stayed bridges; iii) Evaluation of the effectiveness of technologies for retrofit and seismic protection, such as base isolation systems; and iv) Structural damage assessment of bridges after impact loads resulting from ship collisions. These and many other applications show that a structural health monitoring program is a powerful tool for structural damage and condition assessment, that can be used as part of a comprehensive decision-making process about possible actions that can be undertaken in a large-scale civil infrastructure system after potentially damaging events.

LCA를 적용한 하천환경영향평가 방법 (A Method of River Environmental Impact Assessment using LCA)

  • 김성준;김명희;전용태;신선미;최용승;원찬희
    • 환경영향평가
    • /
    • 제21권1호
    • /
    • pp.93-104
    • /
    • 2012
  • In this research LCA methodology was adapted and analyzed in quantifying estimation of estuarine environment. The analysed objects of estuarine environment were construction methods, facility, and input material into water, and estuarine ecosystem. In this research the function of LCA of estuarine environment was river with the view of controling water, utilizing water, and hydrophilic function. According to the result of research, environmental damage indicator of facility was decreased 346 Pt from 453 Pt at pre-maintenance to 107 pt at post-maintenance. Among raw and subsidiary materials, remicon, stone-netting bag, and pebbles were showing heavy environmental load in the order. Evironmental impact of input material into water system was analyzed from 1,827 Pt environmental load before construction to 1,080 Pt of post-maintenance, and damage indicator was improved at 747 Pt. Water quality was improved from 1,827 Pt (before construction) to 1,080 Pt(after construction), and ecosystem was improved after maintenance. Environmental indicator in ecosystem was analyzed 427 Pt(before construction) to 348 Pt(after construction), and damage indicator of Sumnjingang riverine system was improved as much as 79 Pt. In the conclusion, estuarine environmental monitoring through LCA in the area of facility, input material into water and ecosystem showed that close-to-nature stream was 1,172 Pt better than artificial stream in environmental aspects.

주조공정 설비에 대한 실시간 모니터링을 통한 불량예측에 대한 연구 (A Study on Defect Prediction through Real-time Monitoring of Die-Casting Process Equipment)

  • 박철순;김흥섭
    • 산업경영시스템학회지
    • /
    • 제45권4호
    • /
    • pp.157-166
    • /
    • 2022
  • In the case of a die-casting process, defects that are difficult to confirm by visual inspection, such as shrinkage bubbles, may occur due to an error in maintaining a vacuum state. Since these casting defects are discovered during post-processing operations such as heat treatment or finishing work, they cannot be taken in advance at the casting time, which can cause a large number of defects. In this study, we propose an approach that can predict the occurrence of casting defects by defect type using machine learning technology based on casting parameter data collected from equipment in the die casting process in real time. Die-casting parameter data can basically be collected through the casting equipment controller. In order to perform classification analysis for predicting defects by defect type, labeling of casting parameters must be performed. In this study, first, the defective data set is separated by performing the primary clustering based on the total defect rate obtained during the post-processing. Second, the secondary cluster analysis is performed using the defect rate by type for the separated defect data set, and the labeling task is performed by defect type using the cluster analysis result. Finally, a classification learning model is created by collecting the entire labeled data set, and a real-time monitoring system for defect prediction using LabView and Python was implemented. When a defect is predicted, notification is performed so that the operator can cope with it, such as displaying on the monitoring screen and alarm notification.

윤축의 소음 및 진동과 고속선 궤도불규칙간의 관계에 대한 기초연구 (A Relationship between the Noise and Vibration of a Wheelset and the Irregularity of a High-speed Railway: A Preliminary Research)

  • 이준석;최성훈;김상수;박춘수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집 특별세미나,특별/일반세션
    • /
    • pp.409-417
    • /
    • 2009
  • This paper is focused on a relationship between the noise and vibration of a wheelset and the railway irregularity of a high speed railway using a time-varying frequency transform for a preliminary research of the railway condition monitoring by an in-service high-speed railway vehicle. Generally, the monitoring has been performed by a special railway inspection vehicle or industrial engineers for railway maintenance. However, they have been limited at night due to the in-service high-speed railway vehicles, and too slow to monitor all of the section. To solve this problem, the monitoring should be performed by an in-service high-speed railway vehicle. For the research, the noise and vibration of a wheelset are utilized, because they are closely related to the railway condition. They are measured by using some microphones and accelerometers, and stored in an on-board data acquisition system. The signals are post-processed by a time-varying frequency analysis and compared with the result of a railway geometry and profile measurement system. From the comparison, it is able to observe the relationship between the noise and vibration of a wheelset and the irregularity of a high-speed railway. Also, some distinct frequency components are observed, which are not observed in the railway geometry and profile.

  • PDF

내진성능평가에 따른 정밀안전진단 및 내진 보수보강 조치의 개선방안 연구 (A study on the improvement plan for precision safety diagnosis and seismic repair and reinforcement measures according to seismic performance evaluation)

  • 김장욱
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.87-88
    • /
    • 2022
  • For an earthquake-safe urban environment, the Republic of Korea conducts seismic performance evaluation in accordance with laws and guidelines to assign safety ratings and implement necessary management measures such as repairs and reinforcements. In the seismic performance evaluation result, structures lacking in preparation for earthquakes are prioritized and classified into measures such as repair, reinforcement, or careful observation to respond to physical risks such as earthquakes. Such repair and reinforcement work is not a one-time thing, but it is necessary to further enhance the effect through continuous follow-up observation. In this study, the location of the vertical and horizontal displacement measuring part of the construction part is displayed so that the post-construction status of the reinforcement construction part can be visually checked by identifying the problems in the process of post-monitoring in 2022 for the maintenance and reinforcement work of local governments' public facilities carried out in 2021. We propose a plan to institutionalize the installation of, inspection tools, and crack gauges at certain locations in the construction department, and to have facility managers periodically inspect and manage them with a smartphone program or the 'Facility Autonomous Safety Inspection' app.

  • PDF

The reason of cracking in bottom gallery of SefidRud Buttress Dam and earthquake and post earthquake performance

  • Mirzabozorg, Hasan;Ghaemian, Mohsen;Roohezamin, Amirhossein
    • Structural Monitoring and Maintenance
    • /
    • 제6권2호
    • /
    • pp.103-124
    • /
    • 2019
  • Present study concerns the safety evaluation of SefidRud dam's block No. 18 regarding probable crack propagation in the foundation gallery under a MCE record. Accordingly, a 3D finite element model of the block in companion with the reservoir and the foundation is modeled. All the associated thermal and structural parameters are derived via calibration with the records of thermometers and pendulums installed inside the dam body. The origination of the cracks and their whereabouts are determined by primary thermal and static analyses and through a linear dynamic analysis the potential failure zone and their extent and level are studied. The foundation gallery is the most probable zone among the other intensive tensile stress area to compromise the dam stability. Therefore, the nonlinear analysis of this risky region is inevitable. The results depict the permissible expansion of the cracks inside the gallery even under another future earthquake in MCE level. As a consequence, the general dam performance is assessed safe in spite of the seepage flow rate growth from the gallery fractures.