When we conduct environmental impact assessment, main contents consist of summary, project outline, environmental conditions, environmental impacts due to the project, mitigation devices, and alternative measures of harmful impact on environment. In this Paper, to understand how they really conduct air quality impact assessment and prediction and examine their effectiveness, we considered the provisions and actual case of environmental impact assessment in Korea with that in Japan. As a result, we propose a method of improving air quality impact assessment and Prediction, such as reflection of the result in environmental impact assessment, detailed assessment focused on relatively important environmental impact elements, field measurement investigation over four season and seven sucessive days, the uniformity of units, the proper model development to predict environmental concentration and a biennial environmental impact assessment for ex post management.
Kim, Gui-Young;Lee, Dae-In;Eom, Ki-Hyuk;Jeon, Kyeong-Am;Kang, Sung-Kyung
Journal of the Korean Society for Marine Environment & Energy
/
v.16
no.2
/
pp.121-129
/
2013
This study investigated the status and problems of the post-project environmental management for development projects and suggested improvements of the system to achieve effectiveness for the system of the sea area utilization consultation. The post-project environmental management has had several problems such as the neglect of implementations and checks for the consultation items, the lack of actions and notifications of results, the absence of awareness and expertise of the post-project environmental management. In addition, although it is very important to verify results of actual change and modelling of marine environment before and after the projects, the marine environmental monitoring and assessment have been perfunctorily carried out. Thus, for the improvements of the post-project environmental management to the system of the sea area utilization consultation, it is extremely necessary for related stakeholders to raise awareness of the post management and implement it faithfully, and establish the post management system for conflict resolution and enforce sanctions and accountability against executory items. Furthermore, it should establish systematic monitoring system of marine environmental impact survey.
Environmental Impact Assessment is composed of screening, scoping, inventory survey, prediction, assessment, alternative assessment, mitigation measure, and post management. Environmental monitoring data is applied to EIA process such as prediction and post management. It must he collected and managed systematically for effective applying in EIA process. This article explains factors such as air quality, water quality, soil, ocean, odor, noise & vibration, ecosystem, etc. and organizations of environmental monitoring managed by Ministry of Environment.
Environmental Impact Assessment (EIA) is composed of various procedures, such as screening, scoping, inventory survey, prediction, assessment, alternative assessment, mitigation measures, and post management. Environmental monitoring data for air quality or water quality, etc. is applied in the EIA process, especially in prediction and post management. As an effective tool of environmental monitoring, the remote sensing method, introduced recently, was used in collecting nationwide data concerning ecosystem and land use. This article explains the current monitoring status in Korea. Monitoring factors include air quality, water quality, soil, ocean, odor, noise, and ecosystems. This report explains the organization of the environmental monitoring system managed by the Ministry of Environment in Korea. Furthermore, it shows the environmental criteria and environmental policies applied to EIA in Korea.
In this study, we used marine environment assessment indices to evaluate impacts of various development projects on the marine environment. TheWaterQuality Index (WQI) was applied in the field of marine water quality and the Cleanup Index of Harmful Chemicals (CIHC), the Cleanup Index of Eutrophication (CIET), the Enrichment Factor(EF) were used in the field of marine sediment. In the field of marine benthic organisms, the Benthic Health Index (BHI) and the Benthic Pollution Index (BPI) were utilized. Each assessment index was calculated using the data observed in the development project, and its characteristics and usefulness were evaluated. The assessment method and criteria were clearly defined for WQI, CIHC, and BHI. Furthermore, through these indices, an integrated environment impact analysis was possible. Apart from the indices presented in this study, there are various indices that can be used for evaluating the marine environment. Therefore, it is important to utilize appropriate indices according to the characteristics of each project.
The need for improvement is raised due to limitations with environmental impact assessment, and the importance for data-based environmental impact assessment is increasing. In this study, data demand was derived by analyzing Agreed Terms and Conditions in the Water Environment field (Water Quality, Hydraulic & Hydrologic Conditions, and Marine Environment) of environmental impact assessment. Agreed Terms and Conditions on environmental impact assessment in the water environment field were classified and categorized by environmental impact assessment stage (addition to status survey, impact prediction and evaluation, establishment of reduction measures, post-environmental impact survey), and data demand for each type of consultation opinion was linked. As a result of the categorization of Agreed Terms and Conditions, it was classified into 18 types in the water quality, 15 types in the hydraulic & hydrologic conditions, and 17 types in the marine environment. As a result of linking data demand, the total number of data demand was 236 in the water quality, 98 in the hydraulic & hydrologic conditions, and 73 in the marine environment. The highest number of Agreed Terms and Conditions and data demands were found in the water quality for the evaluation item and establishment of reduction measures, specifically establishment of non-point source pollution reduction measures, for the stage. The numbers were judged to be linked to the relative importance of the items and the primary purpose of environmental impact assessment. The derivation of data demand through the analysis of Agreed Terms and Conditions in the environmental impact assessment can contribute to the advancement of the preparation of environmental impact assessment reports and is expected to increase data utilization by various decision-makers by establishing a systematic database.
Lee, Dae In;Kim, Gui Young;Tac, Dae Ho;Yi, Yong Min;Choi, Jin Hyu;Kim, Hye Jin;Lee, Ji Hye;Yoon, Sung Soon
Journal of the Korean Society for Marine Environment & Energy
/
v.18
no.3
/
pp.179-188
/
2015
This study reviewed the type of the project and developmental plan related to ocean energy development in the coastal land boundaries and the ocean, and suggested the efficient scoping method through the diagnosis of the key items of environmental impact assessment (EIA) in the coastal area. The major projects are the construction of tidal power plant, tidal current power plant, and offshore wind power plant in the public water, and also those are the construction of solar power plants in the coastal land boundaries. While the project plans on a large scale such as the construction of tidal power plant, it is important to consider both property of usefulness of the designated areas and harmony analysis with marine space availability based on the adequacy of the site selection and relevance of plan with the master plan for reclamation and strategic environmental assessment (SEA). And also it needs to be considered the careful checkup on the EIA checklist referring to the type of project, effective post-monitoring, and suggestion of mitigating methods to minimize the environmental impacts during the stage of actual environmental impact assessment. Introduction of a system of integrated marine environmental impact assessment should be considered for reasonable and effective manage to developmental projects on the marine spatial area.
Journal of the Korean Society of Environmental Restoration Technology
/
v.22
no.6
/
pp.63-76
/
2019
UAVs are unmanned, autonomous or remotely piloted aircraft. As UAVs become smaller, lighter and more economical, their applications continue to expand. Researches on UAVs in the field of remote sensing show development methods and purposes similar to those on satellite images, and they are widely used in studies such as 3D image composition and monitoring. In the field of environmental impact assessment(EIA), satellite information and data are mainly used. However, only low-resolution images covering long distances and large-scale data allowing for rough examination are being provided, so their uses are seriously limited. Therefore, in this paper, we construct spatial information of forest area by using unmanned aerial vehicle and seek efficient utilization and policy improvement in the field of environmental impact assessment. As a result, high-resolution images and data from UAVs can be used to identify the location status of SEIA, EIA, and small scale EIA project plans and to evaluate detailed environmental impact analysis. In addition, when provided together with infographics about Post-environmental impact investigation, it was confirmed that the possibility of periodic spatial information construction and evaluation can be used throughout the entire project contents and project post-process.In order to provide sophisticated infographics for the EIA, drone photography and GCP surveying methods were derived.The results of this study will be used as a basis for improving high-resolution monitoring and environmental impact assessment in the forest sector.
Muju Resort Development environmental impact statement(EIS) in Mt. Teogyu National Park are evaluated with the results of post-environmental evaluation. Three EIA items (ecosystem, hydrology, landuse) are investigated. In terms of ecosystem and hydrology, the environment during construction period was compared with post-construction and it was also true of hydrology section. The land use surrounding the resort area have been changed seriously, and the wildlife in large patch are endangered with the fragmentation by road and resort construction. The three items in the Muju Resort EIS was not assessed properly. So, in order to assess properly accurate data, appropriate approach, and periodical post evaluation are required.
Post-Environmental impact investigation(Post-EII) plays an important role in investigating and reducing the environmental impacts of construction operations in South Korea. To date, it has been estimated that the results for Post-EII showed the low reliability; however, understanding those reliability has rarely been studied. We investigated the effect on water qualities by construction operations of the quarry mine, training center, and golf club in South Korea. In addition, the results of water quality analysis in this study were compared and analyzed with those in Post-EII. Treated wastewater in a quarry mine showed high concentrations of biochemical oxygen demand(BOD), suspended solid(SS), total nitrogen(T-N), and total phosphorus(T-P). Compared with the water quality results between this study and Post-EII, the concentrations of BOD, SS, T-N, and T-P in the treated wastewater were higher than the interquartile range(IQR) as well as the range of the results from minimum to maximum in Post-EII(p<0.05). The concentrations of BOD, SS, T-N, and T-P in treated wastewater were high under constructions in a training center. The concentrations of BOD and SS exceeded the consultation standard for the treated wastewater. These concentrations showed the significant difference with the IQR and the range from minimum to maximum of the water quality results in Post-EII(p<0.05). Therefore, the management and monitoring for water quality should be conducted in the treated wastewater by of construction operations. In addition, the alternative to enhance the reliability for the water quality results should be sought in Post-EII.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.