• Title/Summary/Keyword: Pond water

Search Result 437, Processing Time 0.025 seconds

Pond System for Further Polishing of Constructed Wetland Effluent during Winter Season (연못을 이용한 동절기 인공습지 오수처리수의 추가 처리)

  • Yoon, Chun-Gyeong;Jeon, Ji-Hong;Kim, Min-Hee;Ham, Jong-Hwa
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.44 no.4
    • /
    • pp.139-148
    • /
    • 2002
  • Pilot study was performed to examine the feasibility of the pond system for further polishing of treatment wetland effluent from December 2000 to June 2001. The wetland system used for the experiment was highly effective to treat the sewage during the growing season, but it was less effective and its effluent was still high to discharge to the receiving water body. Therefore, the wetland effluent may need further treatment to prevent water quality degradation. Pond system could be used to hold and further polish the wetland effluent during the winter season and ots feasibility was evaluated in this study. Additional water quality improvement was apparent in the pond system during winter season, and the pond effluent could be good enough to meet the effluent water quality standards if it is properly managed. Timing of the pond effluent discharge appears to be critical for pond system management because it is a closed system and whole water quality constituents are affected by physical, chemical, and biological pond environments. Once algae started to grow in mid-April, constituents in the pond water column interact each other actively and its control becomes more complicated. Therefore, upper layer of the pond water column which is clearer than the lower layer my need be discharged in March right after ice cover melted. In the experiment, water quality of the upper water column was markedly clear in March than ant other times probably because of freezing-thawing effect. The remaining lower water column could be further treated by natural purification as temperature goes up or diluted with better quality of wetland effluent for appropriate water uses. This study demonstrated the feasibility of pond system for subsequent management of wetland effluent during the winter season, however, more study is needed for field application.

A Study on the Effect of Water Quality Improvement of a Storm Sewage by Detention Pond (저류지에 의한 우수의 수질개선 효과 연구)

  • Lee, Jong-Tae;Song, Chi-Heung;Gang, Tae-Ho
    • Journal of Korea Water Resources Association
    • /
    • v.33 no.3
    • /
    • pp.351-364
    • /
    • 2000
  • The effect of water quality improvement of combined sewage by detention pond has been studied. It is convinced that the pollutant load and peak flow through the combined sewer by first rainfall and runoff can be decreased by detention pond sited at the outlet of small basin. Hydraulic modeling of detention panel was performed for two cases of sedimentation pond and gravel contact pond. It has been recognized that it is more efficient to reduce the pollutant of combined sewage when the combined sewage is released alter a fixed detention time in the detention pond than it is released continuously without detention time. The gravel contact detention pond shows higher pollutant removal rate than the sedimentation detention pond in all pollutants. When it comes to gravel contact detention pond, the gravel pond filled with crushed gravel has a higher pollutant removal rate than that filled with river gravel.

  • PDF

Water-Proof Technology for Water Hazard in Golf Course in Korea (국내 골프장 연못의 방수기술)

  • Kim Won-Jo;Lee In-Hwan;Lee Jae-Pil;Kim Doo-Hwan
    • Asian Journal of Turfgrass Science
    • /
    • v.18 no.2
    • /
    • pp.77-95
    • /
    • 2004
  • This study was conducted to find out definition, specification and characteristics of water-proof method for pond at golf courses that located in the mountain in Korea. Water-proof method of pond was selected by location, kind of soil, area, depth, cost, construction period and so on. 1. Soil Bentonite Sealing Liner(SBL) is to mix soil with a good quality bentonite. Then the mixed material was dressed on the bottom of pond. $\\$Merit of SBL is to purify the water and planting is possible. It can also reduce construction period and is economical. It's easy to find out the leak points. Demerit of SBL is expensive, if good quality soil is not in constructing site. Shape of pond edge is simple. 2. Ethylen Propylene Diene Monomer Sheef(EPDM-Sheet) makes use of sheet that resists to acid and alkaline. EPDM-Sheet spreads out as a mat on the pond for water-proof. Merit of EPDM-Sheet is to perfectly prove water and make a diverse shape of pond edge. Demerit of EPDM-Sheet is not friendly to environment. It needs drain system, air ventilation and long period of construction. It is also difficult to find out leaking points in this method. 3. Water proof of ESS-13 uses ESS-13 that is resin of vegetable matter and friendly to environment. To prove water of pond, ESS-13 is delicate with water in the pond. After that, Ess-13 in the water is expanded at pore space in the soil and cover with soil. ESS-13 can be to prove a leaking pond in golf course under business. ESS-13 is cheap and it needs short construction period. It does not need to switch the old water-proof system, additionally. It needs to move fishes to other place before utilizing ESS-13.

A Case Study on Development of Stormwater Retention and Infiltration Pond System (우수저류 및 침투연못 시스템개발 사례연구 - 우수 저류 및 침투 효과를 중심으로 -)

  • Lee, Jae Chul;Yoon, Yeo Jin
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.6 no.4
    • /
    • pp.52-61
    • /
    • 2003
  • This study was carried out to analyze the effects of stormwater retention and infiltration pond on reduction of flood peak and volume in a experimentally developed ecological pond. The experimental site has 542$m^2$ watershed area, 1,310mm yearly-averaged rainfall. And the area of the retention pond is 60$m^2$, the maximum water depth is 0.5m, the maximum and average storage is 15$m^3$and 9.3$m^3$d. And the area of infiltration pond is 58$m^2$, and the water depth varies 0.2m~0.5m. The monitoring system consists of one rainfall gage, one Parshall flume and acoustic water level gage, two rectangular weirs and acoustic water level gage for discharge gaging, and one data recording unit. Data from ten storm events in total, three storm events in year 2000 and seven storm events in year 2001, were collected. From the data the evaporation rate was achieved with the water balance equation, and the result shows 5.0mm/day in average. The result from the analysis of the effects on reduction of flood peak and volume, is that 14% reduction of flood volume and 15% reduction of flood peak in retention pond and 49% reduction of flood volume in infiltration pond.

Waste Water Treatment Using Constructed Wetland and Pond System (인공습지와 연못시스템을 이용한 오수처리)

  • Kim, Min-Hee;Yoon, Chun-Gyeong;Ham, Jong-Hwa
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2001.10a
    • /
    • pp.470-474
    • /
    • 2001
  • A pilot study was performed at the experimental field of Konkuk University in Seoul, to examine the waste water treatment using constructed wetland and pond system. The effluent of the wetland system in winter often exceeded effluent water quality standards for sewage treatment plant, therefore, pond system could be applied to additional system. As a result, removal rate of $BOD_{5}$, SS was 84.4%, 81.5% and effluent concentration was 4.6mg/L and 5.0mg/L respectively, when surface water of pond system was discharged in March. So we concluded that pond system stored wetland effluent in winter and discharged surface water of pond system in March, so met water quality standard.

  • PDF

Preferred Feeding Sites and Prey of the Adult Gold-spotted Pond Frog, Rana plancyi chosenica

  • Eom, Jun-Ho;Lee, Jung-Hyun;Ra, Nam-Yong;Park, Dae-Sik
    • Journal of Ecology and Environment
    • /
    • v.30 no.4
    • /
    • pp.357-361
    • /
    • 2007
  • To determine the feeding sites preferred by adult gold-spotted pond frogs, Rana plancyi chosenica, and the foods that induce favorable growth of the frogs in the laboratory, we conducted two separate experiments between 27 May and 12 July 2007 in a vivarium. In the first experiment, we counted the number of crickets eaten by four gold-spotted pond frogs in a 60 min period at four different feeding sites within the experimental arenas: on the water surface, at the edge of a pond, and at two terrestrial sites. Adult gold-spotted pond frogs ate more crickets on the water surface and at the edge of the pond than the terrestrial sites. In the second experiment, we measured the growth of SVL (snout-vent length) and body mass of adult gold-spotted pond frogs fed crickets, mealworms, maggots, or earthworms in individual experimental boxes over a one month period. The SVL and body mass of the adult gold-spotted pond frogs fed crickets, mealworms, or maggots were greater than those of the frogs that were fed earthworms. These results indicate that providing crickets, mealworms, or maggots on the water or at the edge of a pond should induce favorable growth of captive-reared adult gold-spotted pond frogs.

Treatment Level and Reactions of a Treatment Pond System Purifying Sinyang Stream Water (신양천 하천수정화 연못시스템의 처리수준 및 연못반응)

  • Yang, Hongmo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.8 no.6
    • /
    • pp.1-12
    • /
    • 2005
  • Treatment level and pond reactions of a pond system were examined from May to October 2002. The system was constructed in July 2000 for purifying water of Sinyang stream that flows into Koheung Estuarine Lake located in the southern part of the Korean Peninsula. The system was composed of a primary and a secondary pond in series and established on the rice field near the lake. Water pumped from the stream was funneled into the primary pond, whose effluent was discharged into the secondary pond by gravity flow. Effluent from the secondary pond was funneled into wetlands. About 130 $m^3$/day of water was pumped into the primary pond and detention time of the primary and secondary pond was about 2 days. DO from the surface to the 1.0 m depth of the primary and secondary pond was in the rage of 5.2 to 11.0 mg/L and 4.3 to 0.7 mg/L, respectively. DO at the bottom layer of the primary pond was 0 mg/L and that of the secondary pond ranged 3.0~4.7 mg/L. The primary pond functioned as a facultative pond and the secondary as an aerobic one. The temperature difference between the surface and bottom layers of the ponds in August was about $2.5^{\circ}C$ and that in May and October was about $1.0^{\circ}C$. Thermocline was observed in the primary pond during the high ambient temperature of August. The sludge depth of the primary pond in May, August, and October was 2.4, 1.9, and 2.2 cm, respectively. That of the secondary pond was 1.2, 1.0, and 1.1 cm, respectively. SS, $BOD_5$, T-N, and T-P concentrations in influent averaged 16.64, 6.71, 6.21, and 0.23 mg/L and those in effluent from the primary pond averaged 11.48, 4.97, 4.81, and 0.17 mg/L, respectively. The removal rates of the primary pond for SS, $BOD_5$, T-N and T-P were 31%, 26%, 22%, and 24%, respectively. Average concentrations of SS, $BOD_5$, T-N, and T-P in effluent from the secondary pond were 9.81, 4.07, 4.03, and 0.14 mg/L, respectively and the abatement rates of the secondary pond for SS, $BOD_5$, T-N and T-P were 20%, 12%, 13%, and 15%, respectively. SS, $BOD_5$, T-N and T-P concentrations in effluent from the primary pond were significantly low(p=0.001) when compared with those from the secondary one.

Application of Biological Activated Carbon Process for Water Quality Improvement of Stagnant Stream Channels

  • Lee, Jae-Ho;Park, Jeung-Jin;Park, Tae-Joo;Byun, Im-Gyu
    • Environmental Engineering Research
    • /
    • v.19 no.4
    • /
    • pp.309-316
    • /
    • 2014
  • The water quality improvement of golf course ponds, as representative stagnant stream channels, was evaluated by applying a biological activated carbon (BAC) process composed of four consecutive activated carbon reactors. The study was performed from autumn to winter in order to evaluate the feasibility of the BAC process under low temperature conditions. In the study, water quality of pond A (target pond) and pond B (reference pond) were monitored. Pond water was pumped into the BAC process, and was then returned to the pond after treatment. The optimal conditions were determined to be 2 hr of empty bed contact time (EBCT) at a temperature above $4^{\circ}C$, in which improvements of chemical oxygen demand (COD), total nitrogen (TN) and total phosphorus (TP) of pond A compared to pond B were 3.62%, 3.48% and 1.81%, respectively. On the other hand, as the temperature was below $4^{\circ}C$, some degree of water quality improvement was achieved even when EBCT were 1 or 0.5 hr, suggesting that the BAC process can be successfully applied for the improvement of pond water quality in winter months. The values of biomass concentration and microorganism activity in each condition were highest where 2 hr of EBCT was applied at a temperature above $4^{\circ}C$, but values were similar throughout all treatment conditions, and thus, adsorption is considered to be the dominant factor affecting process efficiency. From the denaturing gel gradient electrophoresis (DGGE) results, no significant differences were observed among the activated carbon reactors, suggesting that the number of reactors in the system could be decreased for a more compact application of the system.

Effect of Probiotics on Water Quality in the Shrimp (Fenneropenaeus chinensis) Ponds (대하 (Fenneropenaeus chinensis) 양식장 사육수에 미치는 Probiotics의 효과)

  • LIM Hyun Jeong;PARK Joong Hyun;JANG In Kwon
    • Korean Journal of Fisheries and Aquatic Sciences
    • /
    • v.37 no.2
    • /
    • pp.91-97
    • /
    • 2004
  • Applications of probiotics to shrimp ponds were carried out to determine their effects on water quality. Fermented solutions consisting of Bacillus spp. and Nitrosomonas spp. were applied to a 4 ha shrimp (Fenneropenaeus chinensis) pond from July to September, 2000. In the pond treated with probiotics, daily variations of DO and pH, and concentrations of DIN and DIP were lower than those in the ponds without probiotic treatment. Concentration of phytoplankton was less variable and the number of species was more variable in the probiotic-treated pond than those in the control pond. Variation of bacterial numbers and the number of Vibrio spp. were lower in the treated pond than those in the control pond. It is confirmed that the probiotics can be used to improve water quality of the shrimp ponds.

Effect of Phosphorus Supplemented Diet on Water Quality of Catfish Pond

  • Lee, Jeong-Yeol;Boyd, Claude-E.
    • Journal of Aquaculture
    • /
    • v.14 no.2
    • /
    • pp.67-71
    • /
    • 2001
  • Phosphorus is an essential element for growth and metabolism in fish. However high levels of phosphorus in the feed can lead to poor water quality of pond, and can also be a potential source of pollution, when pond water is released to the environment. In this study phosphorus supplemented diets containing 0.0, 0.9 or 1.9% of (dicalcium) phosphate were offered to channel catfish and changes in water quality of ponds and phosphorus levels in fish were measured. Higher level of (1.9%) supplementation of phosphorus in diet resulted in higher concentration of T-P and SRP in pond waters. Also it produced negative effects on fish production by lowering feed coefficient and rate of increment in body weight. Surplus phosphorus can affect fish growth and water quality of pond.

  • PDF