• Title/Summary/Keyword: Pollution Load Reduction

Search Result 150, Processing Time 0.027 seconds

Determination of Interception Flow by Pollution Load Budget Analysis in Combined Sewer Watershed (II) - Establishment of Intercepting Capacity and Reduction Goal of Overflow Pollution Load - (오염부하 물질수지 분석을 통한 합류식 하수관거 적정 차집용량 결정(II) - 차집용량과 월류오염부하 삭감목표 설정 -)

  • Lee, Doojin;Shin, EungBai
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.19 no.5
    • /
    • pp.557-564
    • /
    • 2005
  • The objective of this study is to evaluate a criteria of intercepting capacity and a reduction goal of overflow pollution load in combined sewer system. In the current criteria of intercepting capacity in the domestic sewage facility standard, it is known that three times of peak sewage (Q) in dry period or runoff flow by 2mm/hr is not appropriate since the intercepted flow is estimated by runoff and show different result even in the same watershed. Though a reduction goal of overflow pollution load can be determined from 1) same level of storm-water runoff pollution load in separated storm sewer, 2) less than 5% sewage load in dry weather period, by the domestic sewage facility standard, the simulated results from storm-water model show large differences between two criteria. While it is predicted that sewage pollution load standard three time larger than separated storm sewer standard in high population density and urbanized area, it is shown that separate storm sewer standard larger than sewage pollution load standard in middle population density and developing area. Accordingly, it is proposed that more reasonable intercepting flow and reduction goal of overflows pollution load should be established to minimize discharging pollution load in combined sewer systems. For the purpose, a resonable standard has to be amended by pollution load balance considering the characteristics of a watershed for generation, collection, treatment, and discharging flow.

Excessive State of Pollutant Load Allocation and Penalty Application Schemes based on Pollutant Reduction Plan Types for Solving Excessive Problem of Allocation (오염할당부하량의 초과현황 및 초과해소를 위한 삭감계획 유형에 따른 페널티 적용방안)

  • Park, Jae Hong;Park, Bae Kyoung;Oh, Seung Young;Hwang, Ha Sun;Lee, Jae Kwan
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.1
    • /
    • pp.66-73
    • /
    • 2013
  • Total Maximum Daily Loads (TMDLs) system was introduced to manage pollution load of watershed and to improve water quality of unit watershed so that it is possible to protect dringking water soureces. Load allocation observation is the most important factor in TMDLs system. Because if load allocation is not observed, it is difficult to achieve water quality goal of unit watershed. Also it is impossible to improve water quality of the drinking water sources. Therefore it is necessary to apply some kind of sanctions (penalty) in case of excess of load allocation. The sanctions have to be, however, applied differently based on various reduction plan types, i.e., using the reduction load planed in 2nd phase, delay the completion, additional reduction in 2nd phase, error of the pollution sources, etc. Moreover, the penalty load should be properly imposed, lest it should be overburden the provence. The reduction load trade inter province must be restrictively permmitted only the same unit watershed.

Characterization on the Pollution Discharge Load at the Unit Watershed for the Management of Total Maximum Daily Loads - in Guem River Basin (수질오염총량관리 단위유역별 오염물질 배출부하량 특성분석 - 금강수계를 대상으로)

  • Park, Jun Dae;Choi, Ok Youn;Oh, Seung Young
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.6
    • /
    • pp.786-795
    • /
    • 2012
  • Water quality management should be focused on the pollution concentrated area so that the improvement of water quality can be achieved effectively for the management of Total Maximum Daily Loads (TMDLs). It is necessary to consider discharge characteristics in the TMDL plan. This study analysed discharge characteristics such as pollution generation and discharge load density, and reduction potential by each unit watershed, and categorized the unit watershed into four groups according to its discharge load characteristics. This analysis can be used as helpful information for the prioritization of pollution reduction area and selection of pollution reduction measures in the development of TMDL plans.

A Study on the Allocation of Permissible Water Pollution Load in the Total Water Pollution Load Management Plan (수질오염 총량관리계획과정의 오염부하량 할당에 관한 연구 - 경기도 광주시를 사례로 -)

  • Kim, Sie-Heon;Rim, Jay-Myung
    • Journal of Environmental Impact Assessment
    • /
    • v.14 no.5
    • /
    • pp.337-346
    • /
    • 2005
  • Pollution load allocation can likely be much controversial, which is essential to formulate the total water pollution load management plan. Existing rules(or guidances) in Korea, can provide no specific criteria for load allocation. Therefore, this paper studied(comprehensively) possible standards how or why to choose any particular allocation method, which was applied in the Gwangju City's load allocation for the satisfaction of set water quality goal. This load allocation is basically focused on the load reduction of domestic wastewater rather than industrial wastewater, because the land-use is strictly regulated and larger sources of pollution are few in the Gwangju City. This paper recommends the city to increase the capacity of sewage treatment plants, promote sewerage maintenance, and set higher effluent standards.

A Study on the Activation of Non-government Participation in Total Maximum Daily Load System using Private Discharge Facilities Reduction Potential Analysis (개별배출시설 삭감잠재량 분석을 통한 수질오염총량제의 민간참여 활성화 방안 연구)

  • Kim, Hongtae;Shin, Dongseok;Kim, Hyeonjeong;Choi, Inuk;Lee, Miseon;Kim, Yongseok
    • Journal of Korean Society on Water Environment
    • /
    • v.31 no.6
    • /
    • pp.715-722
    • /
    • 2015
  • Four major river basin in Korea has been managed with Total Maximum Daily Load(TMDL) System. Water quality indicators as targeted pollutants for TMDL were BOD and TP. In order to satisfy water quality criteria, government allocation using public treatment facilities and its action plan has been used. However, the role to improve water quality were recently faced to its limitation. It is time to require the role of non-government allocation in private discharge facilities to control good water quality. This study investigated three different scenarios in reduction demands of non-government allocations about industry and private sewages. The three different scenarios were discharge under 1) legal water quality standard, 2) water quality level in 2011 and 3) current water quality level with maximum value in group. The results showed that reduction potential in water discharge for TP indicator was 1,118kg/day, under second scenario with 20% of deduction. This results arrived at 42% of whole reduction potential costs and 0.012mg/L improvement in water quality. In conclusion, to intrigue voluntary participation in non-government allocation, various benefits such as tax reduction, tax exemption, and water quality trading should be provided.

Identifying Priority Area for Nonpoint Source Pollution Management and Setting up Load Reduction Goals using the Load Duration Curve (부하지속곡선을 이용한 비점오염원 우선관리 지역 선정 및 관리목표 설정 연구)

  • Jang, Sun Sook;Ji, Hyun Seo;Kim, Hak Kwan
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.5
    • /
    • pp.17-27
    • /
    • 2018
  • The objective of this study is to identify the priority area where the nonpoint source pollution (NPS) management is required and to set up the load reduction goals for the identified priority area. In this study, the load duration curve (LDC) was first developed using the flow and water quality data observed at 286 monitoring stations. Based on the developed LDC, the priority area for the NPS pollution management was determined using a three-step method. The 24 watersheds were finally identified as the priority areas for the NPS pollution management. The water quality parameters of concern in the priority areas were the total phosphorus or chemical oxygen demand. The load reduction goals, which were calculated as the percent reduction from current loading levels needed to meet target water quality, ranged from 67.9% to 97.2% during high flows and from 40.3% to 69.5% during moist conditions, respectively. The results from this study will help to identify critical watersheds for NPS program planning purposes. In addition, the process used in this study can be effectively applied to identify the pollutant of concern as well as the load reduction target.

A Comparison Between Reduction Methods for BOD Loadings to Achieve Water Quality Standards at the End of the Yeongsan River (영산강 하류부의 목표수질 달성을 위한 BOD 부하량 삭감방법의 비교)

  • 황대호;정효준;이홍근
    • Journal of Environmental Health Sciences
    • /
    • v.27 no.2
    • /
    • pp.119-126
    • /
    • 2001
  • The key point in establishing water quality management measures is how to decide the load reduction for pollution sources. This study was performed to compare reduction methods for BOD loadings to achieve water quality standards at the end of the Yeongsan river. The target year is 2006 and 2011 and reduction methods are uniform treatment and treatment by influence rate. Using QUAL2E model, the study was performed under the conditions of establishing and non-establishing the publicly owned treatment works(POTWs). Uniform treatment which allocate the same reduction rate to pollution sources showed that all streams into the river should be applied for the reduction. However, treatment by influence rate which allocate the reduction rate by the order of influence rate showed that achieving target quality might be possible with a few streams for the reduction. But total amount of load reduction of streams was not significantly different from two methods.

  • PDF

Assessing Impact of Reduction of Non-Point Source Pollution by BASINS/HSPF (HSPF를 이용한 비점오염원 삭감에 따른 효과 분석)

  • Bae, Dae-Hye;Ha, Sung-Ryong
    • Journal of Environmental Impact Assessment
    • /
    • v.20 no.1
    • /
    • pp.71-78
    • /
    • 2011
  • This paper aims to assessing impact of reduction of non-point source pollution in the Bokha Stream watershed. The BASINS/HSPF model was calibrated and verified for water flow and water qualities using Total Maximum Daily Load 8days data from 2006 to 2007. Accuracy of the BASINS/HSPF models in simulating hydrology and water quality was compared and there were somewhat differences of statistical results, but water flow and water quality were simulated in good conditions over the study period. The applicability of models was tested to evaluate non-point source control scenarios to response hydrology and water quality in the Bokha stream using various measures which include BMPs approach and change of landuse. The evaluation of reduction of non-point source pollution was developed using load-duration curve. Despite strong reduction of non-point source, there are not satiated target quality at low flow season.

Application of Margin of Safety Considering Regional Characteristics for the Management of Total Maximum Daily Loads (지역특성을 고려한 수질오염총량관리 안전부하량 적용)

  • Park, Jun Dae;Oh, Seung Young;Kim, Yong Seok
    • Journal of Korean Society on Water Environment
    • /
    • v.30 no.3
    • /
    • pp.351-360
    • /
    • 2014
  • The allocation of margin of safety (MOS) at a uniform rate to all areas of the unit watershed makes it very difficult to keep the load allotment stable in the area for lack of reduction measures like forest land. This study developed an equation to calculate margin of safety differentially according to the regional characteristics. The equation was formulated on the basis of the regional characteristic factors such as a load contribution factor for land use type and a site conversion factor for the unit watershed. The load contribution factor represents a contribution of loads from a particular land use. The site conversion factor was derived from the site conversion ratio of a unit watershed. Margin of safety for the non-point pollution load in the land use sector decreased by 20~25% in three river basins. The margin of safety in the unit watersheds with low site occupation ratios decreased in high rate, while in the unit watersheds with large urban area decreased in low rate. With the application of the differential margin of safety considering regional characteristics, not only the reduction of pollution loads can become lighter but also it can be easier to develop plans for Total Maximum Daily Loads (TMDLs) even where the reduction measures are not available.

Analysis of Non-Point Source Pollution Reduction using Water Sensitive Urban Design in Gimhae, South Korea (김해시 물 순환 개선 도시계획에 의한 비점오염물질 저감효과 분석)

  • Jung, Kang-Young;Kim, Shin;Kwon, Hun-Gak;Yang, Duk Seok;Kim, Kyosik;Jang, Kwang-Jin;Shin, Dong-Seok;Ahn, Jung-Min
    • Journal of Environmental Science International
    • /
    • v.25 no.11
    • /
    • pp.1499-1509
    • /
    • 2016
  • This study was performed to analyze the effects of a water circulation green area plan on non-point source pollution in Gimhae South Korea. A quantitative analysis of Arc-GIS data was conducted by applying a watershed model based on Fortran to investigate the changes to direct runoff and pollution load. Results showed that prior to the implementation of the water circulation green area plan in Gimhae, direct runoff was $444.05m^3/year$, total biological oxygen demand (BOD) pollution load was 21,696 kg/year, and total phosphorus (TP) pollution load was 1,743 kg/year. Implementation of the development plan was found to reduce direct runoff by 2.27%, BOD pollution load by 1.16% and TP pollution load by 0.19% annually. The reduction in direct runoff and non-point source pollution were attributed to improvements in the design of impermeable layers within the city.