• Title/Summary/Keyword: Plant risk

Search Result 993, Processing Time 0.025 seconds

Assessment of Environmental Pollution with Tradescantia Bioassays (자주달개비 생물검정 기법을 이용한 환경오염 평가)

  • Kim Jin Gyu;Sin Hae Sik
    • Proceedings of the Korea Society of Environmental Biology Conference
    • /
    • 2004.05a
    • /
    • pp.1-15
    • /
    • 2004
  • Higher plants can be valuable genetic assay systems for monitoring environmental pollutants and evaluating their biological toxicity. Two assays are considered ideal for in situ monitoring and testing of soil, airborne and aqueous mutagenic agents; the Tradescantia stamen hair assay for somatic cell mutations and the Tradescantia micronucleus assay for chromosome aberrations. Both assays can be used for in vivo and in vitro testing of mutagens. Since higher plant systems are now recognized as excellent indicators and have unique advantages over in situ monitoring and screening, higher plant systems could be accepted by regulatory authorities as an alternative first-tier assay system for the detection of possible genetic damages resulting from the pollutants or chemicals used and produced by industrial sectors. It has been concluded that potential mutagen and carcinogen such as the heavy metals among indoor air particulates, volatile compounds in the working places, soil, and water pollutants contribute to the overall health risk. This contribution can be considerable under certain circumstances. It is therefore important to identify the level of genotoxic activity in the environment and to relate it to the biomarkers of a health risk in humans. The results from the higher plant bioassays could make a significant contribution to assessing the risks of pollutants and protecting the public firom agents that can cause mutation anuor cancer. The plant bioassays, which are relatively inexpensive and easy to handle, are recommended for the scientists who are interested in monitoring pollutants and evaluating their environmental toxicity to living organisms.

  • PDF

The Report on the Taxonomic Characters, Ecological Risk and Weed Risk Assessment of Putative Invasive Alien Plants which are Designated in Law by the Ministry of Environment in Korea as Environmentally Harmful Species (III)

  • Kim, Tae-Hee;Yoon, ChangYoung;Kim, Joo-Hwan
    • Korean Journal of Plant Resources
    • /
    • v.34 no.3
    • /
    • pp.223-248
    • /
    • 2021
  • We conducted a taxonomic study and agricultural environmental risk assessments of 41 putative invasive alien plants designated by the Ministry of Environment in 2016. In order to achieve the goal, we carried out the field survey four times including the United States, Australia, and Mexico, and investigated specimens, literature, and other information including seed morphology, classification key, and habitat conditions. In this study, we reported the taxonomic characters, ecological risk, and weed risk assessment of 41 putative invasive alien plants, and suggested significant information about 11 species to contribute to establish solutions of regulation management for putative invasive alien plants - Spirodela punctata (G.Mey.) C.H.Thomps. (Araceae), Sagittaria graminea Michx. (Alismataceae), Elodea nuttallii (Planch.) H.St. John, Hydrocharis morsus-ranae L., Stratiotes aloides L. (Hydrocharitaceae), Eichhornia azurea (Swartz) Kunth, Monochoria hastata (L.) Solms (Pontederiaceae), Aegilops tauschii Coss. (Poaceae), Myriophyllum heterophyllum Michx. (Haloragaceae), Bunias orientalis L. (Brassicaceae), and Heracleum sosnowskyi Manden. (Apiaceae).

FAULT-TREE-BASED RISK ASSESSMENT FOR DYNAMIC CONDITION CHANGES

  • Kang, Hyun-Gook;Jang, Seung-Cheol
    • Nuclear Engineering and Technology
    • /
    • v.39 no.2
    • /
    • pp.123-128
    • /
    • 2007
  • In order to apply a static fault-tree (FT) method to a system or a plant whose configuration changes dynamically, condition gates and a post processing method are used to effectively accommodate these changes. An operator's performance change, which can be caused by these configuration changes, should also be considered to assess the risk to a plant in a more realistic manner. This study aims to develop an integrated framework to accommodate various configuration changes and their effect on an operator’s performance by using the FT model. We applied a condition-based human reliability assessment (CBHRA) method to consider various conditions endured by an operator. That is, we integrated the CBHRA method with the conventional post processing method for modeling the system configuration changes. The effect of the condition monitoring systems installed in a plant is also considered. In this study, we show an example application of the integrated framework to a probabilistic safety assessment for the shutdown phase of a nuclear power plant.

A plant-specific HRA sensitivity analysis considering dynamic operator actions and accident management actions

  • Kancev, Dusko
    • Nuclear Engineering and Technology
    • /
    • v.52 no.9
    • /
    • pp.1983-1989
    • /
    • 2020
  • The human reliability analysis is a method by which, in general terms, the human impact to the safety and risk of a nuclear power plant operation can be modelled, quantified and analysed. It is an indispensable element of the PSA process within the nuclear industry nowadays. The paper herein presents a sensitivity study of the human reliability analysis performed on a real nuclear power plant-specific probabilistic safety assessment model. The analysis is performed on a pre-selected set of post-initiator operator actions. The purpose of the study is to investigate the impact of these operator actions on the plant risk by altering their corresponding human error probabilities in a wide spectrum. The results direct the fact that the future effort should be focused on maintaining the current human reliability level, i.e. not letting it worsen, rather than improving it.

Case Analysis of Risk Assessment for Steel and Iron Works (제철 사업장 위험성평가 사례 분석)

  • Hong, Sung-Man;Park, Peom;Kim, Kwang-Hyoun;Sun, Su-Bin
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.11a
    • /
    • pp.209-221
    • /
    • 2009
  • In the steel industry, steel is manufactured and processed to produce a variety of steel products. The industry provides fundamental materials to the whole range of industries including car, ship, electric appliance and construction industries, so that it is very important as an infrastructure industry. The steel manufacture process involves aerial work, many danger factors caused by the treatment with hazardous gases including BFG and COG and by high pressure gases including H2, O2, N2 and LPG. It requires the management over the large area because many workers work in a plant. The potential dangers in the steel plant were identified and the effect of the danger assessment was verified through the analysis of the danger assessment for the steel plant. The allowed degree of danger was lowered after the improvement through the danger assessment in the plant where the case studies were conducted, which indicates that the danger assessment is highly effective.

  • PDF

Qualitative RBI Analysis in Considered with Uncertain Variables by Probabilistic Distribution (확률분포에 따른 불확실한 변수를 고려한 위험도기반의 정성적 평가)

  • Heo, Ho-Jin;Jeong, Jae-Uk;Kim, Joo-Dong;Choi, Jae-Boong;Choi, Song-Chun;Hwang, In-Ju
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.25 no.2
    • /
    • pp.70-78
    • /
    • 2013
  • Plants which are having conditions of high temperature and pressure always are exposed to danger. In order to prevent unexpected accidents, safety management that can effectively and appropriately examine facilities is required in plant operation. RBI(Risk-Based Inspection) technology in API 581 is one of standard management technique for evaluating risk on petroleum plants. There are qualitative and quantitative assessments in RBI methodology. Quantitative evaluation step is complex and required much information, so high-risk facilities in plant are selected firstly by qualitative method. Qualitative RBI is performed by choosing the answer in prepared questionnaire. However, it is difficult to believe thoroughly results from survey including ambiguous information. In this study, the procedure of qualitative RBI analysis with considering probability distribution concept were proposed by using Monte Carlo simulation method in order to increase reliability in spite of uncertain factors. In addition, qualitative risk of cooling system for LNG plant was evaluated using proposed procedure. Although 20 items of total 39 assessment items are applied to uncertain factors, risk section of high probability(89%) were verified. The detailed results were described in manuscript.

Risk based Value Index Evaluation Model for Modular Design Alternatives in Plant Construction Projects (플랜트 건설사업의 모듈러 설계대안별 RVI 평가 모델)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.98-107
    • /
    • 2022
  • The purpose of this study is to suggest a model for evaluation of a risk based value index for modular design alternatives in plant construction projects. Accordingly, 1) Setting the basic project cost and the scope to apply the module, 2) Evaluating the importance, easiness, and effectiveness index for Engineering, Procurement, Fabrication, transportation, and construction work, 3) Estimating the total project cost by analyzing the risk reserve Step, 4) Comparing the effectiveness index and total project cost for each modular design alternative, it was composed of the steps of deriving RVI. To verify such a model, Plan-A, which applied a module to one process, and Plan-B, which applied a module to three processes, were composed to evaluate RVI.

A Study on the Legal Liabilities of Contractor as a Delay in the Product Delivery on the Offshore Plant Construction Contract (해양플랜트공사계약상 제조물인도지연에 따른 당사자의 법적 책임에 관한 고찰)

  • Jin, Ho-Hyun
    • MARITIME LAW REVIEW
    • /
    • v.29 no.2
    • /
    • pp.115-144
    • /
    • 2017
  • The impact of the global financial crisis, which began in the United States in 2007, had a major impact on the domestic shipping and shipbuilding industries. In this regard, the domestic shipyard has established an order-taking strategy in several ways as an alternative to lowering the amount of construction of commercial vessels due to deterioration of the shipping industry, and selected industrial sector was the offshore plant sector. However, the domestic shipyard has under performed the offshore plant in order to just increase sales and secure work without any risk analysis for EPC contracts. As a result, the shipyard has been charged more than the initial contract price with the offshore plant contractor, or the shipyard has become a legal issue requiring payment of liquidated damages due to delays in delivery of the product. The main legal disputes are caused by the thorough risk analysis and the inexperience of process control that can occur during offshore plant construction. and In particular, there is no sufficient review of the unequivocal provisions in the contract as an element of risk management. There is no human resource to review these contractual clauses. Therefore, this study identifies the existence of specific risks that could lead to delays in offshore plant construction, and examined the existence of any unequivocal clauses in contracts for offshore plant construction. and also discussed how the toxic clause applies to the actual parties and how the concrete risk factors in the construction contracts are transferred and expressed by referring to the interviews with the project manager of the domestic shipyard and the previous research. As a result, This paper examined the legal liability of the contracting parties regarding delayed delivery of the products due to the offshore plant construction contract. And to improve the domestic shipbuilding industry.