Qualitative RBI Analysis in Considered with Uncertain Variables by Probabilistic Distribution |
Heo, Ho-Jin
(Department of Mechanical Engineering, Sungkyunkwan University)
Jeong, Jae-Uk (Department of Mechanical Engineering, Sungkyunkwan University) Kim, Joo-Dong (Department of Mechanical Engineering, Sungkyunkwan University) Choi, Jae-Boong (Department of Mechanical Engineering, Sungkyunkwan University) Choi, Song-Chun (Institute of Gas Safety of Korea Gas Safety Corporation) Hwang, In-Ju (Korea Institute of Construction Technology) |
1 | Jovanovic, A., 2003, Risk-Based Inspection and Maintenance in Power and Process Plants in Europe, Nuclear Engineering and Design, Vol. 226, pp. 165-182. DOI ScienceOn |
2 | Nilsson, F., 2003, Risk-Based Approach to Plant Life Management, Nuclear Engineering and Design, Vol. 221, pp. 293-300. DOI ScienceOn |
3 | Schroder, H. C. and Kauer, R., 2004, Regulatory Requirements Related to Risk-Based Inspection and Maintenance, International Journal of Pressure Vessels and Piping, Vol. 81, pp. 847-854. DOI ScienceOn |
4 | Bareib, J., Buck, P., Matschecko, B., Jovanovic, A., Balos, D., and Perunicic, M., 2004, RIMAP Demonstration Project. Risk-Based Life Management of Piping System in Power Plant Heilbronn, International Journal of Pressure Vessels and Piping, Vol. 81, pp. 807-813. DOI ScienceOn |
5 | Fujiyama, K., Nagai, S., Akikuni, Y., Fujiwara, T., Furuya, K., Matsumoto, S., Takagi, K., and Kawabata, T., 2004, Risk-Based Inspection and Maintenance Systems for Steam Turbines, International Journal of Pressure Vessels and Piping, Vol. 81, pp. 825-835. DOI ScienceOn |
6 | American Petroleum Institute, 2000, Risk-Based Inspection, API Recommended Practice 580 |
7 | American Petroleum Institute, 2000, Risk Based Inspection-Base Resource Document, API p.581 |
8 | Choi, S. C., 2009, Development of RBI for LNG Plant System, Korean Journal of Air-Conditioning and Refrigeration Engineering, Vol. 38, No. 3, pp. 35-44. |
9 | Shin, D. B., 2007, Forecasting Exchange Rates by Monte Carlo Simulation, Industrial Economic Research, Vol. 20, No. 5, pp. 2075-2093. |
10 | Oguamanam, D. C. D., Martin, H. R., and Huissoon, J. P., 1995, On the Application of the Beta Distribution to Gear Damage Analysis, Applied Acoustics, Vol. 45, No. 3, pp. 247-261. DOI ScienceOn |
11 | Palisade, The Decision Tools Suite Add0In for Microsoft Excel manual Version 6.0. |
12 | Yang, Y. M., 2009, The need and promoting direction of gas plant technology development projects, SAREK, Vol. 38, No. 3, pp. 4-12. |
13 | A guide to the project management body of knowledge(PMBOK guide) forth edition, p. 257. |
14 | Shim, S. H., Song, J. S., Kim, J. Y., and Yoon, K. B., 2003, A Study on the Application of RBI Procedure for Petrochemical Plant, Transaction of KSME(A), Vol. 27, No. 3, pp. 416-423. |
15 | Horikawa, H., Yoshikawa, M., and Takasu, N., 2004, Structural Integrity Assessment for Various Failure Modes Using a Risk-Based Maintenance Method, ASME PVP, Vol. 490, pp. 261-270. |