• Title/Summary/Keyword: Plant risk

Search Result 987, Processing Time 0.027 seconds

Risk assessment and variety registration of transgenic crops (형질전환작물의 위해성평가와 품종등록)

  • Lee, Keun-Pyo;Kim, Dong-Hern;Kweon, Soon-Jong;Baek, Hyung-Jin;Ryu, Tae-Hun
    • Journal of Plant Biotechnology
    • /
    • v.35 no.1
    • /
    • pp.13-21
    • /
    • 2008
  • Final regulatory steps for commercialization of transgenic crops are risk assessment and variety registration. The risk assessment of transgenic crops requires broad network of scientists, high cost and long term. Developers of transgenic crops, therefore, face to additional challenges to consider theoretical and strategic aspects on risk assessment. The general concept for risk assessment of genetically modified organisms was derived from chemical risk assessment. Due to the complexity of organisms, however, comparative approaches that are substantial equivalence and familarity have been developed. In practical view, the integration of risk assessment is more difficult than the evaluation of each risk factors involving gene flow, toxicity and allergenicity. Variety registration of transgenic crops requires the results of risk assessment compared with non-GM crops and agronomic data analyzed with standard varieties. For economic and fast commercialization, risk assessment process should combined with condition of cultivation test for variety registration.

Evaluation of Nutrient Intake and Food Variety in Korean Male Adults according to Framingham Risk Score (Framingham Risk Score에 의한 한국 성인 남성의 영양소 및 식품 섭취의 다양성 평가)

  • Choi, Mi-Kyeong;Bae, Yun-Jung
    • The Korean Journal of Food And Nutrition
    • /
    • v.27 no.3
    • /
    • pp.484-494
    • /
    • 2014
  • The purpose of this study was to evaluate dietary intake according to the risk of coronary heart disease (less than 10% = low-risk group; 10~20% = middle-risk group) based on Framingham risk score (FRS), on 122 male adult subjects. The body weight and body mass index were not significantly different between the groups, while height of the low-risk group was shown to be significantly high compared to that of the middle-risk group. The daily energy intake was shown to be significantly high in the low-risk group with 1,910.88 kcal, compared to 1,606.63 kcal of the middle-risk group. As a result of analyzing nutrient intake per 1,000 kcal of energy, while the low-risk group had significantly high intake of animal protein, fat, and animal fat compared to the middle-risk group, the intake of plant protein, carbohydrate, and plant iron was found to be significantly low. The daily food intake was shown to be significantly high in the low-risk group (1,445.16 g), compared to the middle-risk group (1,075.12 g). The low-risk group was found to have significantly high intake of sugars, eggs, and beverages compared to the middle-risk group, while mushrooms intake was significantly high in the middle-risk group. Dietary variety score (DVS) was significantly high in the low-risk group with 26.42, compared to 22.66 of the middle-risk group. Dietary diversity score (DDS) was indicated to be significantly high in the low-risk group with 3.70, compared to 3.27 of the middle-risk group. The low-risk group was indicated to have significantly high score in DDS of dairy products and fruit group, compared to the middle-risk group. In the correlation between diversity index of food intake (DVS and DDS) and FRS, DDS was shown to have significantly negatively correlation with FRS after adjusting for confounding factors. To sum up these results, the adult males with low-risk of coronary heart disease had more various consumptions of fruits and milk, compared to the subjects with the middle-risk. The proportion of consuming major food groups such as cereals, meat group, milk, fruits, and vegetables more than a fixed quantity was indicated to be high. Accordingly, dietary habit for intake of various food seems to be necessary, to prevent coronary heart disease.

Application for Fire Protection Regulation based on Risk-Informed and Performance-Based Analysis (위험도 및 성능기반 분석방법에 의한 원전 화재방호규정 적용 방안)

  • Jee, Moon-Hak;Lee, Byung-Kon
    • Fire Science and Engineering
    • /
    • v.20 no.3 s.63
    • /
    • pp.65-70
    • /
    • 2006
  • From the beginning of the construction stage, the fire protection regulation for the nuclear power plants conforms to the design requirements for the acquisition of the license permit. This regulation is based on the plant status of the normal operation, but it is not enough to be used as an application standard for fire protection at the transient mode of the plant and the outage time for refueling as well as for the plant decommissioning. While the advanced fire protection requirement that has been developed in America recently suggests the performance-based requirement and management rule applicable to the overall life time of the plant, it simply represents the conceptual application. It means that it can not be treated as appropriate standards because it does not deal with the qualitative and quantitative approach in specific ways. By the way, with the use of the performance-based fire risk analysis, the dynamic behavior of the heat and smoke at the fire compartment of the nuclear power plants can be analyzed and the thermal effect to the safety-related equipment and cables can be evaluated as well. At this paper, it suggests the ways to change the applicable fire protection regulations and the required evaluation items for the fire risk resulted from the plant configuration change with an intent to introduce the state-of-the-art quantitative fire risk analysis technology at the domestic nuclear power plants.

Risk Assessment for Abolition of Gross Containment Leak Monitoring System Test in CANDU Design Plant (중수로 원자로건물 총누설감시계통 시험 중지에 따른 리스크 영향 평가)

  • Bae, Yeon-Kyoung;Na, Jang-Hwan;Bahng, Ki-In
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.5
    • /
    • pp.123-130
    • /
    • 2015
  • Wolsong Unit 2,3&4 has been performing a containment integrity test during power operation. This test could impact to the safe operation during test. If an accident occurs during pressure dropping phase, reactor trip can be delayed because of the increased pressure difference which causes a time delay to reach the trip set-point. On the contrary, if an accident occurs during pressure increasing phase, reactor trip could be accelerated because the pressure difference to the trip set-point decrease. Point Lepreau nuclear power plant, which installed GCLMS (Gross Containment Leakage Monitoring System) in 1990, has discontinued the test since 1992 due to these adverse effects. Therefore, we evaluated the risk to obviate the GCLMS test based on PWR's ILRT (Integrated Leak Rate Test) extension methodologies. The results demonstrate that risk increase rate is not high in case of performing only ILRT test at every 5 years instead of doing GCLMS test at every 1.5 years. In addition, the result shows that GCLMS test can be removed on a risk-informed perspective since risk increasement is in acceptable area of regulatory acceptance criteria.

A Forecast Model for the First Occurrence of Phytophthora Blight on Chili Pepper after Overwintering

  • Do, Ki-Seok;Kang, Wee-Soo;Park, Eun-Woo
    • The Plant Pathology Journal
    • /
    • v.28 no.2
    • /
    • pp.172-184
    • /
    • 2012
  • An infection risk model for Phytophthora blight on chili pepper was developed to estimate the first date of disease occurrence in the field. The model consisted of three parts including estimation of zoosporangium formation, soil water content, and amount of active inoculum in soil. Daily weather data on air temperature, relative humidity and rainfall, and the soil texture data of local areas were used to estimate infection risk level that was quantified as the accumulated amount of active inoculum during the prior three days. Based on the analysis on 190 sets of weather and disease data, it was found that the threshold infection risk of 224 could be an appropriate criterion for determining the primary infection date. The 95% confidence interval for the difference between the estimated date of primary infection and the observed date of first disease occurrence was $8{\pm}3$ days. In the model validation tests, the observed dates of first disease occurrence were within the 95% confidence intervals of the estimated dates in the five out of six cases. The sensitivity analyses suggested that the model was more responsive to temperature and soil texture than relative humidity, rainfall, and transplanting date. The infection risk model could be implemented in practice to control Phytophthora blight in chili pepper fields.

Risk Assessment of Petrochemical Equipments Using Enhanced RBI Technique (개선된 RBI 기법을 이용한 석유화학설비의 위험도평가)

  • Lee Sang-Min;Song Ki-Hun;Chang Yoon-Suk;Choi Jae-Boong;Kim Young-Jin;Han Sang-In;Choi Song-Chun
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.29 no.10 s.241
    • /
    • pp.1392-1398
    • /
    • 2005
  • API 581 guideline provides a methodology for calculating the risks of equipments in refinery or petrochemical plant. However, especially in part of the consequence of failure, there is a major limitation of its application to the petrochemical plant directly since only a representative material is considered in calculating the risk while the equipment is composed of numerous materials. The objectives of this paper are to propose an enhanced risk-based inspection (RBI) technique to resolve shortcomings inclusive of the above issue and to assess the risks of typical petrochemical equipments. In this respect, a program incorporating material database was developed to fully incorporate the characteristics of different materials. The proposed RBI program consists of qualitative, semi-quantitative and quantitative risk evaluation modules in which toxic materials as well as representative materials were selected automatically for comparison to those in the current guideline. It has been applied to assess the risks of equipments in ethylene facilities of petrochemical plants. Thereby, more realistic evaluation results were obtained and applicability of the proposed RBI program was proven.

Determination of antibiotics by SPE-LC-MS/MS in wastewater and risk assessment

  • Aydin, Senar;Aydin, Mehmet E.;Ulvi, Arzu;Kilic, Havva
    • Advances in environmental research
    • /
    • v.7 no.3
    • /
    • pp.201-212
    • /
    • 2018
  • In this study, conditions of solid phase extraction (SPE) for determination of some antibiotics such as trimethoprim, oxytetracycline, erythromycin, clarithromycin, azythromycin, doxycycline, sulfamethazine, ciprofloxacin, chlortetracycline, sulfamethoxazole in wastewaters were optimized. After the optimum volume and pH of the sample were determined, the effect of the concentration of the compounds and matrix were investigated. The highest recovery rates for antibiotic compounds were determined between 82% and 105% in 200 mL sample volume and pH 2.5. Then, antibiotic compounds were investigated in influent and effluent samples taken from Konya Urban Wastewater Treatment Plant. The concentration of the antibiotics was detected range of 0.11-101 ng/L in influent waters and

Improvement of Fire Blight Blossom Infection Control Using Maryblyt in Korean Apple Orchards

  • Kyung-Bong Namkung;Sung Chul Yun
    • The Plant Pathology Journal
    • /
    • v.39 no.5
    • /
    • pp.504-512
    • /
    • 2023
  • After transitioning from periodic to model-based control policy for fire blight blossom infection, it is crucial to provide the timing of field application with easy and accurate information. To assess the risk of blossom infection, Maryblyt was employed in 31 sites across apple-producing regions nationwide, including areas prone to fire blight outbreaks, from 2021 to 2023. In 2021 and 2023, two and seven sites experienced Blossom Infection Risk-Infection warning occurrences among 31 sites, respectively. However, in 2022, most of the sites observed Blossom Infection Risk-Infection from April 25 to 28, highlighting the need for blossom infection control. For the comparison between the two model-based control approaches, we established treatment 1, which involved control measures according to the Blossom Infection Risk-Infection warning and treatment 2, aimed at maintaining the Epiphytic Infection Potential below 100. The analysis of control values between these treatments revealed that treatment 2 was more effective in reducing Blossom Infection Risk-Infection and the number of days with Epiphytic Infection Potential above 100, with respective averages of 95.6% and 93.0% over the three years. Since 2022, the implementation of the K-Maryblyt system and the deployment of Automated Weather Stations capable of measuring orchard weather conditions, with an average of 10 stations per major apple fire blight county nationwide, have taken place. These advancements will enable the provision of more accurate and timely information for farmers based on fire blight models in the future.

Study on Development of Automated System for Hazard Screening at Analysis (위험 선별 및 분석 통합 자동화 시스템 개발에 대한 연구)

  • 한의진;김용하;최승준;김구회;윤인섭
    • Fire Science and Engineering
    • /
    • v.17 no.4
    • /
    • pp.20-27
    • /
    • 2003
  • Hazard Analysis is one of the basic tasks to ensure the safety of chemical plants. However, it is an arduous, tedious, time-consuming work and requires multidisciplinary knowledge and demands considerable cognitive load from the analysts. To overcome these problems, there have been attempts to automate this work by utilizing computer technology, particularly in the area of knowledge-based technique. There is two methods in the risk assessment of Chemical plant; quantitative and qualitative risk assessment. Both of them have been applied respectively, but if the integrated method of quantitative and qualitative risk assessments is used, all of the advantage of two methods can be applied. It is difficult to carry out integrated risk management of chemical plant. Therefore, automated integration system of risk management is necessary. We developed S/W Automated System for Hazard Screening & Analysis(ASCA) and applied to practical plant. By applying ASCA to case study, we can get the information about relative ranks of equipments, variable deviation, and consequence of potential accident. In this study, we applied ASCA to the H.T.U(Hydrotreating Unit) of the process to produce aromatic material. We could know relative ranks of equipments, variable deviation of malfunction in storage tank, D-101, and consequence of potential accident using ASCA. If integrated risk management in the chemical plant is applied, we can develop the emergency plan and prevent the accident.