Risk Assessment for Abolition of Gross Containment Leak Monitoring System Test in CANDU Design Plant  

Bae, Yeon-Kyoung (KHNP Central Research Institute)
Na, Jang-Hwan (KHNP Central Research Institute)
Bahng, Ki-In (KHNP Central Research Institute)
Publication Information
Journal of the Korean Society of Safety / v.30, no.5, 2015 , pp. 123-130 More about this Journal
Abstract
Wolsong Unit 2,3&4 has been performing a containment integrity test during power operation. This test could impact to the safe operation during test. If an accident occurs during pressure dropping phase, reactor trip can be delayed because of the increased pressure difference which causes a time delay to reach the trip set-point. On the contrary, if an accident occurs during pressure increasing phase, reactor trip could be accelerated because the pressure difference to the trip set-point decrease. Point Lepreau nuclear power plant, which installed GCLMS (Gross Containment Leakage Monitoring System) in 1990, has discontinued the test since 1992 due to these adverse effects. Therefore, we evaluated the risk to obviate the GCLMS test based on PWR's ILRT (Integrated Leak Rate Test) extension methodologies. The results demonstrate that risk increase rate is not high in case of performing only ILRT test at every 5 years instead of doing GCLMS test at every 1.5 years. In addition, the result shows that GCLMS test can be removed on a risk-informed perspective since risk increasement is in acceptable area of regulatory acceptance criteria.
Keywords
GCLMS; PSA; ILRT; CDF; LERF; consequence analysis; probabilistic population dose;
Citations & Related Records
연도 인용수 순위
  • Reference
1 AECB, "Regulatory Document R-7 Requirement for Containment Systems for CANDU Nuclear Power Plants", 1991.
2 NUREG-1493, "Performance-Based Containment Leak-Test Program", 1995.
3 J. Gisclon, W. Parkinson and K. Canavan, "Interim Guidance for Performing Risk Impact Assessments in Support of One-Time Extensions for Containment Integrated Leakage Rate Test Surveillance Intervals", Nuclear Energy Institute, 2001.
4 KINS/RG-N07.10, "Guidelines of Containment System Leakage Testing for PWRs", 2011.
5 AECL, "Gross Containment Leakage Monitoring System", 1996.
6 KHNP, "Probabilistic Safety Assessment for Wolsong Unit 2,3,&4", 2007.
7 KHNP, "FSAR Chapter 11.3", pp.11.3-2-9, 1996.
8 K. F. Eckerman, et al., "Federal Guidance Report No. 13 Cancer Risk Coefficients for Environmental Exposure to Radionuclides", EPA 402-R-99-001, 1999.
9 KHNP, "Distribution of Population, Agricultural and Fishery Product around Wolsong Nuclear Site, 2012.
10 Korean Statistical Information Service(http://kosis.kr)
11 KHNP, "Risk Assessment of Integrated Leak Rate Test Interval Extension for Ulchin Units 5,6", 2011.
12 KINS, "Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis(KINS/RG-N16.07)", 2011.