가동중 정비를 위한 Risk Monitor 개발 (Risk Monitor Development for On-Line Maintenance)

  • 김길유;한상훈;김태운
    • 한국안전학회지
    • /
    • 제12권4호
    • /
    • pp.21-26
    • /
    • 1997
  • Korea Atomic Energy Research Institute (KAERI) developed a risk monitor called Risk Monster which supports for plant operators and maintenance schedulers to monitor plant risk and to avoid high peak risk by rearranging maintenance work schedule. Risk Monster can update the plant risk continuously according to the change of system/component configuration since Risk Monster reevaluates the plant risk based on the Probabilistic Safety Assessment (PSA) results. A brief description of Risk Monster is provided. The PSA model of UCN 3, 4 nuclear power plant was converted by KAERI to Risk Monster model. Using this Risk Monster model, a feasibility study of the on-line maintenance of an Essential Service Water (ESW) pump was performed. On-line maintenance of one ESW pump has been shown to be acceptably safe, and has economic benefits. In addition, it is not a violation of technical specification to continue plant operation with an out-of-service ESW pump.

  • PDF

SSC risk significance in risk-informed, performance-based licensing of non-LWRs

  • James C. Lin
    • Nuclear Engineering and Technology
    • /
    • 제56권3호
    • /
    • pp.819-823
    • /
    • 2024
  • The main criteria used in NEI 18-04 to define SSCs as risk-significant include (1) the SSC is required to keep all LBEs within the F-C target, and (2) the total frequency with the SSC failed exceeds 1% of the limit for at least one of the three cumulative risk metrics used for evaluating the integrated plant risk. The first one is a reasonable criterion in determining the risk significant SSCs. However, the second criterion may not be adequate to serve the purpose of determining the risk significance of SSCs. In the second criterion, the cumulative risk metric values representing the integrated plant risk (less the preventive and mitigative effects of the SSC being evaluated) are compared to a risk limit that represents a very small contribution to the overall integrated plant risk, which corresponds appropriately to the contributions from individual SSCs. The easiest approach to redefine the NEI 18-04 definition of risk-significant SSCs in relation to the integrated plant risk metrics is to compare the difference, between the risk metric value calculated with the SSC failed and the risk metric value calculated with the SSC credited, with 1% of the risk limit established for the integrated plant risk metrics.

플랜트 프로젝트 리스크의 평가 및 관리시스템에 관한 연구 (Assessment and Management System for Various Risks in Plant Projects)

  • 안승규;조동환;허진혁;문승재;유호선
    • 플랜트 저널
    • /
    • 제6권1호
    • /
    • pp.56-63
    • /
    • 2010
  • While the local plant market is reducing its volume, the plant market over the world since 2000s is rapidly expanding. The nation's construction companies, aggressively dedicated in launching out overseas plant market, increase the volume of orders in that sector, but there also are much difficulty in the project management as those projects ordered are gradually large scaled with more cutting-edge high-tech requirements along with comparatively higher risk. Though the local construction companies have developed their own types of measures to analyze the risk evaluation putting into practice, the specialized decision-making model for the overseas plant market or the risk measure understandable easily and applicable practically is not yet shown. This paper aims at providing the methodology to evaluate the risk by way of constructing the risk evaluation process in order to induce risk measuring elements through appropriate indexing system. Furthermore, through studying the risk management system, it aims to seek for a thorough risk management method from beginning of the project to the end.

  • PDF

플랜트 유틸리티 시공에서 리스크 관리에 관한 연구 (On the Analysis of Risk Management for a Utility Construction Work in Plant Projects)

  • 한기돈;허진혁;문승재;유호선
    • 플랜트 저널
    • /
    • 제6권1호
    • /
    • pp.64-70
    • /
    • 2010
  • From 2000, the world plant market, especially plant developing business related to oil and gas, has been increasing. Domestic construction companies advance to overseas plant construction market actively, and proportioning to this, an importance of utility construction is increasing. However, the project becomes large and high-tech, and many companies experience difficulty of project management due to relatively high risk of overseas construction. In this study, we built the standard process with which domestic company can evaluate the risk of overseas plant utility construction. Primary factors for risk evaluation is derived, classification system is made out, primary factor is analyzed, and counter plan is suggested. And thorough management of risk is performed by risk management organization that manages the risks, risk control methods, reports and monitors through risk sheet and risk action log from the start of project to the end.

  • PDF

Analysis of Construction-phase Risk Factors for SMEs' Advance into the Overseas Plant Construction Projects

  • Park, Moonsun;Lee, Kyosun
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.328-331
    • /
    • 2017
  • The purpose of this study is to derive construction-phase risk factors in SMEs' advance into overseas plant construction projects. For this, construction-phase risk factors were investigated on the basis of the analysis of Korean construction companies, overseas plant industry-related research institutes, and overseas data. In addition, major risk factors were derived from the investigated construction-phase risk factors, and quantitative risk factors and qualitative risk factors were analyzed and derived from these major risk factors, by the use of three rounds of the Delphi analysis.

  • PDF

원자력발전소 건설공사의 공종별 위험도에 관한 연구 (A Study on the Risk Level of Work Types in Nuclear Power Plant Construction)

  • 이종빈;이준경;장성록
    • 한국안전학회지
    • /
    • 제28권3호
    • /
    • pp.95-99
    • /
    • 2013
  • The goal of this study was to investigate some significant factors to influence level of safety at plant construction field and analyze degree of risk by work classification. Currently, there are lots of construction fields for the nuclear power plant for electricity generation, and our government also planned constructing more nuclear power plant in near future. However, much of the safety literature neglected the degree of risk factors on the plant construction field. Safety managers participated in the brainstorming session for drawing decision criteria of the degree of risk (i.e., significant factors). Then, they were asked to answer a structured questionnaire which was developed for drawing most important factors. Finally, the analytic hierarchy process (AHP) was used to analyze level of risk by work classification. The following results were obtained. First, total twelve factors judging degree of risk were found in the brainstorming session. Second, the questionnaire showed four significant factors, including number of workers, working environments, skill of craft and accident experience. Third, the results of AHP showed Architecture work is the most dangerous work among 6 work types. The results could be used to reduce degree of risk in construction field of the nuclear power plant.

원자력 발전 플랜트 RCB 시공의 리스크 요인에 관한 분석 모델 (Analysis Model on Risk Factors of RCB Construction in Nuclear Power Plant)

  • 신대웅;신윤석;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.212-213
    • /
    • 2014
  • The purpose of this study is to suggest analysis model of RCB construction in nuclear power plant. For the objective, This study drew the risk factors of RCB construction from existing literature. The results of the study proposed analysis model made hierarchy in rebar, form, and concrete work. These will be baseline data for risk management in construction project of nuclear power plant.

  • PDF

시스템엔지니어링을 이용한 턴키방식 플랜트 건설계약의 기술적 위험요인 효과적 분석 및 관리 (An Effective Analysis and Management of Technical Risk to Turn-key based Plant Construction Contracts using Systems Engineering)

  • 홍대근;변희철;서석환
    • 시스템엔지니어링학술지
    • /
    • 제10권2호
    • /
    • pp.59-69
    • /
    • 2014
  • In the bidding stage of turn-key based plant construction contracts, owners provide design and performance basis for contractors instead of giving design drawing. To win the bid for a plant construction, the contractors should be obliged to satisfy and ensure owners'requirements such as design and performance basis in a plant construction project, In other words, owners imposes technical risk of the design to the contractors by specifying responsibility for the analysis and verification of the plant construction. Thus, it is very important that contracters make accurate and realistic basic design plan in a short period of time. To deal with such a situation, we propose a systems engineering approach for the analysis and management of the technical risk. Specifically, we first: 1) Analyzes technical risk related with the plant design information for the bidders, followed by 2) Developing stakeholder requirements for the basic engineering design, and 3) System requirements for dealing with technical risk. Also, in this paper, we proposed converting method from MOE(Measure of Effectiveness) to MOP(Measure of Performance) in the risk analysis. To show the effectiveness of the proposed method, we carried out a case study.

철강 제조업의 플랜트 공사 중 유해.위험 저감 방안 (A Study on Reduction of Hazard Conditions on Plant Work of Steel Industry)

  • 서성화;원종일;우흥식
    • 대한안전경영과학회지
    • /
    • 제13권4호
    • /
    • pp.61-69
    • /
    • 2011
  • The hazard conditions on plant works of the steel industry have been investigated to efficiently prevent from industrial accidents. The plant works are eventually carried out by workers of smaller service companies where the safety management systems are not well established, on behalf of the main steel company. Based on the preliminary risk assessment on the plant working and open literature reviews, the safety management systems, which can be applied to the plant workplace of each process, are studied and then the step-by-step 4M check-list method is established. Accordingly, the risk assessment technique using 4M checklist for the plant workplace is proposed. In addition, a standardized flow-chart for safety management of plant work is introduced. These risk assessment technique and flow-chart can definitely contribute to the reduction of industrial accidents, considering the risk characterization and the unsafe conditions in small and medium-sized plant workplace, as effective safety management tools and safety guide line.