A Presentation of a Cost Classification System for Gas Plant Construction Projects

  • Park, Moonsun;Kim, Yongsu
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.625-626
    • /
    • 2015
  • The purpose of this study is to present a cost classification system that can be used in gas plant construction projects. Towards this end, it examined the detailed statements of the construction companies which had experience in carrying out plant construction projects. Based on the above, it also presented a life-cycle (i.e., EPCC) cost classification system for the gas plant construction projects by conducting the Delphi analysis through the expert opinions.

  • PDF

Fundamental Investigation of Knowledge Management System for a Plant

  • Seo-kyung Won;Ji-Yune Soh;Junbok Lee ;Choong-hee Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.375-380
    • /
    • 2009
  • Gas & Oil plant construction projects are increasing recently all over oil-producing countries. An EPC (Engineering, Procurement and Construction) company, which participates in the plant projects, should possess pertinent engineering licenses and EPC management skills to create high added-value. Nonetheless, there exist various risks involved in the EPC life cycle process due to such characteristics of construction projects as long duration of construction time and complicated processes along with the procured goods or services subjected to various logistics. The objective of this paper is to analyze the overall EPC life cycle for proper process and to examine various information and document. Additionally, the principal data for the analysis of the EPC process are derived from personal interviews with experts and specialty contractors of the plant projects. The results of this study would be widely used as a guide for efficient and effective management of overseas gas plant projects.

  • PDF

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

Process Model for development of EVMS in Nuclear Power Plant Project (원전건설 성과관리시스템(EVMS) 개발을 위한 프로세스 모델 연구)

  • Kim, Yun-Myung;Won, Seo-Kyung;Shin, Il-Sub
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.58-59
    • /
    • 2014
  • EVM(Earned Value Management) is a management methodology for integrating scope, schedule and resources, and for objectively measuring project performance and progress. EVMS(Earned Value Management System) has been used for the performance measurement of R&D and construction projects in developed countries such as United States, United Kingdom and Australia. The nuclear power plant (NPP) projects in Korea have not applied EVMS. However, EVMS has come into request for overall schedule and cost risk management and performance measurement in overseas project of the nuclear power plant as a contractor. In this paper, based on the global EVMS guidelines, EVMS per unit processes have been developed for NPP projects. Moreover, using Business Process Management (BPM), it proposes an integrated process model with tasks, roles, and procedures for EVMS for NPP construction projects.

  • PDF

A Study on the safety management condition and disaster reduction measures of plant construction projects -focusing on chemical engineering plants- (플랜트 건설 사업 안전관리 실태 및 재해 저감 방안 연구 -화공 플랜트를 중심으로-)

  • Kim, Seung-Han;Lee, SUNG-ll
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.87-94
    • /
    • 2017
  • The purpose of this study is to provide basic data to help ensure the safety and enhance industrial competitiveness of plant construction projects by analyzing the safety management status of, mainly, chemical engineering plant construction projects, and proposing specific measures and models to reduce human/educational, technical/systemic, institutional disasters. This study was done using literature research and case study/empirical study methods. The results of this study are summarized as follows. First, we classified the major disasters from the quarterly released 'major diaster cases in construction business' from Korea Occupational Safety and Health Agency according to the type of construction and presented the causes and prevention measures.

PROGRAMMATIC AND PROJECT-LEVEL RISKS: ESTABLISHING A RISK MANAGEMENT PROCESS FOR MIDDLE EAST PLANT PROJECTS

  • G. Edward Gibson Jr.;John Walewski;SangBum Kim;Clayton Ingam;Hamid Hajian
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1000-1014
    • /
    • 2009
  • Research sponsored by the Korean Government investigated the establishment of a risk management process by Korean contractors involved with plant projects in the Middle East. This research effort builds upon the work completed by the Construction Industry Institute (CII), called the International Project Risk Assessment (IPRA) tool and method, and also explored how CII's Project Definition Rating Index (PDRI) could be incorporated to improve project planning by addressing risks and scope development issues. Specific findings and recommendations were developed including the creation of the Contractor Critical Areas of Concern (CCAC) risk screening tool for Korean contractors pursuing Middle East oil and gas projects.

  • PDF

A Comparative Analysis of Risk Assessment Depending on International Project Types (플랜트, 건축, 토목 공종별 해외건설 리스크평가 비교분석)

  • Baek, Seungwon;Han, Seung-Heon;Jung, Wooyong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.125-136
    • /
    • 2019
  • This study investigated checked risk level before bid, actual risk level after award, contingency, and cost growth rate in the 124 international construction projects executed by Korean major companies. This study conducted comparative analysis by product type using rank analysis, ANOVA and correlation analysis. As a result, plant and civil projects have worse risk level than architecture projects not only in before bid but also in after award. Especially, country risk is the worst risk in both plant and civil projects, followed by project risk and capability risk. Also, although plant and civil projects reflect more contingency than architecture projects, contingency is not correlated with the checked risk level before bid. Lastly, the cost growth rate is correlated with the actual risk level in all product types. This study is expected to support in planning better practical risk management for international construction projects.

Systems Engineering-based Approach In Developing Concept Design Of Carbon Capture System (이산화탄소 포집 시스템 개념설계 개발을 위한 시스템 엔지니어링 기반 접근방법)

  • Lee, Chang Hwan;Hong, Dae Geun;Yoon, Su Chul;Suh, Suk-Hwna;Sur, Hwal Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.9 no.2
    • /
    • pp.23-36
    • /
    • 2013
  • Plant industry is one of technology-intensive and most prosperous industries in Korea because of its recent prosperity and promising outlook in export. However, no Korean EPC company has yet been well prepared in lifting their capacity sufficient enough to get the upstream conceptual or basic design and engineering orders for sizable plant projects which are known as the more value-added. If systems engineering, a methodology which developed complex systems such as airplanes and has been justified its effectiveness in Defense and NASA projects, can be integrated with plant engineering which should be developed and applied based on the requirements of so many stakeholders, conditions, lifecycle concepts, and constraints of the projects, huge synergic effect is expected particularly in developing a specific upstream design, which is a conceptual or basic design. The notion of integration with each other between systems engineering and plant engineering can be really the crux of EPC's success in any plant projects. This paper suggests an approach showing a methodology how to dig out, analyze, evaluate, verify and implement the stakeholders' requirements into a plant design in conceptual phase using the theory and skills of systems engineering. ISO/IEC 15288 well known systems engineering standards is used. Carbon capture system is used for a case study, for it is an emerging technology in reducing emissions of carbon dioxide causing global warming from flue gas after combustion. Here systems engineering was proven to play a substantial role in enhancing the capability of designers in developing a conceptual design of whole plant or certain part of crucial plant systems.

Development and Application of Integrated Management System in Nuclear Power Plant Construction Project

  • Lee, Sang Hyun;Byon, Su Jin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.700-701
    • /
    • 2015
  • Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.

  • PDF

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF