• Title/Summary/Keyword: Plant Performance

Search Result 3,375, Processing Time 0.032 seconds

Development of Performance Evaluation System for Plant Management Appling BSC Concept (BSC를 이용한 설비관리 업무의 성과평가시스템 개발)

  • Kim, Kwang-Man
    • Journal of the Korea Society of Computer and Information
    • /
    • v.17 no.2
    • /
    • pp.231-239
    • /
    • 2012
  • A company's reliance on plants is growing in the area of production and service. Therefore, the importance of the work on plants in order to manage them efficiently is growing. Effective plant management increases the durability and efficiency of the plant. An organized BSC also increases the workers' will to work harder which is to bring the higher quality of plant management. In this way, however, it has studied with variety ways to assess plant management task for performance evaluation, there is a little deficiency that the study of methodical performance evaluation that based on the some strategies. The BSC, the very way, and it has been utilized in balanced and methodical performance evaluation means in widespread fields with strategy as the center to get visions. In this study, I have developed the performance evaluation system for plant management, appling BSC concept.

A Study on the Evaluation of Turbine Efficiency through the Performance Test of New Power Plant (신규 화력발전소의 성능 시험을 통한 터빈 효율의 평가에 관한 연구)

  • Kweon, Y.S.;Chung, H.T.;Jung, Y.B.
    • Journal of Power System Engineering
    • /
    • v.5 no.1
    • /
    • pp.11-20
    • /
    • 2001
  • Super-critical type steam power plant, which operates with steam pressure above the super-critical point, has a good reputation recently and is adopted as a new standard of the Korean Electric Power Corporation. The reason for the good reputation lies in it's superior power efficiency. However, the field data of the new power plant for the verification of it's performance are still insufficient, and more empirical data are needed to acquire technologies on the effective operation of it. In this study, the authors analyzed the field test data on power efficiencies got in a super-critical type steam power plant, and evaluated the excellency of the new plant by comparing the efficiency data with the one got in a conventional sub-critical type steam power plant.

  • PDF

Performance Evaluation of an Oxy-coal-fired Power Generation System - Thermodynamic Evaluation of Power Cycle (순산소 석탄 연소 발전 시스템의 성능 평가 - 동력 사이클의 열역학적 해석)

  • Lee, Kwang-Jin;Choi, Sang-Min;Kim, Tae-Hyung;Seo, Sang-Il
    • Journal of the Korean Society of Combustion
    • /
    • v.15 no.2
    • /
    • pp.1-11
    • /
    • 2010
  • Power generation systems based on the oxy-coal combustion with carbon dioxide capture and storage (CCS) capability are being proposed and discussed lately. Although a large number of lab scale studies for oxy-coal power plant have been made, studies of pilot scale or commercial scale power plant are not enough. Only a few demonstration projects for oxy-coal power plant are publicized recently. The proposed systems are evolving and various alternatives are to be comparatively evaluated. This paper presents a proposed approach for performance evaluation of a commercial 100 MWe class power plant, which is currently being considered for 'retrofitting' for the demonstration of the concept. The system is configurated based on design and operating conditions with proper assumptions. System components to be included in the discussion are listed. Evaluation criteria in terms of performance are summarized based on the system heat and mass balance and simple performance parameters, such as the fuel to power efficiency and brief introduction of the second law analysis. Also, gas composition is identified for additional analysis to impurities in the system including the purity of oxygen and unwanted gaseous components of nitrogen, argon and oxygen in air separation unit and $CO_2$ processing unit.

A Knowledge Base Construction for Control Application (제어응용을 위한 지식베이스의 구축)

  • 김도성;이명호
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.39 no.7
    • /
    • pp.720-728
    • /
    • 1990
  • A learning control method is proposed in this paper, using a knowledge base which contains control rules, data, and patterns of the past experience of a plant. The knowledge for plant control is retrieved from measurement data during operation and continually modified after control performance evaluation. A control method is proposed using tinually modified after control performance evaluation. A control method is proposed using fuzzy model of the plant and a recursive statistic decision method of fuzzy subset for control rule generation. Also, the resulting knowledge-based control algorithm has been applied to aprocess and its performance improvement and proper generation of appropriate control rules have been verified.

  • PDF

Development of Human Performance Measures for Human Factors Validation in Advanced Nuclear Power Plants (신형원전 주제어실 인적요소 검증을 위한 인적수행도 평가척도 개발)

  • Ha, Jun-Su;Seong, Poong-Hyun
    • Journal of the Ergonomics Society of Korea
    • /
    • v.25 no.3
    • /
    • pp.85-96
    • /
    • 2006
  • Main control room(MCR) man-machine interface(MMI) design of advanced nuclear power plants(NPPs) such as APR(advanced power reactor)-1400 can be validated through performance-based tests to determine whether it acceptably supports safe operation of the plant. In this work, plant performance, personnel task, situation awareness, workload, teamwork, and anthropometric/physiological factor are considered as factors for the human performance evaluation. For development of measures in each of the factors, techniques generally used in various industries and empirically proven to be useful are adopted as main measures and some helpful techniques are developed in order to complement the main measures. Also the development of the measures is addressed based on the theoretical background. Finally we discuss the way in which the measures can be effectively integrated and then HUPESS(HUman Performance Evaluation Support System) which is in development based on the integrated way is briefly introduced.

Economic Evaluation of Coals Imported in Last 3 Years for Power Plant Based on Thermal Performance Analysis (최근 3년간 수입 유연탄 분석 및 연소열성능 해석을 활용한 석탄화력 발전소 탄종 경제성 평가 연구)

  • Baek, Sehyun;Park, Hoyoung;Ko, Sung Ho
    • Journal of the Korean Society of Combustion
    • /
    • v.18 no.3
    • /
    • pp.44-53
    • /
    • 2013
  • In this study, the economic evaluation for imported coals was conducted for power plant based on thermo-dynamical performance analysis. The number of coal types considered was 1,755 imported by five power generation companies in Korea during the 2010-2012. The higher heating value (HHV) of the coals ranged 4,000-6,500 kcal/kg, mostly sub-bituminous. The 1D thermo-dynamical performance modeling was performed for a 500 MWe standard power plant using PROATES code. It was founded that the low rank coals had negative effects on the plant efficiency mainly due to the increased heat loss by moisture, hydrogen and flue gas. Based on the performance analysis, the economic performance of the coals was evaluated. The apparent price of low-rank coals tended to be significantly lower than design coal; for example, the unit price of coal with a HHV of 4,000 kcal/kg was 57% of the reference coal having 6,080 kcal/kg. Considering the negative effects leading to a decrease in the thermal performance, heating value compensation, and increased parasite load, the corrected unit cost for the coal with 4,000 kcal/kg was 90.7% of the reference coal. Overall, the cost saving by imported coals was not high as expected.

Development of Power Performance Evaluation System using Modeling Technology (설비 모델링 기술을 이용한 발전성능평가 시스템 구성방안 연구)

  • Lee, Ji-Hoon;Lee, In-tae;Jung, Nam-Joon;Bae, Jung-Seok;An, Young-Mo
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.4 no.2
    • /
    • pp.81-88
    • /
    • 2018
  • Performance evaluation of a plant to efficiently manage and maintain the performance of the plant is a very important procedure. However, since the conventional performance evaluation method is an Excel-based manual method, the preparation procedure is complicated and the versatility is poor. In this paper, we analyze the problems of the existing performance evaluation system, effectively model the equipment, calculate the missing physical properties, and improve the versatility, efficiency and accuracy of the performance evaluation through the equipment modeler which performs automatic index calculation based on this.

A Study on the Performance Prediction Methodology of Small Hydropower Plant (소수력발전소의 성능예측 기법에 관한 연구)

  • Park, Wan-Soon;Lee, Chul-Hyung;Jeong, Sang-Man
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.894-898
    • /
    • 2006
  • A model, which can analyze the hydrological performance for small hydropower(SHP) plants having no flow duration characteristics has been studied and developed. System performance of existing SHP plant under operating was analyzed by using the developed model. The annual operational rate of SHP plant showed that the data were in good agreement with predicted results from the model. Based on these results, several SHP sites to be exploited were selected and the performance characteristics were analyzed by using the developed model. Also, primary design values such as design flow rate, plant capacity, and operational rate were suggested. As a result, it was found that the methodology used in this study is useful tool to predict the hydrological system performances of SHP sites.

  • PDF

A Study on the Performance Prediction Methodology of Small Hydropower Plant (소수력발전소의 성능예측기법에 관한 연구)

  • Lee, C.H.;Park, W.S.
    • 유체기계공업학회:학술대회논문집
    • /
    • 2005.12a
    • /
    • pp.742-747
    • /
    • 2005
  • A model, which can analyze the hydrological performance for small hydropower(SHP) plants having no flow duration characteristics has been studied and developed. System performance of existing SHP plant under operating was analyzed by using the developed model. The annual operational rate of SHP plant showed that the data were in good agreement with predicted results from the model. Based on these results, several SHP sites to be exploited were selected and the performance characteristics were analyzed by using the developed model. Also, primary design values such as design flow rate, plant capacity, and operational rate were suggested. As a result, it was found that the methodology used in this study is useful tool to predict the hydrological system performances of SHP sites.

  • PDF

Analysis of the Performance Test Results of a Heat Pump for Closed Cooling Water Heat Recovery on a Combined Thermal Power Plant (복합화력의 냉각수 배열회수를 위한 히트펌프의 성능평가 사례 분석)

  • Lee, Sung-Ho
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.26 no.11
    • /
    • pp.541-546
    • /
    • 2014
  • The present study was conducted to determine whether ESCO Business is success or not. ESCO Business recovers the investment costs by the energy savings resulting from complementing existing energy facilities. The guaranteed parameters are Quantity of Heat Recovery, and Generator output drop. The results of the Performance Test show that the Quantity of Heat Recovery increased by 11.52 Gcal/h, and Generator output decreased by 0.234 MW, which satisfied the guarantee value.