• Title/Summary/Keyword: Plant Maintenance

Search Result 930, Processing Time 0.028 seconds

A Case Study on Human Errors in Thermal Power Plant (화력발전소에서의 인적오류 사례 및 개선방안)

  • Park, Young-Kyu;Chun, Sang-Ki;Kim, Bong-Bin;Kim, Yoon-Kyong;Jung, Chang-Woo
    • IE interfaces
    • /
    • v.21 no.3
    • /
    • pp.247-253
    • /
    • 2008
  • There are various types of unexpected troubles in service of a thermal power plant, which consists of many complicated high-tech mass equipments. The troubles are mostly caused by the manufacturing defects, the material deteriorations, the human errors, and others. Failures of its system due to the troubles, can bring on the extravagant economic loss and the qualitative degradation of electricity. Especially, it is most important to find a way to decrease human errors because it can result in not only the economic loss, but also morale declination of employees or the department related to the trouble. Therefore, we categorize previous troubles related to the human errors, and try to show the causations and the counter-measures based on the various categories such as maintenance, an operation, and system of the thermal power plants.

Electrical system design in FLNG offshore unit

  • Kim, Jong-Su;Kim, Deok-Ki
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.39 no.10
    • /
    • pp.1037-1043
    • /
    • 2015
  • In recent years, Floating Liquefied Natural Gas (FLNG) Unit have attracted considerable attention. Generally, liquefied natural gas (LNG) units are produced in onshore liquefaction terminals from gas supplied from onshore gas fields or large-scale offshore gas fields near the coast. However, the development of these gas fields has approached saturation. Large-scale offshore gas fields far from the coast, as well as undeveloped medium- and small-scale offshore gas fields, have recently attracted attention. Among several proposed concepts, the floating LNG plant in the form of the FLNG system was chosen for further evaluation and development, considering worldwide receiving infrastructure. The design of a 2.5 million tonne per annum FLNG unit has been completed with a capacity corresponding to that of modern onshore liquefaction plants. Various simulation tests were performed to evaluate the performance of the electrical power plant, focusing on the efficiency of the electrical system to secure the aspects of plant safety. This design study analyzes the electrical system for the FLNG unit to improve the safety of operation and maintenance in the field.

Cross-talk between Phosphate Starvation and Other Environmental Stress Signaling Pathways in Plants

  • Baek, Dongwon;Chun, Hyun Jin;Yun, Dae-Jin;Kim, Min Chul
    • Molecules and Cells
    • /
    • v.40 no.10
    • /
    • pp.697-705
    • /
    • 2017
  • The maintenance of inorganic phosphate (Pi) homeostasis is essential for plant growth and yield. Plants have evolved strategies to cope with Pi starvation at the transcriptional, post-transcriptional, and post-translational levels, which maximizes its availability. Many transcription factors, miRNAs, and transporters participate in the Pi starvation signaling pathway where their activities are modulated by sugar and phytohormone signaling. Environmental stresses significantly affect the uptake and utilization of nutrients by plants, but their effects on the Pi starvation response remain unclear. Recently, we reported that Pi starvation signaling is affected by abiotic stresses such as salt, abscisic acid, and drought. In this review, we identified transcription factors, such as MYB, WRKY, and zinc finger transcription factors with functions in Pi starvation and other environmental stress signaling. In silico analysis of the promoter regions of Pi starvation-responsive genes, including phosphate transporters, microRNAs, and phosphate starvation-induced genes, suggest that their expression may be regulated by other environmental stresses, such as hormones, drought, cold, heat, and pathogens as well as by Pi starvation. Thus, we suggest the possibility of cross-talk between Pi starvation signaling and other environmental stress signaling pathways.

Production of glycoalkaloids from callus cultures of Solanum hainanense Hance

  • Loc, Nguyen Hoang;Anh, Nguyen Huu Thuan;Binh, Doan Huu Nhat;Yang, Moon-Sik;Kim, Tae-Geum
    • Journal of Plant Biotechnology
    • /
    • v.37 no.1
    • /
    • pp.96-101
    • /
    • 2010
  • Leaf explants of the Solanum hainanense plant, grown in vitro, were cultured in basal Murashige and Skoog (MS) media supplemented with 0.5 mg/L kinetin and 1 mg/L 2,4-dichlorophenoxyacetic acid (2,4-D) for callus initiation. For maintenance and proliferation, the callus was cultured on MS medium supplemented with 1 mg/L 6-benzylaminopurine (BAP) and 0.5 mg/L 2,4-D. The glycoalkaloid content in the callus was at its maximum after ten weeks of culture (188.65 mg/g), whereas that of the one-year-old control was 22.22 mg/g in the root and 5.99 mg/g in the stem. The glycoalkaloid extracted from the callus inhibited the activity of collagenase on collagen gel. High performance liquid chromatography (HPLC) analysis showed that biotransformation occurred when a callus was grown on medium supplemented with various carbon sources. These results suggest that callus of S. hainanense is a good material for production of glycoalkaloid.

Feasibility Study of UV-Disinfection for Water Reuse of Effluent from Wastewater Treatment Plant (용수재이용을 위한 하수처리 유출수의 UV 소독 효율 연구)

  • 윤춘경;정광욱;함종화;전지홍
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.45 no.2
    • /
    • pp.126-137
    • /
    • 2003
  • The feasibility study of UV-disinfection system was performed for disinfection of effluent from wastewater treatment plant. Three low-pressure UV lamps of 17, 25, and 41 W were examined with various flow rates. Low-pressure UV lamps of 17W were examined with various turbidity, DOM (dissolved organic matter), and SS (suspended solid). The pilot plant was a flow-through type UV-disinfection system, and the range of exposure time varied from 5 to 40 seconds, turbidity from 0 to 40 NTU, DOM from 0 to 30 mg/L, and SS from 10 to 40 mg/L. The 41W lamp demonstrated complete disinfection showing no survival ratio in all the experimental conditions, and generally 17W and 25W lamps also showed high removal ratio over 97%. For the same UV dose (UV intensity times exposure time), high intensity-short exposure conditions showed better disinfection efficiency than low intensity-long exposure conditions. While the effects of turbidity and DOM were not apparent, the effects of SS was significant on the disinfection efficiency which indicates that SS control before UV-disinfection appears to be necessary to increase removal efficiency. Considering characteristics of effluent from existing wastewater treatment plants, cost-effectiveness, stable performance, and minimum maintenance, the flow-through type UV-disinfection system with high intensity and low-pressure lamps was thought to be a competitive disinfection system for wastewater reclamation.

Third Wave of Gas Management System in LNG Carrier - VaCo System (LNG 운반선에서의 신개념 증발 가스 처리 시스템 - VaCo 시스템)

  • Choi, Jung-Ho;Yoo, Hong-Sung;Yoo, Kyung-Nam;Heo, An;Lee, Dou-Yeong;Lyy, Sung-Kak
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2007.09a
    • /
    • pp.89-93
    • /
    • 2007
  • The Boil-off gas (BOG) generation during the voyage is inevitable since Natural Gas (NG) in normally liquefied below -160 degree C in atmosphere condition and small heat ingress due to relatively hot outside keeps evaporating continuously. The one of major issue in LNG carriers is to handle generated BOG from cargo tank. The generated BOG affects to increase the cargo tank pressure and Gas Management System (GMS) for LNG carriers is closely related to cargo tank pressure maintenance. Economically, BOG is generally used as fuel in LNG carrier. Newly developed GMS for LNG carrier in boiler propulsion system, VaCo System, not only accomplish automatic control in GMS but also ensure safer operation.

  • PDF

A Study on leasing space to install solar power systems Economic Evaluation (임차공간 설치 태양광 발전시스템 경제성 평가에 관한 연구)

  • Seo, Mi-Ja;Lee, Jae-Hwan;Seo, Tae-Won;Han, Myung-Hee;Woo, Je-Teak
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.10 no.12
    • /
    • pp.1373-1380
    • /
    • 2015
  • The rapid spread and various design of solar power plants, development, construction, maintenance technology and business coexist variety and price decline and the recent solar power plants built since the early 2010 despite the decline in the power generation unit main equipment Construction of power plants to stabilize the technology has been continuously promoted. Recently, built in the form of a solar power plant to the construction and leasing the roof and upper structure to replace the limited ground space is increasing. Factory roof, studies such as warehouse and logistics center leased space in the roof installed solar plant status and skills, conducted a study to review and analyze the economy.

Development of a Leading Performance Indicator from Operational Experience and Resilience in a Nuclear Power Plant

  • Nelson, Pamela F.;Martin-Del-Campo, Cecilia;Hallbert, Bruce;Mosleh, Ali
    • Nuclear Engineering and Technology
    • /
    • v.48 no.1
    • /
    • pp.114-128
    • /
    • 2016
  • The development of operational performance indicators is of utmost importance for nuclear power plants, since they measure, track, and trend plant operation. Leading indicators are ideal for reducing the likelihood of consequential events. This paper describes the operational data analysis of the information contained in the Corrective Action Program. The methodology considers human error and organizational factors because of their large contribution to consequential events. The results include a tool developed from the data to be used for the identification, prediction, and reduction of the likelihood of significant consequential events. This tool is based on the resilience curve that was built from the plant's operational data. The stress is described by the number of unresolved condition reports. The strain is represented by the number of preventive maintenance tasks and other periodic work activities (i.e., baseline activities), as well as, closing open corrective actions assigned to different departments to resolve the condition reports (i.e., corrective action workload). Beyond the identified resilience threshold, the stress exceeds the station's ability to operate successfully and there is an increased likelihood that a consequential event will occur. A performance indicator is proposed to reduce the likelihood of consequential events at nuclear power plants.

Cables Condition Assessment for Circulating Water Pump & Condenser Extraction Pump (발전소 순환수 및 복수 계통 케이블 건전성 평가)

  • Ha, C.W.;Han, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.614-615
    • /
    • 2007
  • There are roughly a hundred types of cables in power plants. The distribution of circuits in a nuclear plant is comprised of 20% instrument cables, 61% control cables, 13% AC power cables, 1% DC power cables, and 5% communication lines. In the nuclear power plant, medium voltage cables are generally included in the scope of systems reviewed for safety and are included in a plant's maintenance program. Medium voltage cables provide power to many critical components in plants, including feed water pumps, circulating water pumps, and condensate pumps. Among these cables, high temperature sections of cables feeding electrical power to the circulating water pump and the condenser extraction pump were found. The evaluation for these cables is performed to find the maximum allowable current and temperature. The result shows that the load current flowed about 85% of the allowable current ampacity, and the temperature of conductor at full load current did not exceed the limited temperature. Therefore, existing cables for circulating water pump and condenser extraction pump system are going to be used during design life.

  • PDF

An Experimental Study on Water Absorbtion Characteristics of Generator Stator Bar Insulation by Cooling Water Temperature in 500MW Capacity Power Plant (500MW급 화력 발전기 냉각수 온도에 따른 고정자 권선 절연재의 흡습 특성에 관한 실험적 연구)

  • Bae, Yong-Chae;Kim, Hee-Soo;Lee, Doo-Young;Lee, Wook-Ryun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.8
    • /
    • pp.1392-1397
    • /
    • 2008
  • The mechanical integrity of generator stator windings is one of the critical point because the electric power is generated and conducted to power system through these windings. De-mineralized water is used to cool stator bars during the normal operation of generator in large power plants because the water cooled method has highest cooling efficient. Water absorption of bar insulation is progressed by several causes such as generation of water leak path by corrosion, delamination of insulation by vibration, and inadequate water treatment, etc.. Reliable water absorption diagnostics of generator stator bar is important to ensure the availability of power plant and to reduce maintenance cost by generator accident. It is described that the water absorption characteristics for generator stator bar insulation used in 500MW capacity standard fossil power plant by cooling water temperature. It is verified that the management of stator cooling water temperature is one of the important factors to decrease water absorption rate of generator stator bars.