Practical Issues in Application of RFID to Pipeline Construction and its Benefit Analysis

  • Yun, Ki Cheol;Oh, Chi Don;Cho, Nam Ho;Kim, Kyong Ju;Park, Chan Sik
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.2
    • /
    • pp.1-7
    • /
    • 2014
  • Radio Frequency Identification (RFID) has been applied to the construction industry for improving the efficiency of material and process management. Most RFID-related studies have focused on building or plant construction. The application of RFID has been limited in pipeline construction projects where materials are stored and stacked across a large construction site. This paper investigates practical issues in pipeline construction, improves the read rates of RFID tags, and tests their utility by putting them into practice. This paper demonstrates the benefits that may be expected with the use of improved RFID tags and the development of an automated pipeline construction management system. As a result, pipeline construction management time decreased by 28 hours per month compared to the conventional method. Cost decreased by about 26%.

Research on the constructability of mechanical splices in Nuclear Power Plant in Korea (국내 건설원전의 기계적철근이음 공법 적용성 분석)

  • Bang, Chang-Joon;Lee, Byung-Soo;Jeong, Young-Hwan;Lim, Sang-Joon;Park, Jong-Hyuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.13-14
    • /
    • 2013
  • Mechanical splices has been applied in nuclear power plant according to ASME(American Society of Mechanical Engineering) and ACI(American Concrete Institute) Code requirements. In particular sleeve with ferrous filler metal splices and cold roll formed parallel threaded splices have been used in domestic nuclear power plants. The objective of this study is to find out the constructability of the mechanical splices which had been used in Korea nuclear job site and to review the technical trends in the near future.

  • PDF

Development Portable Pipe Spool Location-Confirm System Based UHF RFID (UHF RFID기반 이동형 파이프 스풀 위치 인식 시스템 개발)

  • Kim, Jinsuk;Shin, Yongtae
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.3 no.10
    • /
    • pp.329-336
    • /
    • 2014
  • Pipe spool is the most important element of plant equipment in plant construction site. Currently, the plant construction site manage the pipe spool location and usage history by handwriting. Frequently, the pipe spool is moved to unpredictable places by field workers in many construction sites and in cases like this, the pipe stool is replaced with another similar pipe spool. Since it's hard to determine the exact location of some of the pipe spools, it takes unnecessary time and labour to find the missing pipe spools, which proves that stock management is not under control. The purpose of our system is to make the identification of real-time location of the field pipes possible by attaching UHF RFID tags to the pipe spool, which will be used to connect with UHF RFID reader and antenna on vehicles. A field test conducted by the proposed system resulted in the success rate of 98% and the missing 2% was recuperated by hands-on correction, which proved that stock management through the proposed method can be 100% effective. The proposed system is expected to reduce labour costs and make stock control of assets possible, as well as applicable to similar stock management environments.

Application Case of Test Construction of Hydro-Seeding Measures with Seed-Fertilizer-Soil Materials on the Slopes Along the National Road Between Munduk and Wubokgu (문덕우복구간 국도비탈면 종비토뿜어붙이기 시험시공 적용사례)

  • Jeon, Gi-Seong;Woo, Kyung-Jin
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.10 no.6
    • /
    • pp.130-138
    • /
    • 2007
  • To protect the surface of ground-cutting slopes occurring at the national road substitute detour [roundabout road]construction jobsite between Munduk and Wubokgu within the jurisdiction of Pohang-si and environment-friendly road construction, a test execution of re-vegetation measures on the major slopes was done and the results are as follows : As a result of finding out the number of sprouting individuals on the test construction site, the average number of sprouting individuals on the three test spots by the method of revegetation measures D, revegetation measures A, and revegetation measures B was 1,292 number of per square meter, 1,190 number of per square meter, and 1,095 number of per square meter respectively, which statistics were higher than those of test spot by the revegetation measures C. As a result of finding out living plant's breeding index [weight in dried state], the average dried weight of living plant at the test spot by the method of revegetation measures B, in case of foreign herbal species, was the highest marking 8.96 grams per square meter, and the next was 6.86grams per square meter by the method of revegetation measures D, and the next after was 6.80 grams per square meter by the method of revegetation measures A, and the last 5.93 grams per square meter by the method of revegetation measures C. As a result of finding out the covering degree on the slopes, the same average covering degree of 80% and 77.5% in revegetation measures A and revegetation measures D individually, which showed a somewhat higher covering degree than those of revegetation measures B and revegetation measures C. As a result of finding out appearing plants on the test construction site, seeding plant life was found to be sprouting on all test spot while native and foreign herbal species and herbaceous plant as well as shrubs were growing in good harmony with each other. However, in case of revegetation measures B and revegetation measures C method, foreign plant species are dominantly growing. As a result of inspecting rifts on the slopes and the excavated state by water, there existed cracks in some of base materials only in revegetation measures C method applied spot.

Pressuremeter Test in YULCHON Combined Cycle Power Plant (율촌 복합화력발전소 공내 재하 시험)

  • Lee, Yong-Gil;Park, Kyung-Ho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.2 no.1
    • /
    • pp.5-13
    • /
    • 2001
  • The purpose of this paper is to present the pressuremeter test result and analysis for Yulchon Combined Cycle Power Plant(CCPP) site. The CCPP site is old backfill area with the hillcut materials obtained from the borrow sources near the mountains. The geology of this area consists of 6-layers from the ground level such as hillcut material, dredged clay fill, silty sand, original marine clay, weathered rock, soft rock, etc.. The pressuremeter test has been carried out with three different probe, in size and membrane type for all layers except the clay layers. The cone penetration test has been also carried out to collaborate with the pressuremeter test in the hillcut material layer.

  • PDF

The Study on the Improvement of Environmental Assessment Method through Analysis of Environmental Investigation Results of Taean Thermal Power Plant (환경영향평가와 사후환경조사의 비교에 관한 연구 - 태안화력발전소 사례분석 -)

  • Chun, Sang-Ki;Lee, Sung-Chul
    • Journal of Environmental Impact Assessment
    • /
    • v.9 no.1
    • /
    • pp.61-74
    • /
    • 2000
  • This study compares the results of environmental impact assessment with the results of post-environmental investigation, using the case of Taean thermal power plant construction. The atmospheric and water qualities were not greatly changed before and after the construction of the power plant. However, the site of the highest concentration predicted by the atmospheric quality modeling in environmental impact assessment was different from that after operation of 4 power plants. There was also a difference in the diffusion range of thermal discharge water between the measured result(1km) and the predicted value(1.5km) with the model. Thus, environmental impact evaluation should be based on long-term (more than a year) environmental monitoring data. For the modeling of atmospheric quality and numerical thermal discharge water diffusion, appropriate models for each plant should be selected and the numerical modeling should be accompanied by computer simulation, wind tunnel test, etc. Moreover, environmental evaluation should focus more on the degree of impact on surroundings than the prediction of changes in surroundings caused by operation of plants.

  • PDF

Digital Pen System for Inputting the Actual Amount of Labor Input at Construction Site (건설현장의 실투입 노무량 입력을 위한 디지털펜 시스템)

  • Kim, Daewon;Kim, Tae-Yong;Shin, Yoonseok;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.133-140
    • /
    • 2016
  • The amount of labor input in a construction project is used as source data to estimate construction cost and to understand the productivity of the construction industry. However, there is a significant difference between the standard of estimation and the actual amount of labor input, and a plan is needed to resolve this problem. For this reason, to establish a system with which the actual amount of labor input can be inputted in a more accurate and simpler manner, a new method is proposed in this study. In the new method, a digital pen is used to minimize the difference from traditional handwriting on paper using a pen, and eliminate the redundant input of information. This study is expected not only to reduce the actual amount of labor input but also to contribute to the productivity of construction cost estimate through the sharing or utilization of the information on the web.

Analyzing Site Reliability for Residential, Civil and Plant Projects using Lean Construction Principles (린 건설에 기초한 국내 건설 공사의 시공 계획 신뢰도 평가 및 분석)

  • Koo, Bonsang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.655-664
    • /
    • 2008
  • Lean Construction recommends implementing site production management by measuring the reliability of daily production tasks, collecting the causes for failure of incomplete tasks, and identifying problems in the existing process based on the collected data. Although many research projects have been performed to introduce Lean Construction in Korea, there are not many cases in which day-to-day site production operations has been stringently evaluated based on such methods. This paper introduces three cases in which such techniques were implemented on a residential, civil infrastructure and plant project. On each project, process maps were created with the superintendents and daily production meetings were held for two weeks. Consequently, the average PPC for the three projects was 79% for PPC and 16% for PAT. In addition, the majority of the failures were due to 'Directive/Plan' and 'Prerequisites.' The results show that project stakeholders (owners, contractors, etc.) lack the ability to plan ahead and keep to their plans, and also lack the capability to synchronize workflow between themselves. The results also reveal that project participants need to be more proactive in solving process problems on site and also need to be better educated in Lean concepts and methodologies.

A Study on the Test Bed Evaluation for the Ecological Restoration of Unused Road - Focused on the Experimental Construction Site in Young Dong Province of GyungBu Expressway(Seven years after construction.) - (폐도로 생태복원을 위한 시험시공지 평가 연구 - 경부선 영동군 황간지역 시험시공지에 대한 시공 후 7년 시점의 추적조사 -)

  • Jeon, Gi-Seong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.19 no.5
    • /
    • pp.47-57
    • /
    • 2016
  • In the recent years, the incidence of abandoned concrete roads have been increasing rapidly due to road improvements and facilities route construction, these abandoned expressway and unused roads are scattered throughout the country but the management system is not clear, they does not be an effectively managed because there is no maintenance cost. In response to these social concern and expectation, the Korea Expressway Corporation that is management authority of the expressway is developing policy initiatives and various projects to restore the closed road to ecological for eco-friendly projects of the existing expressway. And as part of these projects, Hwanggan IC unmanaged abandoned concrete roads restoration project was done and it was conducting monitoring for ecological restoration that is not one-off but sustainable. After test construction over seven years at the time, test construction of four ways enforced but the boundaries have become blurred over time. And Pinus koraiensis, Callicarpa dichotoma and Sorbaria stellipilla var. typica planted in the site are dominating, else Amorpha fruticosa and Indigofera pseudotinctoria sowed are dominating. Invasive species is that Robinia pseudoacacia was growing in the colony. Over monitoring result time, the vegetation was taking root and the ecosystem was being restore. But the disturbance of vegetation happens due to planting of tree species that doesn't fit in the restoration area and advent of ecosystem Disturbing Species. The study will be providing a basic data that identify change of plant environment by monitoring of the site and soil environment during June to November 2016 and secure an objective evaluation data by analyzing the effects of ecological restoration for revegetation test bed evaluation for ecological restoration of expressway in ecological restoration construction in later.

A Study on modular construction method in military facilities (모듈러 공법을 적용한 군시설공사의 개선방안에 관한 연구)

  • Park, Jae-Sig;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.642-647
    • /
    • 2006
  • Recently Ministry of National Defense is reconstructing old facilities using modular construction method for enhancing soldiers' quality of living. In the future, the use of modular construction method is expected to be increased. But in beginning stage as ROK military facilities that was built by modular was not designed and constructed efficiently, problems for pilot projects need to be analyzed by phases and construction methods should be improved. For the maximized efficiency, design should be made to minimize on-site works, factory automation in an assembly plant should be installed for the better productivity, roads that will be used for transportation should be checked, and joint and connection methods between modules in on-site assembly should be improved for a better quality.