• Title/Summary/Keyword: Plant Construction site

Search Result 224, Processing Time 0.028 seconds

Fine dust(PM10) emission calculated of Dong-Hae harbor around area using inverse modeling technique (역모델링 기법을 이용한 동해항 주변지역 미세먼지 배출량 산출)

  • Kim, Ji-Hyun;Park, Young-Koo
    • Journal of the Korean Applied Science and Technology
    • /
    • v.32 no.4
    • /
    • pp.649-660
    • /
    • 2015
  • Data obtained from the Calpuff inverse modeling estimate the emission amount of pollutants, and enable to establish the aim for reduction through the comparison of various cases. This study pursued to accumulate the fundamental data by the Calpuff inverse modeling for five areas in the vicinity of Donghae harbor, which focused on reduction of atmospheric fine dust. As a result of evaluation of the allowed emission amount for local sites, site-D required the most reduction, $4.95{\mu}g/m^2{\cdot}S$, based on the atmospheric guideline, $50{\mu}g/m^3$. The theoretical mitigation could decrease the average concentration of PM10 to $42.6{\mu}g/m^3$ for the study field (Donghae waste water treatment plant). Modeling only for site-A emission showed the potential concentration around the residential area of Donghae harbor, $40{\sim}50{\mu}g/m^3$. However, it will rise over $50{\mu}g/m^3$ with the addition of background level. Therefore no more emission would be allowed. Site-B including commercial area and unpaved field required the reduction of $0.11{\mu}g/m^2{\cdot}S$ due to vehicles and fugitive dust. Site-C and E did not emit additional pollutants.

The volcanic aspect on determining Site of nuclear power plant in Indonesia: Gap analysis between standard and regulations

  • Widjanarko;Budi Santoso;Rismiyanto;Kurnia Anzhar;Joko Waluyo;Gustini H. Sayid;Khusnul Khotimah;Nicholas Bertony Saputra;Agus Teguh Pranoto;Hadi Suntoko;Siti Alimah;Sriyana;Roni Cahya Ciputra;Alfitri Meliana
    • Nuclear Engineering and Technology
    • /
    • v.56 no.7
    • /
    • pp.2875-2880
    • /
    • 2024
  • The development of nuclear power plants is in three phases. The first phase is a consideration before the decision on the NPP construction program is approved, the second phase is the preparatory work for making contracts and preparing for the construction of NPP after the NPP construction policy is approved, and the third phase is contracting, licensing and building the first NPP. As a volcanically active country, Indonesia contains over 130 active volcanoes that are part of the Pacific Ring of Fire. The volcanic aspect is one of the safety factors considered while deciding the location of an NPP. Research on the potential of natural external risks to the determination of nuclear power plants in Indonesia, including the volcanic aspect, has been conducted based on the safety reference or safety guide of the IAEA and the Nuclear Energy Regulatory Body (BAPETEN) Regulation. Due to technological advancements, safety needs have evolved so the existing Indonesia National Standard (SNI) must be updated to comply with BAPETEN regulations. The substance in SNI 18-2034-1990 relating to volcanic features seems less relevant in actual conditions, given that more complete and exact criteria for determining a site guarantee the safety and health of residents and surrounding the environment site. The study intends to conduct a gap analysis of volcanic issues in SNI and volcanic regulations. The method used is identification requirements for volcanic aspects in SNI 18-2034-1990 about Determining Site of Nuclear Reactor Guidance with BAPETEN Chairman Regulation (BCR) number 4 of 2018 about Nuclear Installation Site Evaluation Safety Provisions and BCR number 5 of 2015 about Evaluation of Nuclear Installation Sites for Volcanic Aspects, and analysis uses a qualitative method of inductive techniques. The outcome of this research applies to suggesting a revision of SNI number 18-2034-1990, especially the volcanic aspect.

Pilot Test of Grid-Type Underground Space Considering Underground Complex Plant Operation (지하 복합플랜트 운영 중 확장을 고려한 격자형 지하공간 파일럿 테스트)

  • Chulho Lee
    • Tunnel and Underground Space
    • /
    • v.33 no.6
    • /
    • pp.472-482
    • /
    • 2023
  • The grid-type or room-and-pillar method is applied for the purpose of mining horizontally buried minerals. In this study, design and pilot test were performed to apply the room-and-pillar method which uses natural rock as a rock pillar to the construction of underground space. The area where the pilot test was conducted was in stone mine and had good rock conditions with an appropriate depth (about 30 m) to apply the pilot test. The pilot test site was selected by reviewing accessibility and ground conditions and then site construction was performed through detailed ground investigation and design. The pilot test was designed with a column shape of 8×8 m and a cross-section of 8×12 m. The blasting pattern was determined through test blasting at the site, and blasting of 3 m excavation with 89 holes was performed. Through field observations, the average width of 12.5 m and the average height of 8.3 m were measured. Therefore, it is possible to proceed similar to the cross-sectional shape considered in the design.

Golf Course Construction at an Abandoned Lime Mine - Case Study of the Ostar Danyang Golf Course - (석회석 폐광산 지역을 활용한 골프코스 건설 -오스타 단양 골프코스의 사례연구-)

  • Lee, Kwang-Jae;Park, Tae-Youn;Joo, Young-Kyoo
    • Asian Journal of Turfgrass Science
    • /
    • v.24 no.2
    • /
    • pp.218-224
    • /
    • 2010
  • The purpose of this case study is to analyze the environmental and sociological impacts on a golf course construction at the damaged area of a previous limestone mine. Due to a long term of the open-pit mining, that site had been abandoned with geographical and ecological destruction before it was renovated to Ostar Danyang public golf course. This study is focused on the review of restoring the ecosystem through golf course construction procedures. Literature surveys of restoration through golf course construction in Japan and Canada were analyzed the procedure of utilization of previously existed lime mine. The sociological and environmental changes before and after construction were compared and analyzed. Environmental impacts on geographical, animal and plant ecology, and water quality were not affected or significantly improved after golf course construction from the mining site existed before. The local economy was also improved by increasing employment of resident and tax payment to local government. The construction of golf course could be one of the typical alternatives of ecological restoration of abandoned lime mine. Moreover in this project, minimizing the environmental impacts on surrounding ecosystem was emphasized by a larger size of developing construction. The harmonious lay-out on nature and artificial landscape were also considered a very first stage of construction procedure.

Installation of Meteorological Mast for the Test Bed of Offshore Wind Power (서해 100MW 해상풍력 실증단지 기상타워 구축사례)

  • Ryu, Moosung;Kang, Keumseok;Kim, Jiyoung;Lee, Junshin
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.55.2-55.2
    • /
    • 2011
  • The final site of offshore wind power plant should be decided by comprehensive examination of various conditions such as wind resource, sea depth, geology, grid connection, social circumstance and environmental issue. Wind condition is typically regarded as the most important factor because wind energy increases in proportion to wind velocity and it directly relates to the amount of power output, efficiency of power plant and profitability. Advanced countries in the offshore wind power sector such as Denmark, UK and Germany, they are analyzing wind resource accurately by installing the meteorological mast in the ocean in order to get the optimal type of wind turbine and maximum generation efficiency. Also, it is made much of designing offshore power plant on the basis of actual measurement by met-mast and those wind farms have a chance to get the loan with reduced interest rate in project financing. In Korea, the HEMOSU-1 is installed in the ocean around Wido island to analyze wind resource of test bed of 100MW offshore wind power on october last year. This paper deals with the design and construction procedure of the first met-mast in Korea and also shows the site characteristics of test bed. Therefore, this paper will give useful information to local governments and private business sector who are trying to construct offshore wind farm and it can also be a good reference for the following projects of meteorological mast in near future.

  • PDF

Vegetational Changes of Mt. Nam Park, Seoul (서울 남산공원의 식생변화)

  • 임양재;양금철
    • The Korean Journal of Ecology
    • /
    • v.21 no.5_3
    • /
    • pp.589-602
    • /
    • 1998
  • Mt. Nam (265m), a city park of Seoul, was originally covered with a typical deciduous broad-leaved forests in Central Korea. However, the park forests have been changed the development for various purpose such as the construction of castle wall, road way, broadcasting station, theater, hotel and apartments, in addition, to thoughtless plantation or alien plant introduction. Human population growth from ca. 100 thousands persons less in that time established Seoul as the capital of choseon dynasty in 1394 to ten millions over persons at present, accelerated the vegetational changes of the park. mt. Nam boundary in those days of sunjong (1908) also was much shrinked as much the range of 300 m distance in the northern most to 700 or 800m distance in some places. The actual vegetation of Mt. Nam largely can be classified by floristic composition into two plant communities of Quercus mongolica community and Pinus densiflora community, four plantations of Pinus rigida, Robinia pseudo-acacia, Populus tomentiglandulosa and other tree species, and on mixed forest with native and alien tree species in secondary succession stage (Yim et al. 1987). The restoration movement of Mt. Nam toward to the natural condition of forest or biodiversity is moving now. However, in the movement there are some problems such as the lack of ecological consideration and the undesirable decision of priority in the practice. A warning should be given, especially, on the undesirable plantation of non-native tree species restricting the forest succession, as in the case of southern slope of Mt. Nam. First of all, the most importance in Mt. Nam management is that the restoration for natural forest and biodiversity should be carried on the basis of integrated ecological principles based on the site evaluation.

  • PDF

What Can Radiation Protection Experts Contribute to the Issue of the Treated Water Stored in the Damaged Fukushima Daiichi Nuclear Power Plant?

  • Yamaguchi, Ichiro
    • Journal of Radiation Protection and Research
    • /
    • v.46 no.1
    • /
    • pp.24-31
    • /
    • 2021
  • Decommissioning efforts are underway at the reactor where the accident occurred, namely the damaged Tokyo Electric Power Company (TEPCO) Fukushima Daiichi Nuclear Power Plant (FDNPP). However, a large amount of groundwater flowing into the site has become contaminated with radioactive substances and is stored in tanks on site, which has hampered the decommissioning work. Although the inflow of groundwater has been greatly reduced through measures such as the construction of frost walls, approximately 170 ㎥ of water treated by the Advanced Liquid Processing System (ALPS) is being stored in tanks, each day. The tanks used to store this treated water are expected to become full by around the summer of 2022. It is not easy to get people to understand the efforts of all concerned parties, and providing clear information to these concerned parties is also a challenge. Questions have also been raised regarding whether other alternatives have been fully explored in the ALPS subcommittee. Some people have commented that the answers to the questions raised regarding the biological effects of tritium transmutation are inadequate. Some suspect that the answers are too detailed and incomprehensible, and that the respondents may be manipulating the public with some malicious intent. In any case, each possible plan presents both advantages and disadvantages, depending on the people who are involved. That makes it an ethical and vexing issue that can sway decisions, as perspectives change. While the environmental release plan is scientifically safe, it may represent a painful alternative. On the other hand, a more careful and imaginative approach to the idea of continued storage in tanks or other forms of storage may reveal some troublesome hidden disadvantages. Under these circumstances, experts must be prepared to answer people's questions in a comprehensive and robust manner.

Feasibility Study for Tidal Power Plant Site in Garolim Bay Using EFDC Model (EFDC모형을 이용한 가로림만의 조력발전 위치 타당성 검토)

  • Shin, Bum-Shick;Kim, Kyu-Han;Kim, Jong-Hyun;Baek, Seung-Hwa
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.23 no.6
    • /
    • pp.489-495
    • /
    • 2011
  • Fossil fuel energy has become a worldwide environmental issue due to its effect on global warming and depletion in its supply. Therefore, the interest in developing alternative energy source has been rising. Ocean energy, especially, has gained strength as an alternative energy source for its unlimited supply with low secondary risks. Among all the ocean energy, the west coast of Korea holds the field of large-scale energy development because of its distinctive tidal range. Tidal power plant construction at the sea may expedite multi development effects such as bridge roles, tourism resource effects and adjustability of flood inundation at the inner bay. This study introduces the validity of tidal power plant construction at Garilim Bay in west coast of Korea by examining anticipated hydraulic characteristics using EFDC model. Through EFDC numerical simulations, the feasibility of Garolim Bay as a tidal power plant field has been proved. And the most effective tidal power plant construction would be to install hydraulic turbine in the west side of bay entrance where ebb current is stronger, and install water gate in the east side of bay entrance where the flood current is superior.

The Actual Conditions and Improvement of the Eco-Forests Mater Plan, South Korea (우리나라 생태숲조성 기본계획 실태 및 개선방향)

  • Heo, Jae-Yong;Kim, Do-Gyun;Jeong, Jeong-Chae;Lee, Jeong
    • Korean Journal of Environment and Ecology
    • /
    • v.24 no.3
    • /
    • pp.235-248
    • /
    • 2010
  • This study was carried out to the actual conditions and improvement of the eco-forests master plan in South Korea, and suggested its problems and improvement direction. Results from survey and analysis of limiting factors or constraints in the construction plans of eco-forests in Korea revealed that there were highly frequent problems involving site feasibility, topographic aspect, and existing vegetation. The results of survey on the status of land use indicated that the average ratio of the use of private estate was 29.7%, so then it was estimated that a great amount of investment in purchase of eco-forest site would be required. Results from survey on major introduced facilities showed that there was high frequency of introduction of infrastructure, building facility, recreational facility, convenience facility, and information facility, and that there was low frequency of introduction of plant culture system, ecological facility, structural symbol and sculpture, and the likes. There was just one eco-forest park where more than 500 species of plants grew, and the result of investigation indicated that the diversity of plant species in 11 eco-forest parks was lower than the standards for construction of eco-forest. Results from analysis of the projects costs revealed that investment cost in facilities was higher than planting costs, and that a large amount of investment was made in the initial stage of the project. There was no planned budget for the purpose of cultivating and maintaining the plants and vegetation after construction of eco-forest. The basic concepts in construction of eco-forests were established according to the guidelines presented by the Korea Forest Service; however, the detailed work of the project was planned with its user-oriented approach. Then the construction of eco-forest was being planned following the directions, which would lead to development of a plant garden similar to arboretum or botanical garden. Therefore, it is required that the architect who designs eco-forest as well as the public officer concerned firmly establish the concepts of eco-forest, and that, through close analysis of development conditions, a candidate site to fit the purpose of constructing eco-forest be selected, and also a substantive management plan be established upon completion of construction of eco-forest.

A Fundamental Study on the Influence of Fresh Concrete Quality Properties due to the Cover of Concrete Mixer Truck (콘크리트 믹서 트럭 덮개의 유무가 콘크리트 품질 특성에 미치는 영향에 관한 기초연구)

  • Chae, Young-Suk;Lim, Byung-Hoon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.6
    • /
    • pp.198-204
    • /
    • 2010
  • The cover of truck agitator give in a part to prevent the lower flowing of fresh concrete when the concrete are transported from the ready mixed concrete plant to the construction field. As a result of the question data, it show up a dirty image to the general civil society. Due to the above image, it is predicted to affect the image of the construction company, so we did the site experiment of the flowing, the amounts of air, the temperature change of concrete with the concrete left in the site, to find out the usefulness. Also, for the comparing with this, we got the result by doing the inner experiment with the same condition. As the result of the experiment, the cover of truck agitator affect little to the reduction of slump. The change of the air amount, regardless of the existence of cover, was not effected much in proper level until 60minutes. In addition, The compression strength was proper to the goal design strength until 90minutes regardless of the cover of truck agitator exist or not exist.