• Title/Summary/Keyword: Planning tool

Search Result 1,086, Processing Time 0.028 seconds

Rough Cut Tool Path Planning in Fewer-axis CNC Machinig (저축 CNC 환경에서의 황삭가공)

  • 강지훈;서석환;이정재
    • Korean Journal of Computational Design and Engineering
    • /
    • v.2 no.1
    • /
    • pp.19-27
    • /
    • 1997
  • This paper presents rough cut tool path planning for the fewer-axis machine consisting of a three-axis CNC machine and a rotary indexing table. In the problem dealt with in this paper, the tool orientation is "intermediately" changed, distinguished from the conventional problem where the tool orientation is assumed to be fixed. The developed rough cut path planning algorithm tries to minimize the number of tool orientation (setup) changes together with tool changes and the machining time for the rough cut by the four procedures: a) decomposition of the machining area based on the possibility of tool interference (via convex hull operation), b) determination of the optimal tool size and orientation (via network graph theory and branch-and bound algorithm), c) generation of tool path for the tool and orientation (based on zig-zag pattern), and d) feedrate adjustment to maintain the cutting force at an operation level (based on average cutting force). The developed algorithms are validated via computer simulations, and can be also used in pure fiveaxis machining environment without modification.

  • PDF

Tool-Path Planning Algorithm for NURBS Surface Machining (NURBS 곡면가공을 위한 공구경로 계획 알고리즘)

  • 구태훈;지성철
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.154-157
    • /
    • 2003
  • This paper presents an efficient real-time tool-path planning method for interpolation of NURBS surfaces in CNC machining. The proposed tool-path planning method is based on an improved iso-scallop strategy and can provide better precision than the existing methods. The proposed method is designed such that tool-path planning is easily managed in realtime. It proposed a new algorithm, for regulation of a scallop height, which can efficiently generate tool-paths and can save machining time compared with the existing method. Through computer simulations, the performance of the proposed method is analyzed and compared with the existing method in terms of feedrate. total machining time and a degree of constraint on the scallop height.

  • PDF

An Optimal Tool Selection Method for Pocket Machining (포켓형상가공을 위한 최적공구 선정방법)

  • Kyoung, Young-Min;Cho, Kyu-Kab;Jun, Cah-Soo
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.14 no.7
    • /
    • pp.49-58
    • /
    • 1997
  • In process planning for pocket machining, the selection of tool size, tool path, overlap distance, and the calculation of machining time are very important factors to obtain the optimal process planning result. Among those factors, the tool size is the most important one because the others depend on tool size. And also, it is not easy to determine the optimal tool size even though the shape of pocket is simple. Therefore, the optimal selection of tool size is the most essential task in process planning for machining a pocket. This paper presents a method for selecting optimal toos in pocket machining. The branch and bound method is applied to select the optimal tools which minimize the machining time by using the range of feasible tools and the breadth-first search.

  • PDF

Factory Planner Application for Planning and Scheduling of Factory on Supply Chain (Supply Chain상에서 공장내의 생산 계획 및 스케줄링을 위한 Factory Planner 적용)

  • 오형술;박경종;이충수
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.25 no.4
    • /
    • pp.8-15
    • /
    • 2002
  • This paper proposes a case study to treat planning and scheduling in factory of supply chain. In fact, the planning and the scheduling of a factory are not easily solved because of constraints of facility resources, material requirements, allowed planning times, and so on. However many packages are developed by vendors in Advanced Planning and Scheduling(APS) aspects to solve these problems. Therefore, in this paper, we analyze problems of an electronic company and apply the tool, Factory Planner(FP), to solve problems. The FP, which was developed by if technologies, is very popular planning and scheduling tool in the world. Also, the tool is successfully applied to many fields.

IFC-Based Computational Support Tool for Managing and Using Design Planning Information: Case Application and Evaluation

  • Seo, Jong-Cheol;Kim, In-Han
    • Architectural research
    • /
    • v.13 no.2
    • /
    • pp.3-12
    • /
    • 2011
  • Planning information generated during initial architectural design phases significantly influences subsequent phases, and is implemented into architectural design models during the design process. However, failures to manage and use planning information in Korean design offices remain common. Current design tools that incorporate planning information also do not address the issue of interoperability during the life cycles of buildings. To address these problems, the Industry Foundation Classes (IFC) extension model was developed to accommodate the need to manage and use planning information for cooperation between design offices carrying out multidisciplinary tasks. This paper introduces a purpose-built software tool that implements the IFC model and demonstrates the efficiency of the proposed method with the software tool.

Planning the Korea Information Infrastructure : Models and a Case Example (초고속정보통신망 구축을 위한 기획분석 모형의 개발 및 분석)

  • 전용수;장석권
    • Korean Management Science Review
    • /
    • v.19 no.2
    • /
    • pp.91-124
    • /
    • 2002
  • The use of network planning models and tools is essential for effective KII (Korea Information Infrastructure) planning and analysis in that it will significantly reduce the risk and uncertainty embeded in the development and the provision of future broadband services. The purpose of this study is to develop a theoretical framework and a computer tool for modeling the various aspects of the KII topology and architecture and evaluating the techno-economic feasibility of the KII implementation strategy.

The Development of a Performance Evaluation Tool for Health Promotion Programs of Public Health Center (보건소 건강증진사업 성과평가지표 개발 -금연, 운동, 영양, 절주, 고혈압사업을 중심으로-)

  • 서영준;이동현;손동국;정승원;정애숙;박남수;김주경;이희원;이무식
    • Korean Journal of Health Education and Promotion
    • /
    • v.21 no.2
    • /
    • pp.1-16
    • /
    • 2004
  • The ultimate goal of health promotion programs is to improve the quality of life through promoting community health. Since the performance of health promotion programs are greatly affected by the quality of the planning and implementation process of the programs, the proper quality assessment of the program process is very important. According to existing literature, the tool for assessing the quality of the process and implementation as well as the outcome. However, no assessment tool for the quality of the process of health promotion programs has been developed in Korea. The purpose of the study is to develop a quality assessment tool for the process of health promotion programs being conducted at public health centers in Korea. The quality assessment tool developed in the study consists of the following four domains: strategic planning (14 items), program management (11 items), monitoring and evaluation (13 items), and resources and information (15 items). The strategic planning deals with the function of the planning staff and committees, community data analysis, the feasibility of the program, and the approach methods for attaining the goal of the program. The program management includes items on the qualification and power of the program staff. Monitoring and evaluation deals with the planning and education for monitoring, reporting and communication among program units, and feedback after monitoring. Finally, the resource and information covers the planning and activities for obtaining resources and information, community networking, beneficiaries' response, and consulting activity of the staff.

A Study on Developing Model and Implementation of Intelligent Contents Planning Supporting System(ICPS) in familyHistory (지능형 스토리텔링 콘텐츠 기획지원도구 모델설계 및 구현에 관한 연구 - 가족이야기(familyHistory)를 중심으로 사례연구)

  • Lee, Eun-Ryoung;Kim, Kio-Chung
    • Journal of Digital Contents Society
    • /
    • v.11 no.4
    • /
    • pp.607-614
    • /
    • 2010
  • History centered knowledge based story-telling project planning tool supports the process of story creation in narrative genre about history of families or individuals. Narrative fields not only include drama, mythology, legend, history but also non-verbal epics such as movie, play, ballet and opera. But as verbal epic, this research paper focuses on the family history and individual history of each household. This story-telling planning tool redevelops each genre of story-telling about family history through sampleDB and informationDB, and it is widely applicable in concreting high quality stories in both its content and value. Reduces the time of planning story-telling, and impose minimum expenses in human resources. Content about family history is one of the most the fundamental and renowned contents in Story-telling but planning tool that is easily applicable in creating such content does not exist in statue quo. In this current system lacking creative infra, this research paper seeks to provide a planning tool that public can easily utilize, and by systemizing the tool. it aims to create a creative contents tool model applicable in variety of genres.

Development of Mission Analysis and Design Tool for ISR UAV Mission Planning (UAV 감시정보정찰 임무분석 및 설계 도구 개발)

  • Kim, Hongrae;Jeon, Byung-Il;Lee, Narae;Choi, Seong-Dong;Chang, Young-Keun
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.42 no.2
    • /
    • pp.181-190
    • /
    • 2014
  • The optimized flight path planning which is appropriate for UAV operation with high performance and multiplex sensors is required for efficient ISR missions. Furthermore, a mission visualization tool is necessary for the assessment of MoE(Measures of Effectiveness) prior to mission operation and the urgent tactical decision in peace time and wartime. A mission visualization and analysis tool was developed by combining STK and MATLAB, whose tool was used for UAV ISR mission analyses in this study. In this mission analysis tool, obstacle avoidance and FoM(Figure of Merit) analysis algorithms were applied to enable the optimized mission planning.

Neural network based tool path planning for complex pocket machining (신경회로망 방식에 의한 복잡한 포켓형상의 황삭경로 생성)

  • Shin, Yang-Soo;Suh, Suk-Hwan
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.12 no.7
    • /
    • pp.32-45
    • /
    • 1995
  • In this paper, we present a new method to tool path planning problem for rough cut of pocket milling operations. The key idea is to formulate the tool path problem into a TSP (Travelling Salesman Problem) so that the powerful neural network approach can be effectively applied. Specifically, our method is composed of three procedures: a) discretization of the pocket area into a finite number of tool points, b) neural network approach (called SOM-Self Organizing Map) for path finding, and c) postprocessing for path smoothing and feedrate adjustment. By the neural network procedure, an efficient tool path (in the sense of path length and tool retraction) can be robustly obtained for any arbitrary shaped pockets with many islands. In the postprocessing, a) the detailed shape of the path is fine tuned by eliminating sharp corners of the path segments, and b) any cross-overs between the path segments and islands. With the determined tool path, the feedrate adjustment is finally performed for legitimate motion without requiring excessive cutting forces. The validity and powerfulness of the algorithm is demonstrated through various computer simulations and real machining.

  • PDF