• Title/Summary/Keyword: Planning Costs

Search Result 547, Processing Time 0.032 seconds

A Study on Systematic Layout Planning (체계적설비배치(體系的設備配置)에 관한 사례연구(事例硏究))

  • Yu, Ji-Gil;Sin, Hyeon-Sin
    • Journal of Korean Society for Quality Management
    • /
    • v.14 no.2
    • /
    • pp.61-68
    • /
    • 1986
  • In this modern environment, manufacturing companies must continually persevere in their efforts to solve the problems encountered in the effort to improve productivity and quality while simultaneously reducing production costs. In this paper, we have approached the problem of layout planning by using the Muther' Systematic Layout Planning model (1961). This model applied the "H" company layout problem. In conclusion the "H" company mislayout in plant. We have a compare this model to old method ("H" company present layout), we produced a good result in layout.

  • PDF

A Study on the Calculation of Construction Project Cost of Healthcare Facility Business Plan (의료시설 사업계획서의 건축사업비 산정에 관한 연구)

  • Choi, Kwangseok
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.27 no.2
    • /
    • pp.7-14
    • /
    • 2021
  • Purpose: The purpose of this study is to provide an effective construction project cost estimation tool for preparing a business plan of healthcare facilities which can be practically used for development projects. Methods: In order to provide a tool for calculating construction project costs, this study analyzed the Building and Related Laws, the Building Technology Promotion Laws, the Ministry of Land, Infrastructure and Transport notifications and directives, the Ministry of Trade, Industry and Energy notifications, the detailed guidelines of the Ministry of Strategy and Finance, the Building Service Industry Promotion Acts, various certification standards, actual project budget calculation cases, etc. with advices from related experts. Results: 1) Construction cost is classified into construction costs, architectural design costs, supervision costs, incidental costs, and each sub-element. In particular, since there are many incidental cost items, essential items to be reviewed during planning are derived and costs are calculated according to appropriate consideration criteria. 2) Criteria for Payment calculation mainly applies the construction cost rate method or the actual cost fixed amount method in consideration of the characteristics and scope of work. Implications: There are many calculation factors that need to be applied to the construction project cost. Therefore, it is necessary to organize the calculation process more clearly.

A Programming Model for Employment Planning in a Manufacturing Firm (제조기업(製造企業)의 고용계획(雇用計劃)을 위한 계획(計劃) 모델)

  • Son, Man-Seok;Lee, Jin-Ju
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.2 no.1
    • /
    • pp.85-92
    • /
    • 1976
  • In this paper, the employment planning model is developed which is a decision-making model for determining the optimum employment level with respect to varying net manpower requirement for each planing period such that total cost in a planning horizon is minimized. It is constructed as a nonlinear programming model and a dynamic programming model on the basis of studies in the areas of production smoothing and manpower scheduling. Costs for a planning period are categorized into regular wage cost, hiring cost, and overtime cost. The first is a linear function. The other two cost functions are of quadratic nature. The planning horizon of this planning model is intermediate range (five years) for which a fair planning accuracy can be guaranteed. The model considers learning period for each job class. It is simple and an optimum solution can be easily obtained by direct search techniques.

  • PDF

Valuing Traffic Noise Cost Based on the Damage Cost Approach (피해비용 접근법을 바탕으로 한 소음비용 추정 연구)

  • JUNG, Dongjae;CHANG, Justin S.
    • Journal of Korean Society of Transportation
    • /
    • v.35 no.4
    • /
    • pp.292-306
    • /
    • 2017
  • Traffic noise cost can be assessed either by the damage cost approach or by the avoidance cost method. This paper provides an overview of pertinent studies of these two approaches and shows that the damage cost approach is more universal and reliable than the avoidance cost counterpart. This study then investigated three sub-components to address the damage cost framework. First of all, unit value per person exposed to noise per year was calculated. Secondly, the area exposed to noise was determined using noise prediction equation. Thirdly, the number of people affected by noise was computed by multiplying the number of people exposed to noise with the percentage of people affected by noise. This paper also suggested a simplified equation that represents the relationship between damage costs and noise levels. Finally, the benefits of noise reduction derived from the damage cost method and those from the avoidance cost approach were compared and discussed.

An Estimation of the Congestion Tolls Considering External Costs in Seoul (외부비용을 반영한 도시내 도로의 혼잡통행료 추정: 서울시를 대상으로)

  • PARK, Chanwoon;KIM, Sungsoo
    • Journal of Korean Society of Transportation
    • /
    • v.33 no.6
    • /
    • pp.520-530
    • /
    • 2015
  • This paper formulates the methodologies to estimate optimal congestion tolls from long-run and short-run perspectives and applies them to the highways of Seoul. An optimal long-run congestion toll is estimated with an optimal volume-capacity-ratio to minimize the total costs which consist of two components: road construction and maintenance costs and traveler costs. By contrast, an optimal short-run congestion toll is estimated with a supply-demand equilibrium which is determined by using a speed-flow function and a disaggregate modal choice model. The results of a long-run analysis for the Seobu urban expressway suggest the optimal volume-capacity-ratio of 1.35 and the optimal congestion toll of 503 Won per automobile kilometer. By contrast, those of a short-run analysis for the Mia-ro urban arterial suggest 1.31 and 420 Won, respectively. Although our results are to some degree dependent on the interest rate and time value assumed, one basic conclusion holds up: the congestions toll tested could generate substantial gains in social welfare if applied to Seoul.

Development and Applications of a Methodology and Computer Algorithms for Long-term Management of Water Distribution Pipe Systems (상수도 배수관로 시스템의 장기적 유지관리를 위한 방법론과 컴퓨터 알고리즘의 개발 및 적용)

  • Park, Suwan
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.3
    • /
    • pp.356-366
    • /
    • 2007
  • In this paper a methodology is developed to prioritize replacement of water distribution pipes according to the economical efficiency of replacement and assess the long-term effects of water main replacement policies on water distribution systems. The methodology is implemented with MATLAB to develop a computer algorithm which is used to apply the methodology to a case study water distribution system. A pipe break prediction model is used to estimate future costs of pipe repair and replacement, and the economically optimal replacement time of a pipe is estimated by obtaining the time at which the present worth of the total costs of repair and replacement is minimum. The equation for estimating the present worth of the total cost is modified to reflect the fact that a pipe can be replaced in between of failure events. The results of the analyses show that about 9.5% of the pipes in the case study system is required to be replaced within the planning horizon. Analyses of the yearly pipe replacement requirements for the case study system are provided along with the compositions of the replacement. The effects of water main replacement policies, for which yearly replacement length scenario and yearly replacement budget scenario are used, during a planning horizon are simulated in terms of the predicted number of pipe failures and the saved repair costs.

Life Cycle Cost Estimation for Jangbogo-II Submarines based on Modeling and Simulation Methodologies (M&S기법을 활용한 장보고 II급 잠수함 수명주기비용 추정)

  • Ahn, Jae-Kyoung;Choi, Bong-Wan;Lee, Yong-Kyu
    • IE interfaces
    • /
    • v.23 no.3
    • /
    • pp.221-228
    • /
    • 2010
  • With the development of science and technology, modern submarines are equipped with high technology devices and multi-functioned precise armaments, consequently, acquisition cost as well as maintenance cost of the submarines are getting higher and higher. However, tight defense budget forces navy to significantly reduce military operating and maintenance costs. In this study, the maintenance and operating costs of submarine Jangbogo-II are estimated through M&S (Modeling and simulation) methodologies in order to reasonably and consistently work out the requirement verification system of Jangbogo-II. The maintenance and operating costs of Jangbogo-II along the next 25 years are estimated as 312.65 billion won via engineering analysis methods while 312.69 billion won from PRICE Model, which shows only 0.04 billion won differences as a whole. This study is expected to be able to provide meaningful decision making data for not only short and/or mid term operating planning but military budgeting.

Analysis of Menu Management in Korean Welfare Institutions for Mental - Disorders (한국 정신 요양 시설의 식단관리 분석)

  • Lee, Jin-Mi
    • Journal of the Korean Dietetic Association
    • /
    • v.7 no.3
    • /
    • pp.274-281
    • /
    • 2001
  • The purpose of this study was to improve menu management of welfare institutions for mental-disorders. Special objectives were: to analyze dietitians' special considerations for menu planning in the view of nutrition, recipients' food preferences, and foodservice management; and to interprete menus by food groups and food costs. An open-ended questionnaire was developed and sent to 55 dietitians of welfare institutions for mental-disorders by a fax. Dietitians were asked to write their special considerations for menu planning relating to the nutrition, recipients, and menu management. A total of 46 dietitians responded to the questionnaires. Also, 32 weekly menus were sent to analyze in this study. Results of this study showed that dietitians considered specially energy, proteins, vitamins, minerals, and fats for recipients's health conditions and daily RDA. However, dietitians wanted more information about right menu plan manuals for psychiatric patients. Analysis of weekly menus showed that milk and milk products were th most insufficient serving food group in these institutions. Also, snacks (p<0.05)and milk products (p<0.05) serving was significantly affected by higher food costs. The results implicated that future research on menu development should be necessary for nutritional balanced meal services in welfare institutions.

  • PDF

A Spread Sheet Model for a Long Range Water Supply Planning (장기 용수 공급계획 수립을 위한 스프레드 쉬트 모형)

  • Kim, Sheung Kown
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.12 no.3
    • /
    • pp.153-162
    • /
    • 1992
  • A mathematical model for a long range water supply planning is developed as a dynamic capacitated facility location problem, in which operating costs and two types of fixed costs are considered. The fixed costs are for water supply systems such as dams and reservoirs and for water conveyance systems of waterways or conduits from each water supply points. A spreadsheet model is developed to support the efficiency of user interface and to implement a heuristic solution procedure. The proposed solution procedure utilizes SOLVER tool and it has been applied to a system with fictitious data but with reality and applicability in mind. As a result of the mathematical analysis, not only the most economic construction timings of surface water facilities and distribution systems but also the most economical water supply operating patterns are identified.

  • PDF

Research on Agent System for Dynamic Maritime Transportation Planning (동적 해상운송계획 수립을 위한 에이전트 시스템에 관한 연구)

  • Kang, Moo-Hong;Choi, Hyung-Rim;Kim, Sung-Kwan
    • The Journal of Information Systems
    • /
    • v.21 no.4
    • /
    • pp.185-199
    • /
    • 2012
  • The most of international shipping cargoes are transported by ship and the shipping market has been continuously increasing. However, due to the recent global recession, the volume of trade decreased accordingly, and the competition between shippers to gain a competitive advantage in the shipping market continues deepening. To do this, researches on transportation costs savings as well as ways to improve customer service are needed and recently related researches are being pursued. Car carriers which transport more than 80% of car import and export volume in the world also make a lot of effort in order to reduce transportation costs, but in contrast related researches are seldom fulfilled. In this study, we developed an agent system that supports the efficient transportation of car carriers plan so that the car carriers can increase competitiveness through reduction of the logistics costs. To make this, we researched an algorithm for maritime transportation planning, and also developed a prototype of an agent system which can collect the necessary information in real time and establish a dynamic plan.