• Title/Summary/Keyword: Planning Costs

Search Result 547, Processing Time 0.026 seconds

Guide-line for Developing a Maintainability Program (보전성 경영 프로그램 개발을 위한 지침)

  • 이낙영;김종걸;권영일;홍연웅;전영록;나명환
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2001.06a
    • /
    • pp.269-269
    • /
    • 2001
  • Maintainability refers to the ease with which maintenance work can be done. It involves the process of ensuring that products can be easily and safely maintained and that the maintenance support requirement is minimized. When a product has a reasonably long life, the cost of operation and support during that life can greatly exceed the initial capital cost. The value to the customer of optimizing maintainability should be evident. Some effort and expense applied to achieving a product which can be easily and cheaply maintained will make very significant savings in the life cycle costs. In this paper, the International Standard IEC 60300-3-10, which is the application guide for maintainability, is considered. This standard can be used to implement a maintainability program covering the initiation, development and in-service phases of a product. It provides guidance on how the maintenance aspects of the tasks should be considered in order to achieve optimum maintainability. The elements of a maintainability program, which are maintenance policy and concept, maintainability studies, project management, design for maintainability, analysis and prediction methods, maintenance verification and validation, analysis of life cycle cost, maintenance support planning, and collection and analysis of maintenance data, are fully discussed in this paper.

  • PDF

A Comparative Research on the Reconstruction and Remodeling of Low-rise, Dilapidated Apartment Buildings (노후저층 공동주택의 재건축과 리모델링 사업의 비교 연구)

  • 이효진;김동훈;김진호;임남기
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.05a
    • /
    • pp.75-80
    • /
    • 2002
  • The purpose of this study is to conduct researches on the aspects of reconstruction and remodeling of low-rise, dilapidated apartment buildings in the provinces, using comparative methodologies, consequently coming up with the findings in the following. 1) Unlike the rebuilding projects in which the movement process tends to be made in a bulk (in a simultaneous manner), it turns out that when it comes to remodeling, it would be advisable to attempt moving the inhabitants as a group either by the size of their residence or by the building. 2) Given the peculiarities of the construction management mechanism, remodeling projects might seem disadvantageous on the part of the management on account of inadequate accumulation of information and experience. Hence, based on the impeccable assessment of the current status of the subject buildings from the phase of planning, its imperative to closely look into and take into consideration a variety of direct and/or indirect factors in advance of the implementation. 3) A series of comparative researches from the perspective of economical efficiency that remodeling projects appear profitable considering the overall costs including financial expenses, varied taxes, and so on that will be eventually brought forth during the reconstruction period, and all the more so when allowing for the consequential effects which they ought to have upon the natural and human resources, environmental and ecological condition, business potentials, etc. Amelioration to be desired on the basis of the findings above.

  • PDF

A Computerized Construction Cost Estimating Method based on the Actual Cost Data (실적 공사비에 의한 예정공사비 산정 전산화 방안)

  • Chun Jae-Youl;Cho Jae-ho;Park Sang-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.90-97
    • /
    • 2001
  • The paper considers non-deterministic methods of analysing the risk exposure in a cost estimate. The method(referred to as the 'Monte Carlo simulation' method) interprets cost data indirectly, to generate a probability distribution for total costs from the deficient elemental experience cost distribution. The Monte Carlo method is popular method for incorporating uncertainty relative to parameter values in risk assessment modelling. Non-deterministic methods, they are here presented as possibly effective foundation on which to risk management in cost estimating. The objectives of this research is to develop a computerized algorithms to forecast the probabilistic total construction cost and the elemental work cost at the planning stage.

  • PDF

The Cement Industry in Ethiopia

  • Mulatu, Dure;Habte, Lulit;Ahn, Ji Whan
    • Journal of Energy Engineering
    • /
    • v.27 no.3
    • /
    • pp.68-73
    • /
    • 2018
  • The cement industry is one of the rapidly growing industry in Ethiopia. The average per capita cement consumption of the country has increased from 39kg to 62kg. However, this is still way below than the global average per capita consumption of 500kg. The Ethiopian government is planning to expand its cement industry by upgrading the current cement plants and also opening of new cement plants in order to meet the future demand of the country. Currently, the number of cement plants in Ethiopia has reached to 20. By the year 2025, per capita cement consumption is expected to increase to 179kg. Recently, Ethiopia has become one of Africa's largest market for the cement industry. In addition, Ethiopia has become the major exporter of cement in the Sub-Saharan African region. The Ethiopian cement industry is highly dependent on the use of imported energy sources for its production. This situation has a significant amount of impact on the high production costs of the industry. This paper will try to review the history, production, available resources, the technologies and energy use of the Ethiopian cement industry.

Genetic algorithm-based scheduling for ground support of multiple satellites and antennae considering operation modes

  • Lee, Junghyun;Kim, Haedong;Chung, Hyun;Ko, Kwanghee
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.17 no.1
    • /
    • pp.89-100
    • /
    • 2016
  • Given the unpredictability of the space environment, satellite communications are manually performed by exchanging telecommands and telemetry. Ground support for orbiting satellites is given only during limited periods of ground antenna visibility, which can result in conflicts when multiple satellites are present. This problem can be regarded as a scheduling problem of allocating antenna support (task) to limited visibility (resource). To mitigate unforeseen errors and costs associated with manual scheduling and mission planning, we propose a novel method based on a genetic algorithm to solve the ground support problem of multiple satellites and antennae with visibility conflicts. Numerous scheduling parameters, including user priority, emergency, profit, contact interval, support time, remaining resource, are considered to provide maximum benefit to users and real applications. The modeling and formulae are developed in accordance with the characteristics of satellite communication. To validate the proposed algorithm, 20 satellites and 3 ground antennae in the Korean peninsula are assumed and modeled using the satellite tool kit (STK). The proposed algorithm is applied to two operation modes: (i) telemetry, tracking, and command and (ii) payload. The results of the present study show near-optimal scheduling in both operation modes and demonstrate the applicability of the proposed algorithm to actual mission control systems.

Utilization of SketchUp for Efficient 3D Modeling of Buildings

  • Park, Joon Kyu;Lee, Keun Wang
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.35 no.5
    • /
    • pp.431-438
    • /
    • 2017
  • The information management system for urban planning, urban management and related decision making is increasing an importance in recent years. Especially, the information about 3D buildings in urban area is necessary for urban management related precise location based service. However, it takes a lot of time, effort, and costs to produce 3D modeling data of buildings. These problems have been found in many studies, but the research to solve these problems is still necessary. In this study, we have tested an efficient 3D modeling method of building to solve these problems. SketchUp was used to test 3D modeling methods with OSM(OpenStreetMap) data. The other 3D modeling method using a digital map was tested. The 3D modeling of building data was efficient using PlaceMaker, which can use OSM data. In addition, modeling was possible through simple editing of the digital map and automatic building generation. The efficiency of the research results is presented by comparing with the traditional method based on the regulation and the stadard man power issued by Korean government. These two 3D modeling methods of building tested through the study can be used as basic data for related research and work. Additional studies should be conducted to improve the accuracy of the building model and determine how to obtain height data efficiently.

A Study on the Utilization Status of Community Living Facilities in Rural Area (농어촌지역 공동생활시설 이용실태 고찰)

  • Kim, Kang-Seob;Son, Kwang-Ho
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.13 no.4
    • /
    • pp.91-98
    • /
    • 2011
  • The housing environment of the weak class in rural area is inferior, the elderly ratio is high, and senior citizens whose living by themselves are increasing. This study was to analyze the actual conditions of utilization status, characterization of residency, management method of the federation of construction associate's love house and local government's case, and usage of the village hall. For better study, we reviewed the literatures and conducted field surveys. The purpose of this study is to suggest a development plan of rural community living homes. The results of this study were as follows; First, it is important for proper site of rural community living home plans to select adjacent location in the surrounding medical and welfare facilities(including community facilities). Second, the living space for one person does not need such a space; about $33m^2$ is suitable. Third, it is important to use surplus area to make kitchen garden in the site planning. Also the architectural plans must be considered to minimize the maintenance costs for the sustainability of the house and winter heating expense problem.

″Issues in designing a Knowledge-based system to support process modeling″

  • Suh, Eui-Ho;Kim, Suyeon
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.50-54
    • /
    • 2001
  • Information systems development entails planning, analysis, design and construction phases. The analysis phase identifying user requirements is the most important of these phases. Since unidentified defects in the early phase causes increased work and costs as development proceeds, the quality of analysis results affects the quality of the resultant system. Major tasks in the analysis phase are data modeling and process modeling. Research on building a knowledge-based system for data modeling have been conducted much, however, not sufficiently for process modeling. As a system environment with high user interaction increases, research on process modeling methods and knowledge- based systems considering such environment are required. In this research, a process modeling framework for information systems with high user interaction is suggested and a knowledge-based system for supporting the suggested framework is implemented. A proposed model consists of the following tasks: event analysis, process analysis, and event/process interaction analysis. Event analysis identifies business events and their responses. Process analysis break down the processes of an enterprise into progressively increasing details. Decomposition begins at the function level and ends when the elementary process level is reached. Event/process interaction analysis verifies the results of process analysis and event analysis. A knowledge-based system for supporting a proposed process modeling framework is implemented in a web-based environment.

  • PDF

Evaluation of 2+1 Roads Application to Improve Rural Two-lane Highway in Korea (국내 2+1차로 도로 도입에 따른 교통운영 및 경제적 비용 측면의 기대효과 분석)

  • Chae, Chan Dle;Lee, Dong Min;Cho, Han Seon
    • International Journal of Highway Engineering
    • /
    • v.15 no.3
    • /
    • pp.85-92
    • /
    • 2013
  • PURPOSES: The purpose of this paper is to estimate expected effects on traffic operational and economic aspects of 2+1 roads application in Korea. METHODS : Micro simulation study using VISSIM 5.0 was used to analyze the operation efficiency of 2+1 roads compared to two-lane highways and four-lane highways. Some scenarios for various traffic volumes were set up in order to analyze the effect of 2+1 roads under various traffic situations. Also imaginary road networks were set up for each type of roads. The MOEs to measure the operation efficiency were selected with average travel speed and delay. For analyzing economic effect of 2+1 roads, construction cost of a specific imaginary 2+1 road was compared to construction cost of a four-lane highway with same conditions. RESULTS: The results of study show that a 2+1 road is more effective with 19 percents higher average travel speed and 39 percents lower average delay than a two-lane highway. In the economic analysis, construction costs to construct a 2+1 road are saved as approximately 26.4~40.7 percents when compared to construction of four-lane highway. CONCLUSIONS: It can be concluded that 2+1 roads can improve the traffic operational level of service for two-lane highways and 2+1 roads can be applied as an effective design alternative for higher-volume two-lane highways in Korea.

A New Direct Torque Control Method of Induction Motor for Torque Ripple Reduction

  • Kim, Deok-Ki;Kim, Jong-Su;Kim, Sung-Hwan;Kim, Hyun-Soo;Kim, Won-Ouk;Yoon, Kyoung-Kuk;Oh, Sae-Gin
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.32 no.7
    • /
    • pp.1061-1067
    • /
    • 2008
  • Direct Torque Control[DTC] and Vector Control are the two schemes developed for high performance induction motor drives. DTC based induction motors are being increasingly used in various industrial applications. DTC offers fast torque response and better speed control with lesser hardware and processing costs as compared to vector controlled drives. However, conventional DTC suffers from high torque ripple, current harmonics and low performance during torque transients. In this paper a new Direct Torque Control[DTC] method of induction motor is presented. In comparison with the conventional DTC method, the PWM technique is applied to proposed control method. In this method, decoupling mechanism is not required and the torque, the flux magnitude are under control using PI controllers and generating the voltage command for inverter control. Therefore torque and speed ripple could be reduced in comparison with the conventional switching table DTC.