• Title/Summary/Keyword: Plan repair

Search Result 218, Processing Time 0.023 seconds

Standard Manual for the Diagnosis and Repairing Leakage Cracks of Underground Structures in Apartment Housing - Maintenance Inspection - (공동주택 지하구조물의 누수 균열 진단 및 보수방법 표준 매뉴얼 - 유지관리 점검 -)

  • Kim, Soo Yeon;Lee, Jung Hun;Lee, Sung Jin;Jang, Duk Bae;Oh, Sang Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.343-344
    • /
    • 2018
  • This study proposes a standard method of diagnosis and repair to prevent and maintain the problem of durability deterioration caused by leakage cracks in apartment basement structures in Korea. Following the announcement of the previous maintenance plan section, this is the second part of the study, focusing on inspection of methods for diagnosing and repairing leakage cracks in apartment basement structures. In this thesis, the matters required for the procedures, types, times and equipment of the inspection plan and the inspection methods, records, and decisions required for the actual inspection are described.

  • PDF

Development of Use and Application to Prediction of Lifetime considering of Carbonation & Steel Corrosion (중성화 및 철근 부식을 고려한 콘크리트 구조물에 대한 수명예측기법의 활용기술개발)

  • Kim, Chul-Ho;Kwon, Young-Jin;Lee, Byung-Hun;Choi, Long;Kim, Moo-Han
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1996.10a
    • /
    • pp.218-224
    • /
    • 1996
  • The purpose of this syudy is to set up a proper repair plan and to extend the remaining lifetime of them by measuring the remaining lifetime of reinforced concrete structures quantitatively. This method is based on the actual research on age deterioration, carbonation depth and covering depth of the reinforced concrete structures. Also, it measure the remaining lifetime through quantitatively defining the probability of steel corrosion by the damage of steel corrosion. By doing that, we proceed the proper repair plan after reviewing the possibility of lifetime extension.

  • PDF

Development of the Repair and Rehabilitation Methods for R/C Structures (철근콘크리트 구조물의 보수 보강 신기술 개발)

  • Sim, Jong-Sung;Hong, Young-Kyun;Choi, Long;Im, Chang-Duck
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1995.04a
    • /
    • pp.207-211
    • /
    • 1995
  • As the construction industry has been developed since 1970, there is a great needs to develop the methodology for repair and rehabilitation of the damaged reinforced concrete structures. Numerous materials which are currently used in construction field without any regulations are examined in terms of their serviceabilities and effectiveness. Structural behavior of repaired beams are investigated both statically and dynamically. This paper summarize the overall research plan, which is sponsored by KICT, in 1994.

  • PDF

Analysis of the Breakdown repair time of the Building Components in Public Rental-Housing Types (공공임대주택 유형별 부재의 사후보전 수선시기 설정연구)

  • Lee, KangHee;Ahn, YoungHan;Chae, ChangU
    • KIEAE Journal
    • /
    • v.13 no.6
    • /
    • pp.129-136
    • /
    • 2013
  • The rental housing has played a key role to supply a decent living space for the low-income households. The owner of the rental housing should maintain and manage the building physical condition. On the other hand, rents should use the housing without any damage and pay a certain fare for the rent. A rent is classified into two types : private and public. The public rent is mainly to supply a living space for non-available home owner with a low-rent fare. Many of public rent are built and supplied by the public institution or local government. The supplier would take a responsibility to maintain the building and components, reflected by the maintenance plan and repair scope. In this paper, it aimed at providing the repair time in building components of the public rental housing such as lighting, electrical cable, paintings and etc.. The repair time is analyzed with three calculation methods which are solved by the probability and empirical approach. Results are as follows : First, the repair time of the electrical facilities are maintained with 11yr, 10yr and 7 in permanent, public and redevelopment rent respectively. The roof proof has a repair time with 14yr, 11yr and 8 in permanent, public and redevelopment rent housing respectively. Second, Most of the components has a prior length of the repair time in permanent, public and redevelopment rent sequently. There is a difference in repair time according to the rental types. Therefore, it would continue to research the difference in aspect of the living style, building physics, living consciousness and etc.

The policy issues for the apartment remodeling projects (공동주택 리모델링 정책의 현황과 개선방향)

  • Yoon Young-Sun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.42-45
    • /
    • 2002
  • Building remodeling concept includes maintenance & repair and renovation. We have long-term repair plan and special repair fund system for the apartment maintenance & repair, but they do not operate well. And laws and ordinances are being revised in relation with renovation. However, more policy improvement and assistance are needed in order to activate the apartment remodeling project. Especially preferential loan and tax reduction policy and deregulation of building provisions are the main tasks for the apartment remodeling.

  • PDF

Evaluation of a Traffic Lane Closure and Pavement Repair for a Certain Period (Focusing on the Gimcheon~Sunsan Project) (1차로 전면차단 후 도로포장 보수방법의 효과분석 (김천~선산 사례중심))

  • Ryu, Sung Woo;Park, Kwon-Je;Han, SeungHwan;Choi, InGu;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.18 no.3
    • /
    • pp.11-19
    • /
    • 2016
  • PURPOSES : This study supports the evidence that it is possible to rehabilitate a damaged pavement with a lane closure specifically based on the Gimcheon~Sunsan project. METHODS : The prediction results from the simulation programs were compared with field monitoring, which focused on traffic management planning, congestion (length, time, and passing speed), bypass, and user cost, among others. RESULTS : The research results showed that lane closure application and pavement repair of the aged pavement in Korea were possible, even though the prediction results were minimally different from the field monitoring. The road agency contributes to service life extension of the rehabilitated pavement using this method. CONCLUSIONS : A marginal effect caused by the lane closure was observed on travelling users or vehicles, and the user cost of pavement repair decreased. Therefore, introducing the repair method or rehabilitation in Korea is possible. Information dissemination through various media was properly done to execute the project well. Moreover, the construction area traffic utilized nearby alternative roads. Therefore, improving the repaired pavemen's service life while ensuring that the pavement management agency can provide a road with comfortable user riding quality was possible.

A Study on the Service life of the Building Components in the Apartment Housing (공동주택 구성재의 내용년수 산정방법에 관한 연구)

  • Lee Kang-Hee;Chang Jung-Hee;Chae Chang-U
    • Journal of the Korean housing association
    • /
    • v.16 no.5
    • /
    • pp.67-74
    • /
    • 2005
  • The performance of building should be deteriorated with time while the building would maintain and manage the function and performance to get a living condition. For the efficient maintenance of the building, the repair cycle would be provided and applied during the service-life time. The service-life time of the building components would be needed to determine the repair time and the repair scope. The service-life time of the building components would be calculated with the 1st repair time and the recovery rate of the performance, considering the recovery rate after repaired. In this paper, the 1st repair time would be estimated with the normal probability distribution, choice probability and 3rd quadratic function. The recovery rate of the building components assumes various level according to the research target and utility area. The results of this study are as follows ; first, most of the components of the building work would range about 30 years in the service-life time and the components of the mechanical works range from 28 years to 37 years, those of the electrical works would be about 31 years.

Evaluation of dose received by workers while repairing a failed spent resin mixture treatment device

  • Choi, Woo Nyun;Byun, Jaehoon;Kim, Hee Reyoung
    • Nuclear Engineering and Technology
    • /
    • v.54 no.2
    • /
    • pp.442-448
    • /
    • 2022
  • Intermediate-level radioactive waste (ILW) is not subject to legal approval for cave disposal in Korea. To solve this problem, a spent resin treatment device that separates 14C-containing resin from zeolite/activated carbon and desorbs 14C through a microwave device has been developed. In this study, we evaluated the radiological safety of the operators performing repair work in the event of a failure in such a device treating 1 ton of spent resin mixture per day. Based on the safety evaluation results, it is possible to formulate a design plan that can ensure the safety of workers while developing a commercialized device. When each component of the resin treatment device can be repaired from the outside, the maximum and minimum allowable repair times are calculated as 263.2 h and 27.7 h for the 14C-detached resin storage tank and zeolite/activated carbon storage tank, respectively. For at least 6 h per quarter, the worker's annual dose limit remains within 50 mSv/year; further, over 5 years, it remained within 100 mSv. At least 6 h of repair time per quarter is considered, under conservative conditions, to verify the radiological safety of the worker during repair work within that time.

A Study on the Structural Reinforcement of the Modified Caisson Floating Dock (개조된 케이슨 플로팅 도크의 구조 보강에 대한 연구)

  • Kim, Hong-Jo;Seo, Kwang-Cheol;Park, Joo-Shin
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.27 no.1
    • /
    • pp.172-178
    • /
    • 2021
  • In the ship repair market, interest in maintenance and repair is steadily increasing due to the reinforcement of prevention of environmental pollution caused by ships and the reinforcement of safety standards for ship structures. By reflecting this effect, the number of requests for repairs by foreign shipping companies increases to repair shipbuilders in the Southwest Sea. However, because most of the repair shipbuilders in the southwestern area are small and medium-sized companies, it is difficult to lead to the integrated synergy effect of the repair shipbuilding companies. Moreover, the infrastructure is not integrated; hence, using the infrastructure jointly is a challenge, which acts as an obstacle to the activation of the repair shipbuilding industry. Floating docks are indispensable to operating the repair shipbuilding business; in addition, most of them are operated through renovation/repair after importing aging caisson docks from overseas. However, their service life is more than 30 years; additionally, there is no structure inspection standard. Therefore, it is vulnerable to the safety field. In this study, the finite element analysis program of ANSYS was used to evaluate the structural safety of the modified caisson dock and obtain additional structural reinforcement schemes to solve the derived problems. For the floating docks, there are classification regulations; however, concerning structural strength, the regulations are insufficient, and the applicability is inferior. These insufficient evaluation areas were supplemented through a detailed structural FE-analysis. The reinforcement plan was decided by reinforcing the pontoon deck and reinforcement of the side tank, considering the characteristics of the repair shipyard condition. The final plan was selected to reinforce the side wing tank through the structural analysis of the decision; in addition, the actual structure was fabricated to reflect the reinforcement plan. Our results can be used as reference data for improving the structural strength of similar facilities; we believe that the optimal solution can be found quickly if this method is used during renovation/repair.

A Study on the Efficiency Evaluation for the School Facilities - Focused on the architectural planning evaluation - (노후화 학교시설의 개축성능 평가에 관한 연구 - 건축 계획적 평가를 중심으로 -)

  • Kim, Seung-Je
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.12 no.6
    • /
    • pp.56-67
    • /
    • 2005
  • The purpose of this study is to give the detailed evaluation index which is considered by reconstruction and repair for the school facilities on the ground of the efficiency evaluation result in each plan through analyzing the school facilities to every case classified into the evaluation index such as the school site plan, the site plan, the floor plan. On this study through the detailed evaluation index each case to the school facilities is to get the result of the efficiency evaluation. Through analysing the result, to make an alternative plan of the school facilities which are fit in both the new educational process and the educational state is to give it as a guide.