Journal of the Korean Society for Aeronautical & Space Sciences
/
v.43
no.6
/
pp.548-556
/
2015
The highly maneuverable fighter aircraft such as F-22, F-16 and F-15have the high maneuverability to maximize the combat performance, whereas the high maneuver characteristics might degrade the pilot's mission efficiency due to fatigue's increase by exposing him to the high gravity and, in the worst case, the pilot could face GLOC (Gravity-induced Loss Of Consciousness). The advanced aerospace company has applied the various technologies to improve the pilot's tolerance to the gravity acceleration, in order to prevent the pilot from entering the situation of the loss of consciousness. Especially, the Anti-G Suit(AGS) equipment to protect the pilot against the high gravity in flight could improve the mission success rate by decreasing the pilot's fatigue in the combat maneuver as well as prevent the pilot from facing GLOC. In this paper, a control algorithm is developed and verified to provide an optimal air pressure to AGS according to the gravity increase during the high performance maneuver. This result is expected, as the key technology, to contribute to the KF-X(Korean Fighter eXperimental), project in the near future.
Proceedings of the Korea Concrete Institute Conference
/
2004.05a
/
pp.502-505
/
2004
Now for the first time in Korea pilot project on application of base isolation system to the RC building is carrying out by collaboration with KNHC and DRB dongil. The hybrid-type base isolation system, which is composed of sliding bearings and laminated rubber bearings and can make the resonance period of base isolated buildings comparatively long up to 4 or 5 seconds, is applied to this building. In this paper the overview of this project, the dynamic characteristics of this particular building and the response reduction effect against earthquakes are presented.
This technical reports describes KEPCO's PLC technology and PLC AMI projects. KEPCO has developed PLC and PLC convergence technology. KEPCO's BPL(Broadband over PLC) standard was selected as an IEC International Standard (IEC 12139-1) in 2009. KEPCO conducted a project installing 550,000 smart meters to residential customers finishing in 2010. KEPCO will carry out a PLC-AMI project around country until 2020, as well as many pilot projects to test its PLC convergence technology.
To achieve the required higher efficiency and lower emission performance, Korea's 300 MW IGCC RDD&D (Research Development, Demonstration and Dissemination) project was launched in December 2006 under the leadership of the Korea Electric Power Corporation (KEPCO), with the support of the Korea Ministry of Knowledge Economy. Our research group, KEPCO Research Institute had set-up the a coal gasifier for the pilot test and conducted many experiments for parametric study in this project. Our group focused visualization of pulverized coal injection pattern in the gasifier. Through this study we found that two types of coal burners having different oxygen supply angles can be a source changing gasification condition like temperature.
The purpose of this study is to explore the application sphere of BPM(Business Process Management) to e-trade process using BPM technology and its service architecture in order to expand the usage of e-trade platform which is developing. After close reviewing the current status of trade process, the possibility of BPM application by e-trade process will be analyzed. The result of analysis is that BPM application to local L/C and purchasing confirmation process could be implemented because those processes are very suitable to apply standardized process and can minimize the risk and confusion of users. BPM application to remaining trade process have to be considered by mid-term and long-term project with the reflection of pilot project performance. Also this study suggests a business management model of e-trade process based on BPM technology which is the new IT technology and integrated interface in view of trade community.
Park, Bo-Sung;Lee, Tae-Hyeong;Bang, Hong-Soon;Kim, Ok-Kyue
Proceedings of the Korean Institute of Building Construction Conference
/
2018.05a
/
pp.298-299
/
2018
The construction liability type CM has been introduced in the form of a pilot project through public institutions since 2017 since it was introduced in the term of construction responsibility type construction project management in the Basic Law of Construction Industry in 2011 with the aim of improving the constitution of the Korean construction industry and strengthening global competitiveness. Through the introduction of construction-responsible CM, the government intends to change the paradigm of the overall construction industry, including design and construction, construction costs, disputes between stakeholders, and transparency of business. In this regard, the study aims to compare and analyze the evaluation methods on the bidding guide that public institutions (LH) are currently using to select companies in order to lay the foundations for successful construction of construction-responsible CM ordering methods.
Kim, J.M.;Han, Y.S.;Choi, J.Y.;Kim, S.Y.;Chang, B.H.;Choo, J.B.;Park, C.S.
Proceedings of the KIEE Conference
/
2003.07a
/
pp.491-493
/
2003
전력계통의 유연하고 안정적인 운용을 위한 인버터형 FACTS 기기의 국내 적용에 대한 연구 결과를 토대로 국내 154kV 계통에 적용되는 80MVA급 UPFC pilot plant project가 수행되었다. Project의 결과물로써 80MVA급 UPFC가 강진-장흥 154kV 계통에 제작, 설치되었다. 강진 변전소 UPFC는 각종 성능 시험 및 시운전 절차를 성공적으로 완료하였으며 현재는 병렬 인버터에 의한 강진 모선의 전압 제어 및 직렬인버터에 의한 강진-장흥간의 조류 제어 기능을 수행하며 상용 운전되고 있다.
The Transactions of The Korean Institute of Electrical Engineers
/
v.60
no.11
/
pp.2028-2034
/
2011
Substation Automation System (SAS) based on IEC 61850 is becoming more and more reality in applying power systems. As well, the development of various engineering tools and the convergence with diagnostic systems are underway. To reflect recent advancements in SAS technology, the Korea Electric Power Corporation initiated a 154kV SAS pilot project and a smart power grid business in 2010. In this paper, the authors will summarize the overview and the lessons learned in applying the IEC 61850-based 154kV Main transformer bay IED solutions to these two project.
We consider a problem of intelligent Integration Information system for research ship, and propose a design as one effective solution of the problem. The goals of the proposed design and system are as follows: management of engine, management of ship, researcher's work, education, training, manage schedule of the project, and thus to manage the whole life cycle of the research ship project. These goals are basically to facilitate and implement innovation- and enhancement-related activities which intelligent Integration Information system is fundamentally pursuing.
Hak-Ju Lee;Yoonseok Shin;Wi Sung Yoo;Hunhee Cho;Kyung-In Kang
International conference on construction engineering and project management
/
2009.05a
/
pp.1081-1087
/
2009
An automatic construction system in Korea is now at the stage of the full automation like in Japan, and an actual pilot project is going to be built in 2009. However, in developing a new construction system that has never been implemented before, there is a need to assess the performance and to consider the uncertainty of the system. The program evaluation and review technique (PERT) allows dealing with this uncertainty. Thus, this paper implements an analysis of the process of steel fabrication and makes suggestions for time-related problems arising from the analysis. The time required for steel erection by the automatic system was compared with that in the traditional method. In the result, finding out another construction process and improving robot performance were proposed to resolve the problems. The results will contribute to promoting the development of an efficient system for the new automatic construction system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.