• 제목/요약/키워드: Pile load test

검색결과 551건 처리시간 0.027초

양방향말뚝재하시험의 재하용량 기준 설정을 위한 사례분석 연구 (A study on case analysis for loading capacity standard establishment of bi-directional pile load test (BD PLT))

  • 최용규;서정혜;김상일
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.377-384
    • /
    • 2008
  • In the bi-directional pile load test (BD PLT) for pile load test of Mega foundation, loading capacity specification were not specified exactly. Therefore there are so many confusions and variations of maximum 2 times in loading capacity are come out. In this study, specifications of bi-directional pile load test (BD PLT) were considered. Based on cases of the bi-directional pile load test performed in domestic areas, maximum equivalent test load, test load increasing ratio and sufficiency ratio of design load were analyzed. It can be known that the loading capacity specification of bi-directional pile load test must be defined as 1-directional test load that is established as more than 2 times of design load.

  • PDF

선단지지된 항타개단강관말뚝의 축하중전이거동 (Axial Load Transfer Behavior for Driven Open-ended End bearing Steel Pipe Pile)

  • 임태경;정성민;정창규;최용규
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.589-596
    • /
    • 2002
  • In this study, static pile load tests with load transfer measurement were accomplished in the field. Yield pile capacity (or ultimate pile capacity) determined by load-settlement-time relationship was determined and axial load transfer behavior was analyzed. In the test for the four test piles were behaved as end bearing pile but ratios of skin friction to total pile capacity were 27%∼33%.

  • PDF

산정방법에 따른 단말뚝의 지지력 비교연구 (A Comparative Study on Bearing Capacity of Single Pile Based on Calculation Method)

  • 이영대;심재현
    • 한국농공학회지
    • /
    • 제39권2호
    • /
    • pp.124-133
    • /
    • 1997
  • Pile load test is good for estimating pile bearing capacity, but using this method is limited by time and cost required. Dynamic and static method is more convenient and economical, but confidence of estimated value by dynamic and static method are lower than that of pile load test. After being compared pile bearing capacity data obtained from pile load test with those of other two methods, the results from this study were summarised as follows. For allowable bearing capacity values greater than 175t per pile, bearing capacity acquired from static method was higher than that acquired from pile load test, whereas bearing capacity acquired from pile load test was higher than that acquired from static method for values under 175 per pile. It was that variance of bearing capacity was large when bearing capacity obtained by dynamic method was higher than 250t. Also bearing capacity based on dynamic method was higher than that based on pile load test. Allowable bearing capacity get from dynamic method suggested that carefull precautions are necessary in application for allowable bearing capacity values higher than 2S0ton per pile.

  • PDF

말뚝 기초지지력에 대한 안전율과 신뢰도지수 평가 (Relations of Safety Factor and Reliability Index for Pile Load Capacity)

  • 김대호;이준환
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 춘계 학술발표회 논문집
    • /
    • pp.466-475
    • /
    • 2006
  • Reliability analysis between safety factor and reliability index for driven and bored pile load capacity was analyzed in this study. 0.1B, Chin, De Beer, and Davisson's methods were used for determining pile load capacity by using load-settlement curve from pile load test. Each method define ultimate, yield and allowable pile load capacities. LCPC method using CPT results was performed for comparing with results of pile load test. Based on FOSM analysis using load factors, it is obtained that reliability indices for ultimate pile load capacity were higher than those of yield and allowable condition. Present safety factor 2 for yield and allowable load capacities are not enough to satisfy target reliability index $2.0\sim2.5$. However, it is sufficient for ultimate pile load capacity using safety factor 3.

  • PDF

대구경 말뚝정재하시험 및 하중전이 측정사례 (Static pile load test and load trasfer measurement for large diameter piles.)

  • 최용규
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 말뚝기초 학술발표회
    • /
    • pp.107-141
    • /
    • 2000
  • Large diameter piles can be defined as piles with diameter of at least 0.76 m (2.5 ft). In bridge foundation, large diameter piles have been used as pier foundations and their use has been increased greatly. In this study, static pile load tests for large diameter piles peformed in Kwangan Grande Bridge construction site were introduced. Also, various sensor installation methods for several types of piles (that is, open-ended steel pipe pile, drilled shafts and socketed pipe piles), pipe axial load measuring method, load transfer analysis method and pile load test results (pile-head load - settlement curve, and pile axial load distribution curve along the pile depth) were introduced.

  • PDF

풍화암 소켓 대구경말뚝의 축하중 전이거동 (Axial Load Transfer Behavior of a Large Diameter Pile socketed into weathered rock)

  • 정창규;임태경;황근배;최용규
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 가을 학술발표회 논문집
    • /
    • pp.390-397
    • /
    • 2002
  • In this study, static pile load tests with load transfer measurement for a pile socketed into weathered rocks were performed. Axial load transfers during static pile load test were measured and analyzed. Three large diameter piles socketed into weathered rock were behavior behaved as friction pile.

  • PDF

사례분석에 기초한 말뚝시공법 및 재하시험방법에 따른 하중지지특성에 관한 연구 (A Study on the Load Bearing Characteristics Depending on Pile Construction Methods and Pile Load Test Methods Based on Case Analyses)

  • 홍석우;최용규
    • 한국지반공학회논문집
    • /
    • 제28권4호
    • /
    • pp.5-21
    • /
    • 2012
  • 국내의 경우 종래의 말뚝기초의 설계에서는 주로 선단지지력에만 의존하는 설계가 이루어져 왔으나 현장에서 실제 크기 말뚝에 대한 하중전이측정실험이 이루어진 이후 많은 하중전이측정실험 자료들을 통하여 마찰력이 크게 발휘되는 것이 밝혀져 왔다. 본 연구에서는 항타강관말뚝 및 대구경 현장타설말뚝의 재하시험 시 측정된 축하중전이 사례들을 분석하여 재하시험방법에 따른 말뚝기초의 하중지지양상을 구명하였다. 사례 말뚝들의 평균마찰력 분담율을 말뚝의 종류, 재하시험방법, 상대근입길이, 말뚝의 직경, 지반의 종류 등의 함수로 상관관계를 나타내는 것은 곤란하였다. 평균 마찰력 분담율은 50% 이상을 상회하는 것으로 나타나고 있었으므로 사례 말뚝기초는 대체로 마찰지지말뚝으로 거동하는 경우가 많은 것을 볼 수 있었으며 극히 일부 사례말뚝은 혼합지지말뚝으로 거동하였다.

Large-scale pilot test study on bearing capacity of sea-crossing bridge main pier pile foundations

  • Zhang, Xuefeng;Li, Qingning;Ma, Ye;Zhang, Xiaojiang;Yang, Shizhao
    • Geomechanics and Engineering
    • /
    • 제7권2호
    • /
    • pp.201-212
    • /
    • 2014
  • Due to the sea-crossing bridge span is generally large and main pier pile foundations are located in deep water and carry large vertical load, sea-crossing bridge main pier pile foundations bearing mechanism and load deformation characteristics are still vague. Authors studied the vertical bearing properties of sea-crossing bridge main pier pile foundations through pilot load tests. Large tonnage load test of Qingdao Bay Bridge main pier pile program is designed by using per-stressed technique to optimize the design of anchor pile reaction beam system. Test results show that the design is feasible and effective. This method can directly test bearing capacity of main pier pile foundations, and analysis bearing behaviors from test results of sensors which embedded in the pile. Through test study the vertical bearing properties of main pier pile foundation and compared with the generally short pile, author summarized the main pier pile foundations vertical bearing capacity and the main problem of design and construction which need to pay attention, and provide a reliable basis and experience for sea-crossing bridge main pier pile foundations design and construction.

초고층에서의 현장타설말뚝 재하시험방법 고찰 (The Study of Load Test Method for In-Site Casting Pile In High Rise Building.)

  • 김대학;홍영길;한성무;구웅회;박찬덕
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.385-392
    • /
    • 2008
  • Modern city have had a lot of high-rise building in high standards and multi-level performance. Using of city space reach better stages by using integration. These skyscraper have increased working load on ground. that building is efficiently designed for that soil capacity is well applied. With material side, big size pile, high strength concrete and high strength steel is used for that getting enough lobby space and resisting load increased of high-rise building. limit load test and load transmitted test can make soil capacity optimized. By the way, method of measuring pile capacity is more advanced and bigger. pile type applied by high rise building have underground excavation space, also reflect regional soil property and have some fact reviewed. A lot of high rise building recently is built as land mark in Seoul, Busan and Incheon. about method of measuring capacity of foundation pile, example of construction field is compared and reviewed.

  • PDF

초고용량 양방향 말뚝재하시험(BDH PLT) 수행사례 분석 (A Case Study of High Capacity Bi-Directional High Pressure Pile Load Test)

  • 김상일;이민희;정성민;정은택;최용규
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 춘계 학술발표회
    • /
    • pp.1156-1163
    • /
    • 2010
  • The bi-directional high pile load test(BDH PLT) does not have weaknesses found in the existing bi-directional low pile load test(BDL PLT); it has strong economics, is unbound by load capacity limit and secures quality stability of working piles. In this study, Verification the field found a very high capacity level of stability and reliability of the BDH PLT, as well as outstanding field applicability. Field verifications reaffirmed the advantage of the BDH PLT device, which was capable of loading 90 MN capacities as maximum. It was also found to be durable enough to load high capacity with ease.

  • PDF