• 제목/요약/키워드: Pile installation

검색결과 179건 처리시간 0.024초

Sheet Pile 설치에 따른 SCP개량지반의 거동 (Behavior of SCP Improved Ground with Installation of Sheet Pile)

  • 유남재;박병수;정길수
    • 산업기술연구
    • /
    • 제22권B호
    • /
    • pp.211-218
    • /
    • 2002
  • The paper is to show the behavior of composit ground which is installed with sheet pile in soft soil improved by sand compaction pile. The results of load-settlement relationship, earth pressure, stress concentration characteristics, and final water content were obtained by centrifuge model test. Two cases of tests, installation of sheet pile on the corner and both side of the loading plate for the improved SCP ground which was designed twice of the footing width, were performed for the tests under the vertical and horizontal loading and both side of corner. Finite element program(CRISP) for sand compaction pile using elasto-plastic model and numerical analysis for soft soil using modified cam-clay constitutive equation were compared and analized with the results of model tests. The result of analysis show the increased bearing capacity of soil after, SCP and sheet pile was installed.

  • PDF

연직하중을 받는 무리말뚝의 새로운 설계 방법 (New Design Method for Pile Group under Vertical Load)

  • 이수형;정충기
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 기초기술학술발표회
    • /
    • pp.11-29
    • /
    • 2002
  • Current design of pile group is based on the estimation of the overall bearing capacity of a pile group from that of a single pile using a group efficiency. However, the behaviors of a pile group are influenced by various factors such as method of pile installation, pile-soil-pile interaction, cap-soil-pile interaction, etc. Thus it is practically impossible to take into account these factors reasonably with the only group efficiency, In this paper, a new method for the design of pile groups is proposed, where the significant factors affecting the behavior of a pile group are considered separately by adopting several efficiencies. Furthermore, in the proposed method, the load transfer characteristics of piles and the difference of pile behaviors with respect to the pile locations in group can be taken into account. The efficiencies for the method are determined using the settlement failure criterion, which is consistent with the concept of allowable settlement for structures. The efficiencies calculated from the results of existing model tests are presented, and the bearing capacity of a pile group in the other model test is calculated and compared with that from the test result, to verify the validity of the proposed method.

  • PDF

Incremental filling ratio of pipe pile groups in sandy soil

  • Fattah, Mohammed Y.;Salim, Nahla M.;Al-Gharrawi, Asaad M.B.
    • Geomechanics and Engineering
    • /
    • 제15권1호
    • /
    • pp.695-710
    • /
    • 2018
  • Formation of a soil plug in an open-ended pile is a very important factor in determining the pile behavior both during driving and during static loading. The degree of soil plugging can be represented by the incremental filling ratio (IFR) which is defined as the change in the plug length to the change of the pile embedment length. The experimental tests carried out in this research contain 138 tests that are divided as follows: 36 tests for single pile, 36 tests for pile group ($2{\times}1$), 36 tests for pile group ($2{\times}2$) and 30 pile group ($2{\times}3$). All tubular piles were tested using the poorly graded sand from the city of Karbala in Iraq. The sand was prepared at three different densities using a raining technique. Different parameters are considered such as method of installation, relative density, removal of soil plug with respect to length of plug and pile length to diameter ratio. The soil plug is removed using a new device which is manufactured to remove the soil column inside open pipe piles group installed using driving and pressing device. The principle of soil plug removal depends on suction of sand inside the pile. It was concluded that the incremental filling ratio (IFR) is changed with the changing of soil state and method of installation. For driven pipe pile group, the average IFR for piles in loose is 18% and 19.5% for L/D=12 and 15, respectively, while the average of IFR for driven piles in dense sand is 30% and 20% for L/D=12 and L/D=15 respectively. For pressed method of pile installation, the average IFR for group is zero for loose and medium sand and about 5% for dense sand. The group capacity increases with the increase of IFR. For driven pile with length of 450 mm, the average IFR % is about 30.3% in dense sand, 14% in medium and 18.3% for loose sand while when the length of pile is 300 mm, the percentage equals to 20%, 17% and 19.5%, respectively.

뒤채움 시공순서 및 말뚝 수에 따른 교대 접속부 거동평가 (Evaluation of Behaviors in Abutment Transition Zone Depending on Constrution Orders and Number of Piles)

  • 김웅진;정락교;김대상
    • 한국산학기술학회논문지
    • /
    • 제18권1호
    • /
    • pp.1-7
    • /
    • 2017
  • RAR(Reinforced Abutment for Railways)은 뒤채움을 선 시공하고, 교대를 후 시공하여 접속부의 침하와 교대 수평토압 및 변위를 저감할 수 있는 교대 구조로 교대 구체 및 저판의 사이즈와 말뚝의 설치 수를 줄인 경제적인 교대 구조이다. 본 논문에서는 말뚝 설치 수에 따른 RAR의 성능을 수치 해석을 이용하여 평가하였다. 말뚝의 설치 수를 1~4열을 적용한 RAR을 지반 변형계수를 달리한 조건에 대하여 수치 해석을 수행하고, 그 결과를 동일한 지반 조건에서 기존 교대의 수치해석결과와 비교, 분석하였다. 해석결과 말뚝 설치 수를 증가시키는 경우 접속부 침하저감 효과는 비교적 크지 않았고, 교대수평변위 및 토압 저감에 더 효과적인 것으로 나타났다. 말뚝 설치 열 수가 1~4열로 변할 때 RAR의 수평변위는 기존교대의 26~37%, 수평토압은 59~83%수준으로 말뚝 설치수가 증가할수록 기존교대(말뚝5열)에 비해 수평변위와 토압을 크게 저감할 수 있는 것으로 나타났다. 또한 RAR의 수평 토압은 보강재, 말뚝, 기초저판, 원지반 강성 등의 영향을 복합적으로 받는 것으로 평가되었다.

원심모형 실험을 이용한 압입말뚝에 대한 동적 p-y 곡선 산정 (Development of Dynamic p-y Curve for Jacked Pile by Centrifuge Test)

  • 유민택;권선용;이일화
    • 한국지반공학회논문집
    • /
    • 제32권3호
    • /
    • pp.39-47
    • /
    • 2016
  • 본 연구에서는 말뚝 설치 방법에 따른 동적 p-y 곡선의 차이를 분석하기 위하여, 1g 상태에서 지반 조성 전 설치한 말뚝과 지반 조성이 완료된 후에 1g 상태에서 압입하여 설치한 말뚝, 그리고 40g의 원심 가속도 조건에서 압입시킨 말뚝에 대해 동적 원심모형 실험을 수행하였다. 실험 결과로부터 얻은 각 모형 말뚝의 동적 p-y 곡선의 최대지반반력을 이용하여 동적 p-y 중추곡선(Backbone curve)을 쌍곡선 함수로 나타내었다. 말뚝 설치 방법에 따른 동적 p-y 중추곡선 분석 결과, 40g 조건에서 압입한 말뚝이 1g 상태에서 압입한 말뚝 및 지반 조성 전 설치 말뚝에 비해 말뚝에 작용하는 지반반력이 크게 평가되었으며, 이러한 지반반력의 차이는 깊이가 깊어질수록 작아지는 것으로 나타났다. 일련의 p-y 곡선 결과를 바탕으로 기존에 제안된 현장타설말뚝에 대한 동적 p-y 중추곡선의 적용성을 평가하고, 이를 수정한 압입 및 항타 말뚝에 대한 동적 p-y 곡선 산정식을 개발하였다.

Jet-grouting in ground improvement and rotary grouting pile installation: Theoretical analysis

  • Wang, You;Li, Lin;Li, Jingpei;Sun, De'an
    • Geomechanics and Engineering
    • /
    • 제21권3호
    • /
    • pp.279-288
    • /
    • 2020
  • The permeation grouting is a commonly used technique to improve the engineering geology condition of the soft ground. It is of great significance to predict the permeation range of the grout so as to ensure the effects of grouting. This paper conducts a theoretical analysis of jet-grouting effects in ground improvement and rotary grouting pile installation by utilizing deformation-permeation coupled poroelastic solutions based on Biot's theory and Laplace-Fourier integral transform technique. The exponential function and the intermittent trigonometric function are chosen to represent time-dependent grouting pressure usually encountered in ground improvement and rotary grouting pile installation process, respectively. The results, including the radial displacement, the hoop stress, the excess pore fluid pressure, the radial discharge, and the permeation radius of grout, are presented for different grouting time, radial positions and grouting lengths. Parametric study is conducted to explore the effects of variation of the exponent in the exponential grouting pressure-time relationship on grouting-induced responses. It is expected that the proposed solutions can be used to estimate the permeation range of grouting in ground improvement and rotary grouting pile installation.

간척지에 플라스틱 온실 설치 시의 문제점 분석 및 개선방안 (An analysis of problems and countermeasures in the installation of plastic greenhouse on reclaimed lands)

  • 유인호;구양규;조명환;류희룡;문두경
    • 농업과학연구
    • /
    • 제41권4호
    • /
    • pp.473-480
    • /
    • 2014
  • Upon setting up a dedicated plastic greenhouse for tomato cultivation developed by the Rural Development Administration on the Gyehwa reclaimed land, this study was aimed at analyzing the problems can be occurred in the installation of plastic greenhouse on reclaimed lands as well as finding out solutions for improvement. A relatively cheaper wooden pile was used in the installation in order to supplement the soft ground conditions. Based on the results of ground investigation of the installation site, both the allowable bearing capacity and pulling resistance of the wooden pile with a diameter of 150 mm and a length of 10 m were computed and came out to be 30.645 kN. It was determined that the values were enough to withstand the maximum compressive force (17.206 kN) and the pullout force (20.435 kN) that are generally applied to the greenhouse footing. There are three problems aroused in the process of greenhouse installation, and the corresponding countermeasures are as follow. First, due to the slightly bent shape of the wooden pile, there were phenomenon such as deviation, torsion, and fracture when driving the pile. This could be prevented by the use of the backhoe (0.2) rotating tongs, which are holding the pile, to drive the pile while pushing to the direction of the driving and fixing it until 5 m below ground and applying a soft vibrating pressure until the first 2 m. Second, there exists a concrete independent footing between the column of the greenhouse and the wooden pile driven to the underground water level. Since it is difficult to accurately drive the pile on this independent footing, the problem of footing baseplate used to fix the column being off the independent footing was occurred. In order to handle with this matter, the diameter of the independent footing was changed from 200 mm to 300 mm. Last, after films were covered in the condition that the reinforcing frame and bracing are not installed, there was a phenomenon of columns being pushed away by the strong wind to the maximum of $11m{\cdot}s^{-1}$. It is encouraged to avoid constructions in winter, and the film covering jobs always to be done after the frame construction is completely over. The height of the independent footing was measured for 9 months after the completion of the greenhouse installation, and it was found to be within the margin of error meaning that there was no subsidence. The extent to the framework distortion and the value of inclinometers as well showed not much alteration. In other words, the wooden pile was designed to have a sufficient bearing capacity.

파일드라이버 기계 시공성능 향상을 위한 연직 자동제어기의 개발 (A Development of the Automated Vertical Controllable Device for Improving Construction Performance of Pile Driver)

  • 조창연;이준복;손재호;김한수;조문영
    • 한국건설관리학회논문집
    • /
    • 제7권4호
    • /
    • pp.78-90
    • /
    • 2006
  • 대부분의 건축 토목공사의 기초공사 시 사용하는 기성콘크리트 파일공사의 굴착 및 파일 매입 작업의 경우 국내 시방기준에는 파일을 연직으로 시공해야한다는 것만이 명시되어 있을 뿐, 이에 대한 측정기준 및 시공기준이 제시되어있지 않으며, 대부분의 시공현장에서는 숙련노무자의 경험을 통한 육안측정에 의존하고 있는 실정이다. 본 연구의 목적은 기수행된 PHC 파일 시공성능 향상을 위한 연직 자동제어기 파일롯타입(pilot-type) 연구를 바탕으로 PHC파일 시공 시 균일한 시공품질을 확보하고 작업의 안전성 확보 및 생산성 향상을 위한 파일 연직 자동제어기 프로토타입(prototype)을 개발하는 것이다. 본 연구를 통해 제시된 PHC 파일 연직 자동제어기가 현장에 적용될 경우, PHC 파일 연직도 측정 및 제어의 자동화를 통해 품질 및 안전성 향상이 가능할 것으로 기대된다.

무용접 장대강관말뚝 공법의 항타 및 지지력 특성 (Characteristics of Driving Efficiency and Bearing Capacity for Long Steel Pipe Pile Method without Welding)

  • 백규호
    • 한국지반공학회논문집
    • /
    • 제16권1호
    • /
    • pp.235-241
    • /
    • 2000
  • 기존의 장대강관말뚝 공법들은 말뚝의 용접이음이나 관내토의 제거 작업으로 인하여 공비와 공기가 증가하고 이들 작업이 진행되는 동안 시간효과에 의하여 말뚝의 관입 저항이 증가하여 타입이 어려워지는 등 각종 비경제적인 문제점들을 갖고 있다. 이러한 문제들을 해결하기 위하여 본 연구에서는 새로운 장대강관말뚝 공법을 제안하였으며, 제안된 공법의 시공성과 경제성을 분석하기 위하여 모형말뚝시험을 행하였다. 시험결과 새로 제안된 장대말뚝공법은 기존 공법에 비해 공기와 공비는 절감되고 지지력은 증가시키는 것으로 나타났다.

  • PDF

확장판 선단부착 PHC말뚝 및 볼트 수직이음을 사용한 PHC말뚝의 시공 중 건전성 확인을 위한 동재하시험의 적용성 및 변형시공법 PHC말뚝들의 올바른 검증시험에 관한 연구 (Study on the Applicability of Dynamic Pile Load Test to Check Integrity during Installation of Extension Plate Attached PHC Piles and Bolts Spliced PHC Piles and the Correct Proof Test of the Transformed-installation PHC Piles)

  • 김명학;최용규
    • 한국지반공학회논문집
    • /
    • 제34권12호
    • /
    • pp.115-131
    • /
    • 2018
  • 현장 시험 부지에서 확장판 선단부착 PHC말뚝 및 볼트 수직이음 PHC말뚝에 대한 시험시공을 실시하고 시공중 건전성을 동재하시험으로 확인하고 시공 후 말뚝의 건전성을 직접 확인하였다. 그 결과를 분석하여 확장판 선단부착 PHC말뚝 및 볼트 수직이음 PHC말뚝의 시공 중 건전성을 동재하시험의 건전도지수(${\beta}$지수)로 평가할 수 있는지에 대하여 연구하였다. 이론적으로 말뚝 선단에 매우 인접하거나 선단끝단에서 발생하는 손상(특히 확장판 선단부착구 자체의 변형)은 시험기술의 특성상 건전도지수로 정확한 평가하는 데에는 한계가 있었다. 말뚝의 선단부에 바로 인접해서 발생하거나 말뚝선단 끝단에서의 손상을 PDA시험을 통하여 명확하게 평가하는 데에는 시험기술의 이론에 대한 고도의 지식과 경험이 요구되었다. 다른 볼트 수직이음구로 인하여 실질적인 1차원 파동전달이 용접이음에서와 다를 수 있다는 점, 타격에 의해 발생하는 응력파의 파장이 볼트 수직이음구 높이(약 100mm)보다 클 수 있다는 점, PDA 분석 기능 중 베타 프로세싱(Beta processing)이라는 기능 등이 매우 심도 있는 지식과 경험을 토대로 평가해야만 더욱 정밀한 판단이 이루어질 수 있다는 점 등을 종합적으로 고려할 때 일반적인 건전성 평가기술로 볼트 수직이음의 건전성을 평가하는 데에는 한계가 있었다.