• 제목/요약/키워드: Pier Construction

검색결과 179건 처리시간 0.023초

교각 기둥시공을 위한 매니퓰레이터 엔드 이펙터 설계 (Design of Manipulator End Effectors for Pier Column Construction)

  • 정태일;이상원;이상윤;유지환
    • 로봇학회논문지
    • /
    • 제16권3호
    • /
    • pp.207-215
    • /
    • 2021
  • There is a risk of serious injury to workers who work at height in pier construction process. By using auto climbing formwork system that does not need to dismantle and reinstall formworks, it is possible to improve work efficiency and safety of workers. However, auto climbing formwork system still requires workers to work on a pier for rebar connection works and so on. In order to eliminate works by workers on the pier, robot manipulators with special end effectors are proposed. Through analysis of works on the pier, three specialized end effectors which are a gripper, a rebar coupler press, and a concrete vibrator, are suggested. Also, new pier construction scenario by the suggested system is confirmed using 3d modeling. It is expected that the proposed system and method enables pier construction without workers on piers. It will increase safety and efficiency of pier construction.

Experimental studies of circular composite bridge piers for seismic loading

  • Chen, Sheng-Jin;Yang, Kuo-Chen;Lin, K.M.;Wang, C.C.
    • Steel and Composite Structures
    • /
    • 제12권3호
    • /
    • pp.261-273
    • /
    • 2012
  • This study proposes and examines a circular composite bridge pier for seismic resistance. The axial and flexural strengths of the proposed bridge pier are provided by the longitudinal reinforcing bars and the concrete, while the transverse reinforcements used in the conventional reinforced concrete pier are replaced by the steel tube. The shear strength of this composite pier relies on the steel tube and the concrete. This system is similar to the steel jacketing method which strengthens the existing reinforced concrete bridge piers. However, no transverse shear reinforcing bar is used in the proposed composite bridge pier. A series of experimental studies is conducted to investigate the seismic resistant characteristics of the proposed circular composite pier. The effects of the longitudinal reinforcing bars, the shear span-to-diameter ratio, and the thickness of the steel tube on the performance of strength, ductility, and energy dissipation of the proposed pier are discussed. The experimental results show that the strength of the proposed circular composite bridge pier can be predicted accurately by the similar method used in the reinforced concrete piers with minor modification. From these experimental studies, it is found that the proposed circular composite bridge pier not only simplifies the construction work greatly but also provides excellent ductility and energy dissipation capacity under seismic lateral force.

Performance assessment of precast concrete pier cap system

  • Kim, T.H.;Kim, Y.J.;Shin, H.M.
    • Computers and Concrete
    • /
    • 제13권4호
    • /
    • pp.501-516
    • /
    • 2014
  • The purpose of this study was to investigate the performance of precast concrete pier cap system. The proposed precast pier cap provides an alternative to current cast-in-place systems, particularly for projects in which a reduced construction time is desired. Five large-scale pier cap specimens were constructed and tested under quasistatic monotonic loading. The computer program, RCAHEST (Reinforced Concrete Analysis in Higher Evaluation System Technology) was used for the analysis of reinforced concrete structures. A bonded tendon element is used based on the finite element method, and can represent the interaction between the tendon and concrete of a prestressed concrete member. A joint element is used in order to predict the inelastic behaviors of segmental joints with a shear key. This study documents the testing of the precast concrete pier cap system under monotonic loading and presents conclusions and design recommendations based on the experimental and analytical findings. Additional full-scale experimental research is needed to refine and confirm design details, especially for actual detailing employed in the field.

Structural analysis of circular UHPCC form for hybrid pier under construction loads

  • Wu, X.G.;Zhao, X.Y.;Han, S.M.
    • Steel and Composite Structures
    • /
    • 제12권2호
    • /
    • pp.167-181
    • /
    • 2012
  • Ultra high performance cementitious composite material is applied to the design of multifunctional permanent form for bridge pier in this paper. The basic properties and calculating constitutive model of ultra high performance cementitious composite are introduced briefly. According to momental theory of thin-walled shell, the analytical solutions of structural behavior parameters including circumferential stress, longitudinal stress and shear stress are derived for UHPCC thin-walled circular tube. Based on relevant code of construction loads (MHURD of PPC 2008), the calculating parameter expression of construction loads for UHPCC thin-walled circular tube is presented. With geometrical dimensions of typical pier, the structural behavior parameters of UHPCC tube under construction loads are calculated. The effects of geometrical parameters of UHPCC tube on structural behavior are analyzed and the design advices for UHPCC tube are proposed. This paper shall provide a scientific reference for UHPCC permanent form design and UHPCC hybrid structure application.

프리캐스트 모듈러 피어캡의 구조성능 평가 (Evaluation of Structural Performance of Precast Modular Pier Cap)

  • 김동욱;심창수
    • 콘크리트학회논문집
    • /
    • 제27권1호
    • /
    • pp.55-63
    • /
    • 2015
  • 사전제작 기술은 교량을 더 안전하고 주변과 친화적인 환경을 구축하며 작업 환경에 제한이 있을 경우에도 품질과 내구성을 개선하며 공사를 수행할 수 있다. 콘크리트 충전강관을 이용한 모듈러 하부구조 교각을 제안하였다. 프리캐스트 피어캡은 피어테이블과 프리스트레스를 도입한 프리캐스트 세그먼트로 구성되어 있다. 피어테이블은 매입형 강재를 사용하여 응력의 집중을 완화하였다. 피어캡과 교각은 4개 또는 6개의 CFT기둥으로 연결된다. 피어캡의 전단강도는 피어테이블에서 연장시킨 전단 스터럽에 의해 저항하게 된다. 횡방향 프리스트레스 힘은 사용하중에 의한 인장 응력을 제어하기 위하여 도입되었다. 이 논문에서는 모듈러 구조의 유효성을 정적실험을 통하여 평가하였다. 제안된 피어캡은 설계 요구사항들을 연속 철근과 프리스트레스에 의해 만족시켰다. 모듈러 구조의 표준화는 급속교체 및 교량의 급속시공에 효과적으로 사용될 수 있다.

Large-scale pilot test study on bearing capacity of sea-crossing bridge main pier pile foundations

  • Zhang, Xuefeng;Li, Qingning;Ma, Ye;Zhang, Xiaojiang;Yang, Shizhao
    • Geomechanics and Engineering
    • /
    • 제7권2호
    • /
    • pp.201-212
    • /
    • 2014
  • Due to the sea-crossing bridge span is generally large and main pier pile foundations are located in deep water and carry large vertical load, sea-crossing bridge main pier pile foundations bearing mechanism and load deformation characteristics are still vague. Authors studied the vertical bearing properties of sea-crossing bridge main pier pile foundations through pilot load tests. Large tonnage load test of Qingdao Bay Bridge main pier pile program is designed by using per-stressed technique to optimize the design of anchor pile reaction beam system. Test results show that the design is feasible and effective. This method can directly test bearing capacity of main pier pile foundations, and analysis bearing behaviors from test results of sensors which embedded in the pile. Through test study the vertical bearing properties of main pier pile foundation and compared with the generally short pile, author summarized the main pier pile foundations vertical bearing capacity and the main problem of design and construction which need to pay attention, and provide a reliable basis and experience for sea-crossing bridge main pier pile foundations design and construction.

PC Shell 형식 피어캡의 구조성능 평가 (Structural Performance Evaluation for the Precast Shell type Pier Cap)

  • 신성진;황도규;이재훈;손제국;박동규;유동호
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2010년도 춘계 학술대회 제22권1호
    • /
    • pp.81-82
    • /
    • 2010
  • 교각 급속 시공 기술 개발의 일환으로 피어캡의 프리캐스트화를 위한 설계 및 시공상의 문제점을 분석하였다. 제안된 공법 중 특히 프리캐스트 쉘 형식을 사용하는 방안에 대하여 구조성능을 평가하고 기존 RC 구조와 비교하는 실험 연구를 수행하였다.

  • PDF

철근량 저감을 통한 코핑부 시공성 향상 (Improvement of Constructability of Coping by Reduction of Reinforcement Amount)

  • 박봉식;박성현;조재열
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.1577-1582
    • /
    • 2011
  • Recently rapid construction of bridge is a main interest in construction. A research on rapid construction of pier coping is urgently needed because pier, which is a bridge understructure, directly affect lane reduction and increase of social cost. Precast assembly method and pre-assembly method are the main subjects of rapid construction. But these researches have focused not on reduction of reinforcement amount, but on modifying production method of coping. Reinforcement amount of design specification is as much as that of coping under constructing. So different approach is needed for reduction of reinforcement amount. In this paper, design of pier coping using strut-tie model was proposed for reduction of reinforcement amount and improvement of constructability. Railway bridge pier coping under constructing was analyzed using a finite element method and designed using strut-tie model.

  • PDF

A Case Study on the Assessment of Damaged Cause for the Damaged Reinforced Concrete Pier

  • Chai, Won-Kyu;Kim, Kwang-Il;Son, Young-Hyun
    • International Journal of Safety
    • /
    • 제10권1호
    • /
    • pp.16-21
    • /
    • 2011
  • In this thesis, appearance inspection, compressive strength of concrete test, arrangement of bar inspection, survey, and bearing stress analysis were performed on a damaged coping of reinforced concrete pier to investigate the damage cause. According to the performed a series of inspections, it was found that the coping of pier was damaged during PSC (Pre-stressed Concrete) beam construction. In this thesis, the repair method for damaged pier was studied. The repair procedure used in this thesis was follows : chipping for damaged part, clean by high-pressure, installation of wire mesh, coating of surface hardening, construction of section restoration material, copula grinding, and prevent coating for far-infrared radiation.

  • PDF

Test for the influence of socket connection structure on the seismic performance of RC prefabricated bridge piers

  • Yan Han;Shicong Ding;Yuxiang Qin;Shilong Zhang
    • Earthquakes and Structures
    • /
    • 제25권2호
    • /
    • pp.89-97
    • /
    • 2023
  • In order to obtain the impact of socket connection interface forms and socket gap sizes on the seismic performance of reinforced concrete (RC) socket prefabricated bridge piers, quasi-static tests for three socket prefabricated piers with different column-foundation connection interface forms and reserved socket gap sizes, as well as to the corresponding cast-in-situ reinforced concrete piers, were carried out. The influence of socket connection structure on various seismic performance indexes of socket prefabricated piers was studied by comparing and analyzing the hysteresis curve and skeleton curve obtained through the experiment. Results showed that the ultimate failure mode of the socket prefabricated pier with circumferential corrugated treatment at the connection interface was the closest to that of the monolithic pier, the maximum bearing capacity was slightly less than that of the cast-in-situ pier but larger than that of the socket pier with roughened connection interface, and the displacement ductility and accumulated energy consumption capacity were smaller than those of socket piers with roughened connection interface. The connection interface treatment form had less influence on the residual deformation of socket prefabricated bridge piers. With the increase in the reserved socket gap size between the precast pier column and the precast foundation, the bearing capacity of the prefabricated socket bridge pier component, as well as the ductility and residual displacement of the component, would be reduced and had unfavorable effect on the energy dissipation property of the bridge pier component.