• Title/Summary/Keyword: Periodic Inspection

Search Result 181, Processing Time 0.026 seconds

A Study on the inspection item classified by reinforcement method for the construction slope maintenance (건설공사 비탈면 유지관리를 위한 보강공법별 점검항목에 관한 연구)

  • Kim, Yong-Soo;Chang, Buhm-Soo;Shin, Kwan-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.759-764
    • /
    • 2005
  • With the tunnel to case of the construction slope it executes the periodic maintenance due to an objectivity standard. But, the standard connected with construction slope is not integrated with the important public paper organic enemy and it is duplicated and the standards which conflict are being scattered. Also, it is referred to some specifications simply and the feature which is diffuse appears. Therefore, there is a necessity which it investigates the problem point of the maintenance civil official and it improves rationally and it takes a triangular position a confusedly be standard system. In this research which it sees accomplished the fundamental research against the inspection item classified by reinforcement method for the construction slope maintenance.

  • PDF

Fatigue Assessment of Butt Joint with Weld Defect in Steel Bridge (강교 용접 결함부의 피로평가)

  • Juhn, Gui Hyun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.2 no.1
    • /
    • pp.98-107
    • /
    • 1998
  • There are many weld defects such as surface crack, lack of fusion, and imcomplete penetration in the butt joint of the existing steel bridges. The crack-like defects may significantly reduce the fatigue life of the structure. This paper presents the procedure and the results of the fatigue assessment of the butt joints with weld defect in the existing steel girder bridge. The butt joints with imcomple penetration were instrumented with strain gages to determine the stress histogram under normal traffic. Based on the measured stress histogram the crack propagation analyses were performed for the fatigue assesment. By using the suggested procedure and methodology, one can decide the time of periodic inspection and the necessity of repair of the butt joints with serious weld defects in the existing steel bridge.

  • PDF

A Study on Image Preprocessing Methods for Automatic Detection of Ship Corrosion Based on Deep Learning (딥러닝 기반 선박 부식 자동 검출을 위한 이미지 전처리 방안 연구)

  • Yun, Gwang-ho;Oh, Sang-jin;Shin, Sung-chul
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.4_2
    • /
    • pp.573-586
    • /
    • 2022
  • Corrosion can cause dangerous and expensive damage and failures of ship hulls and equipment. Therefore, it is necessary to maintain the vessel by periodic corrosion inspections. During visual inspection, many corrosion locations are inaccessible for many reasons, especially safety's point of view. Including subjective decisions of inspectors is one of the issues of visual inspection. Automation of visual inspection is tried by many pieces of research. In this study, we propose image preprocessing methods by image patch segmentation and thresholding. YOLOv5 was used as an object detection model after the image preprocessing. Finally, it was evaluated that corrosion detection performance using the proposed method was improved in terms of mean average precision.

Application of Risk-Informed Inservice Inspection for Piping in Nuclear Power Plants (리스크 정보를 활용한 배관 가동중검사 적용)

  • Jin, Young Bok;Jin, Seuk Hong;Moon, Yong Sig
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.7 no.4
    • /
    • pp.31-37
    • /
    • 2011
  • Pressurized Water Reactor Owners Group(PWROG) proposed and applied a risk-informed inservice inspection(RI-ISI) program to alternate existing ASME Section XI periodic inspections. The RI-ISI programs enhance overall safety by focusing inspections of piping at high safety significant(HSS) and locations where failure mechanisms are likely to be present, and by improving the effectiveness on inspection of components because the examination methods are based on the postulated failure mode and the configuration of the piping structural element. The RI-ISI programs can reduce NDE, man-rem exposure, costs of engineering analysis, outage duration and chance of complicating plant operations etc. RI-ISI methods of piping inservice inspection were applied on 3 units(KSNP : Korea Standard Nuclear Power Plant) and are scheduled to apply on the other units. In this paper, we compared and showed the results of the 2 units and we concluded that the RI-ISI application could enhance and maintain plant safety and give unquantifiable benefits.

A Study for Developing of Rail Bridge Inspection Robot (철도교량 자동화 로봇 개발을 위한 기초 연구)

  • Koo, Ja-Kyung;Hwang, In-Ho;Lee, Jong-Seh;Lee, Tai-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.188-193
    • /
    • 2008
  • According to introduce KTX in Korea, rail-road bridge section of KTX was increased approximately 50% of the total length. Bridge is required periodic inspection and check to prevent accident and hazard because various damage which have effects on traffic and replacement of damaged parts is difficult. Specifically, the train as large-scale transportation because accidents led to great damage, preventing these accidents are critical. Well-organized management and maintenance systems are required to prevent the accidents. In the case of roadway bridge, bridge inspection vehicle is used to deploy inspectors in roadway bridge. However, this method requires a lot of time and efforts, and inspectors are exposed to potential hazard. Also, surrounding environment like poor lighting system or electric wire could harm the inspector while repairing. Due to this reason, automatic repairing and inspecting system have been introduced to replace the old methods. Management system of the railroad bridge track for trains uses various advanced equipments, but whereas roadway bridge management system is lacking these efforts. As a result of that, this study looks over the existing management method. and review the method to apply the Bridge Inspection Robot in railroad bridge. Moreover, this study suggests future management technology using inspection robot.

  • PDF

Rate-Monotonic Scheduler with Extended Schedulability Inspection for Hard Real-Time Tesk (경성 실시간 태스크를 위한 확장된 스케줄 가능성 검사를 갖는 비율단조 스케줄러)

  • 신동헌;조수현;김영학;김태형
    • The Journal of the Korea Contents Association
    • /
    • v.4 no.2
    • /
    • pp.50-60
    • /
    • 2004
  • Recently, most of the embedded system is required not only many functions but also real-time characteristics in purpose. In the hard real-time system, especially, strict deadline of periodic task can affect the performance of the system. In this paper, we design and implement the scheduler based on RM(Rate-Monotonic) rule. This scheduler makes feasible patterns based on EDF(Earliest deadline first) rule with extended schedulability inspection before execution, for periodic task-set that has high CPU utilization and then, execute periodic task-set depended on feasible patterns. The feasible pattern formed into EDF rule is capable of the efficiency of CPU up to 100 percentage and by the referenced execution of the feasible pattern is possible of removing the red-time scheduling overhead that is the defect of the order of dynamic assignment rule.

  • PDF

Character Recognition of Low Resolution CCTV Images of Sewer Inspection (저해상도 하수관로 CCTV조사 영상의 문자인식)

  • Kim, Byeong-Cheol;Choi, Chang-Ho;Son, Byung-Jik
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.5
    • /
    • pp.58-65
    • /
    • 2016
  • Recent frequent occurrence of urban sinkhole serves as a momentum of the periodic inspection of sewer pipelines. Sewer inspection using a CCTV device needs a lot of time and efforts. Many of previous studies which reduce the laborious tasks are mainly interested in the developments of image processing S/W and inspection H/W. However there has been no attempt to find meaningful information from the existing CCTV images stored by the sewer maintenance manager. This study adopts a cross-correlation based image processing method and extracts location data of sewer inspection device from CCTV images. As a result of the analysis of time-location relation, it shows strong correlation between the device's stand times and the sewer damages. In case of using this method to investigate sewer inspection CCTV images, it will save the investigator's efforts and improve the sewer maintenance efficiency and reliability.

Development of Health Monitoring System Using Self Magnetization Magnetostrictive Sensor (자기자화자왜센서를 이용한 설비 off-line Health Monitoring 시스템 개발)

  • Kim, Yi-Gon;Moon, Hong-Sik;Kim, Jun;Kim, Ji-Hyeon
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.22 no.4
    • /
    • pp.481-486
    • /
    • 2012
  • This thesis examines the development and application of 'Health Monitoring System' which monitors periodically the state of a pipe of petrochemical plant by using magnetostrictive sensor technology. The existing guided-wave inspection methods cannot be applied to welding part inspection in pipe, and has a limit of precision when applied to general parts because of noise, reflected waves, and so on. This technology uses the information on displacement of a defect through periodic monitoring, which makes more precise inspection, and can be utilized very usefully in a petrochemical plant.

Design Optimization of CRDM Motor Housing

  • Lee, Jae Seon;Lee, Gyu Mahn;Kim, Jong Wook
    • Journal of Magnetics
    • /
    • v.21 no.4
    • /
    • pp.586-592
    • /
    • 2016
  • The magnetic-jack type CRDM withdraws or inserts a control rod assembly from/to the reactor core to control the core reactivity. The CRDM housings form not only the path of the electromagnetic field but also the pressure boundary of a nuclear reactor, and a periodic in-service inspection should be carried out if there are welded or flange jointed parts on the pressure boundary. The in-service inspection is a time-consuming process during the reactor refueling, and moreover it is difficult to perform the inspection over the reactor head. A magnetic motor housing is applied for the current SMART CRDM and has several welding joints, however a nonmagnetic motor housing with fewer or no welding joints may improve the operational efficiency of the nuclear reactor by avoiding or simplifying the in-service inspection process. Prior to the development, the magnetic field transfer efficiency of the nonmagnetic housing was required to be assessed. It was verified and optimized by the electromagnetic analysis of the lifting force estimation. Magnetic flux rings were adopted to improve the efficiency. In this paper, the design and optimization process of a nonmagnetic motor housing with the magnetic flux rings for the SMART CRDM are introduced and the analyses results are discussed.

A Study on the Proper Inspection Cycle Plan Through Reliability Analysis of One-Shot System (One-Shot System의 신뢰도 분석을 통한 적정 점검주기 방안 연구)

  • June-Young Lim;Hyeonju Seol
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.1
    • /
    • pp.48-54
    • /
    • 2023
  • Guided missiles are a one-shot system that finishes their purpose after being used once, and due to the long-term storage until launch, the storage reliability is calculated during development, and performance is maintained through periodic inspections until the life cycle arrives. However, the reliability standards applied in the development of guided missiles were established by analyzing data accumulated by the United States during long-term operation in the country, and since they are different from our environment, the 00 guided missiles that have been deployed in the armed forces for more than 10 years under the premise that there is a difference from actual reliability. As a result of verifying the appropriateness of the current inspection cycle by analyzing the actual reliability of the missile, the necessity of changing the inspection period was derived because it was higher than the predicted reliability. It is proposed to build and utilize a lifespan management system that can systematically collect all data such as shooting and maintenance results by classification, and to establish a reliable reliability standard based on the accumulated data.