Jo Man-Hyun;Ham In-Ki;Park Sang-Kyu;Lee Mi-Ae;Kwon Kyeong-Hak;Woo In-Shik
Plant Resources
/
v.8
no.1
/
pp.48-51
/
2005
Optimmum cultivation period was determined for producing seed bulb of Korean native Allium wakegi Araki in vitro in hydroponic culture. The growth gradually increased during cultivation period. In general, plants grown for 5 months produced significantly the highest bulb number and bulb fresh weight per plant. Raising the cultivation period from 1 to 5 months remarkably increased seed bulb yield.
The maintenance cost in K Steelworks has been continuously increased in proportion to the production cost. However, there seems to be a possibility of reducing cost through the optimization of maintenance actions. The failure types of the equipment in steelworks ate various with different failure cost. Thus the failure rate and cost of each type of failures should be considered simultaneously when the optimum maintenance period is to be determined. It is considered that the equipment undergoes periodic replacement and a specified number of incomplete preventive maintenance actions are performed during a replacement period. Assuming that the time to failure follows a Weibull distribution, the parameters of the failure rate are estimated using the maximum likelihood estimation. The optimal replacement period is determined to minimize the average cost per unit time. As the result of analysis it is suggested that the existing maintenance period for a hot-rolling equipment can be extended significantly.
Kim, Yong-Ha;Woo, Sung-Min;Kim, Mi-Ye;Lee, Sung-Jun;Son, Seung-Ki
The Transactions of the Korean Institute of Electrical Engineers A
/
v.55
no.11
/
pp.498-504
/
2006
This paper describes the simple payback period analysis of small co-generation system based on the existing apartment and building data. First, We investigate apartment and building data more than $2000[m^2]$ using Ministry of Construction & Transportation's computer system. And then we calculate the latent amount of small co-generation system considering gas company and CHP. Second, we classify the latent amount of small co-generation system into office, hospital, hotel, department store, complex building and apartment. Finally, we perform the simple payback period analysis for small co-generation system. The results show the simple payback period of small co-generation system is less then 10 years.
Proceedings of the Korean Powder Metallurgy Institute Conference
/
2006.09a
/
pp.638-639
/
2006
Multilayered coatings on tungsten carbide cutting tools are widely used for enhancing cutting performance. In this paper, we review the CVD TiC/TiCN multilayer as a function of the multilayer period. The TiC/TiCN multilayers in initial stage show preferred (220) orientation but shifts to (200) orientation with decreasing multilayer period. The nanohardness of TiC/TiCN multilayers were found to increase with decreasing multilayer period and shows a maximum of 23.8 GPa at a period = 33.5 nm.
Transactions of the Korean Society for Noise and Vibration Engineering
/
v.18
no.11
/
pp.1170-1176
/
2008
In this study, we propose a new method to control both the beat clarity and beat period in a ring structure. An equivalent ring which satisfies the measured mode condition is determined by using the equivalent ring theory. Theoretical analysis and finite element analysis on the equivalent ring are performed to investigate the effect of the local structural modification on the beat clarity and beat period. Beat clarity and period are improved by attaching asymmetric mass or decreasing local thickness. Through the analysis on the equivalent ring, the proper position and the amount of the local variation are determined to satisfy the required clarity and period condition. All the analysis results are compared and verified by the experiment.
Journal of Korean Society of Industrial and Systems Engineering
/
v.36
no.1
/
pp.58-63
/
2013
Using the known result of the expected busy period for the triadic Med (N, T, D) operating policies applied to a controllable M/G/1 queueing model, its upper and lower bounds are derived to approximate its corresponding actual values. Both bounds are represented in terms of the expected busy periods for the dyadic Min (N, T), Min (N, D) and Min (T, D) or Max (N, T), Max (N, D) and Max (T, D) with the simple N, T and D operating policies without using any other types of triadic operating policies such as Min (N, T, D) and Max (N, T, D) policies. All three input variables N, T and D are equally contributed to construct such bounds for estimation of the expected busy period.
This Study examines the implications for event studies using the daily stock data. The output present the event study results. The event period is defined from 30 days before through 30 days after the event date, and is broken into four "windows" for abnormal return cumulation: the pre-event period, days -30 through -2; dajys -1 and 0, a period commonly investigated for the immediate impact of the event; and the post-event period, days +1 through +30. It shows how firm's information offerings affect the price process and consequent issues. The Patell Z test is an examples of a standardized abnormal return approach, which estimate a separate standard error for each security-event and assumes cross-sectional independence. The generalized sign test adjusts for the fraction of positive abnormal returns in the estimation period instead of assuming 0.5.
This study examines the process to demolish official buildings of Joseon Dynasty in Suwon Hwaseong during Japanese colonial period. King Jeongjo built the new Suwon city and constructed the city fortress. Hwaseong Hawnggung and other official buildings were also built in Suwon Hwaseong. However Those buildings were demolished gradually and lost their identity during Japanese colonial period. The official buildings of Hwaseong Haenggung were classified into nine parts. 1) Central area of Hwaseong Haenggung 2)Nangnamheon(落南軒) 3)Uhwaguan(于華館) 4)Namgunyeong(南軍營) 5)Bukgunyeong(北軍營) 6)Gangmudang(講武堂) 7)Yiah(貳衙) 8)Jungyeong(中營) 9) Hoeryungjun(會寧殿). Bukgunyeong was the first demolished building in Suwon Hwaseong. Nangnamheon and Hwaryungjun were not destroyed during Japanese Colonial Period. from 1910s to 1930s most official buildings were demolished and new buildings were rebuilt.
This paper examines the changing roles of ownership in the economic growth by using a panel data set of 30 provinces in China for the period (1999-2010). With the use of absolute and relative presence variables, this study shows that private enterprises have emerged as the engine of economic growth in China in the later period (2005-2010). The growing size and number of private enterprises are positively linked to growth. However, though foreign-invested enterprises have been acclaimed as the main contributors to economic growth in China, they have minimal effect on the economic growth in the later period. State-owned enterprises have a significant and negative effect on the economic growth in the later period. The results can be interpreted that the engine of growth in China has been changed over time from other ownerships to private ownership. Private companies have developed a lot in every respect and started to lead the economy for long-run growth. China initiated its economic growth by adopting foreign capital and it is still the top destination for foreign direct investment among developing countries. However, to sustain the growth over a long period, private sector should be of great importance and perform a key role in the view of catch-up economics.
Journal of the Korea Institute of Building Construction
/
v.8
no.2
/
pp.107-112
/
2008
According to Korean Architectural Standard Specification (KASS) , at the design stage of the specified concrete strength, strength correction with each temperature level should be considered to secure required strength at 28 days even in low temperature condition, In this paper, the period for the strength correction at the stage of mixture design of the concrete using ordinary Portland cement(OPC) specified in KASS was determined with each region of south Korea based on the meteorological data of KMA(Korea meteorological administration) by applying KASS-5 regulation. In case of 28 days of strength control age, the period for strength correction with 6MPa was calculated to $50{\sim}60$ days and, with 3 MPa. to around 80 days. The period for the strength correction was shown to be decreased with the rise of altitude. The period to consider the delay of the strength development due to low temperature including the period of cold weather concrete was nearly 7 months around 1 year. References for determining the strength correction factors with each region of south Korea was provided in this paper. Further investigation of strength correction of the concrete containing blended cement is to studied.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.