• Title/Summary/Keyword: Performance objectives

Search Result 1,983, Processing Time 0.028 seconds

A Study on the Exhibitors' Objectives and Choice Attributes of Participating in Trade Fairs Using R-IPA (R-IPA를 활용한 무역박람회 참가업체의 전시회 선택요인과 참가목적에 관한 연구)

  • Kim, Yong-Suk;Jeong, Yoon-Say
    • Korea Trade Review
    • /
    • v.44 no.1
    • /
    • pp.57-73
    • /
    • 2019
  • The purposes of this study are to propose exhibition planning and management skills of trade fair organizers and to provide suggestions on the direction of government policies related to fair items. This study analyzes exhibitor objectives of exhibition participation and exhibition choice attributes using revised importance-performance analysis. This research uses visitor level, organizer services and market attraction of hosting country, as explanatory variables affecting companies' trade show choices. It also utilizes sales and non-sales purposes of participants as variables of exhibitors' objectives. As a result of the empirical analysis and examination of prior research, this study presents some recommendations for exhibition organizers and governments of hosting countries. First, the exhibition organizer should consider the importance of the number of visitors. Thus, the organizer should focus on prior marketing activities to attract visitors. Second, the organizer should make a trade fair plan in compliance with participants' needs. Third, policy authorities should provide environment of free competition among players.

Development of Key Indicators for Nurses Performance Evaluation and Estimation of Their Weights for Management by Objectives (목표관리를 적용한 간호사 성과평가 핵심 지표개발과 가중치 산정)

  • Lee, Eun-Hwa;Ahn, Sung-Hee
    • Journal of Korean Academy of Nursing
    • /
    • v.40 no.1
    • /
    • pp.69-77
    • /
    • 2010
  • This methodological research was designed to develop performance evaluation key indicators (PEKIs) for management by objectives (MBO) and to estimate their weights for hospital nurses. Methods: The PEKIs were developed by selecting preliminary indicators from a literature review, examining content validity and identifying their level of importance. Data were collected from November 14, 2007 to February 18, 2008. Data set for importance of indicators was obtained from 464 nurses and weights of PEKIs domain was from 453 nurses, who worked for at least 2 yr in one of three hospitals. Data were analyzed using $X^2$-test, factor analysis, and the Analytical Hierarchy Process. Results: Based upon Content Validity Index of .8 or above, 61 indicators were selected from the 100 preliminary indicators. Finally, 40 PEKIs were developed from the 61 indicators, and categorized into 10 domains. The highest weight of the 10 domains was customer satisfaction, which was followed by patient education, direct nursing care, profit increase, safety management, improvement of nursing quality, completeness of nursing records, enhancing competence of nurses, indirect nursing care, and cost reduction, in that order. Conclusion: PEKIs and their weights can be utilized for impartial evaluation and MBO for hospital nurses. Further research to verify PEKIs would lead to successful implementation of MBO.

THE IDENTIFICATION OF MALAYSIAN CONTRACTOR SATISFACTION DIMENSIONS: A STRATEGY FOR CONTINUOUS IMPROVEMENT

  • Md Asrul Nasid Masrom;Martin Skitmore;Adrian Bridge
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.335-339
    • /
    • 2011
  • The unique characteristics of the construction industry - such as the fragmentation of its processes, varied scope of works and diversity of its participants - are contributory factors to poor project performance. Several issues are unresolved due to the lack of a comprehensive technique to measure project outcomes including: inefficient decision making, insufficient communication, uncertain site conditions, a continuously changing environment, inharmonious working relationships, mismatched objectives within the project team and a blame culture. One approach to overcoming these problems appears to be to measure performance by gauging contractor satisfaction (Co-S) levels, but this has not been widely investigated as yet. Additionally, the key Co-S dimensions at the project level are still not fully identified. This paper concerns a study of satisfaction dimensions, primarily by a postal questionnaire survey of construction contractors registered by the Malaysian Construction Industry Development Board (CIDB). Eight satisfaction dimensions are identified that are significantly and substantially relate to these contractors - comprising: project cost performance, schedule performance, product performance, design satisfaction, site safety, project profitability, business performance and relationships between participants. -Each of these dimensions is accorded different priority levels of satisfaction by different contractors. The output of this study will be useful in raising the awareness and understanding of project teams regarding contractors' needs, mutual objectives and open communication to help to deliver a successful project.

  • PDF

Some Considerations for the Fire Safe Design of Tall Buildings

  • Cowlard, Adam;Bittern, Adam;Abecassis-Empis, Cecilia;Torero, Jose L.
    • International Journal of High-Rise Buildings
    • /
    • v.2 no.1
    • /
    • pp.63-77
    • /
    • 2013
  • In any subject area related to the provision of safety, failure is typically the most effective mechanism for evoking rapid reform and an introspective assessment of the accepted operating methods and standards within a professional body. In the realm of tall buildings the most notable failures in history, those of the WTC towers, widely accepted as fire induced failures, have not to any significant extent affected the way they are designed with respect to fire safety. This is clearly reflected in the surge in numbers of Tall Buildings being constructed since 2001. The combination of the magnitude and time-scale of the WTC investigation coupled with the absence of meaningful guidance resulting from it strongly hints at the outdatedness of current fire engineering practice as a discipline in the context of such advanced infrastructure. This is further reflected in the continual shift from prescriptive to performance based design in many parts of the world demonstrating an ever growing acceptance that these buildings are beyond the realm of applicability of prescriptive guidance. In order for true performance based engineering to occur however, specific performance goals need to be established for these structures. This work seeks to highlight the critical elements of a fire safety strategy for tall buildings and thus attempt to highlight some specific global performance objectives. A survey of tall building fire investigations is conducted in order to assess the effectiveness of current designs in meeting these objectives, and the current state-of-the-art of fire safety design guidance for tall structures is also analysed on these terms. The correct definition of the design fire for open plan compartments is identified as the critical knowledge gap that must be addressed in order to achieve tall building performance objectives and to provide truly innovative, robust fire safety for these unique structures.

Analysis on the error performance objective for turbo codes in the DVB-RCS system (DVB-RCS 시스템에서 터보 부호의 오류성능 목표 분석)

  • Yeo, Seong-Mun;Kim, Su-Yeong
    • Journal of Satellite, Information and Communications
    • /
    • v.1 no.2
    • /
    • pp.51-55
    • /
    • 2006
  • Digital satellite communication systems are usually integrated with terrestrial systems to provide various services. In these cases, they should satisfy the performance objectives defined by the terrestrial systems. Recommendation ITU-R S.1062 specifies the error performance objectives of digital satellite communication systems operating below 15 GHz. The error performance are given in terms of bit error probability divided by the number of the average bit errors in the burst ($\alpha$). This paper presents a theoretical method to estimate $\alpha$ that is a very important parameter in the satellite communication systems to analyze the error performance objectives. We show performance estimation result of DVB-RCS turbo code using the presented method, and verify them by comparing to the simulation results.

  • PDF

A Study for Design of Distribution Center using Compromise Programming (Compromise Programming을 이용한 물류센터 설계에 관한 연구)

  • Heo Byoung-Wan;Lee Hong-Chul
    • Journal of the Korea Society for Simulation
    • /
    • v.14 no.3
    • /
    • pp.43-54
    • /
    • 2005
  • For the effective design of automated distribution center composed of Automated Storage/Retrieval System, Automated Guided Vehicle System, and Conveyor System, we proposed an analysis method to determining. design and control parameters with multiple performance objectives using Compromise Programming, which can resolve the dilemma of conflicting objectives. The Evolution Strategy generates the optimal solutions for each objectives. The Analytic Hierarchy Process selects the best solution among the alternatives generated from Evolution Strategy. The Regression Analysis formulates the objective functions for each objectives. By reducing deviations between goal values and target values generated from Analytic Hierarchy Process, Compromise Programming determines design and control parameters by compromising the multiple objectives formulated using Regression Analysis. When the parameters of system are changed, this proposed analysis method has a benefit of reducing costs and time without repeating whole simulation run.

  • PDF

A Strategic Quality Initiative and Its Opportunities to Improve Healthcare Environment (진료환경개선을 위한 우선적 전략과제 설정 및 그 적용)

  • Tark, Kwan-Chul;Park, Hyun-Ju;Park, Chang-Il;Kang, Jin-Kyung
    • Quality Improvement in Health Care
    • /
    • v.5 no.2
    • /
    • pp.324-334
    • /
    • 1998
  • Background : Strategic planning is an organizationwide or systemwide, ongoing look into the future usually of 2~3 years, based on objective analysis of the current environment and trends, but it can incorporate both short-term and long-term goals. The strategic planning process includes external analysis, internal analysis, issue analysis, development of mission, vision and values, and lastly development of organizational goals and objectives. As a part of the strategic quality planning process, certain service lines, important organizationwide functions, or key processes supporting these functions can be prioritized to expedite and roll out certain strategic goals. This is called strategic quality initiatives. Methods : We organized a quality improvement team, a subgroup of 21st century vision planning corps of our medical center, and pursued QI activities for improvement of healthcare environment, particularly in the admission setting. We developed a strategic quality initiative based on the results of patient satisfaction surveys, and carried out functions of self-directed work team. Results : The strategic goal was to be the benchmark for peer group hospitals in Korea for providing cost-effective best-practice. The QI team included 3 medical doctors, 1 nurse, 1 social worker, and 1 QI consultant as well as many operational members to support services and quality initiatives met every Tuesday for 18 weeks. Outcome objectives were to improve patient satisfaction score. The issues included in the objectives were comfort, temperature, noise, cleanliness of the admission wards, quality and education of patient meals, matters regarding the admission process, and an appurtenant facility such as restaurant or convenience store. Every issue was discussed and recommendations, conclusions and opportunities were implemented. Conclusions : By developing a strategic quality initiative as a part of the strategic quality planning process, and pursuing a self-directed work team, certain sen/ice lines, important organizationwide functions, or key processes supporting these functions can be improved effectively within a short period. Strategic quality initiatives serve to support, or roll out, certain strategic goals that are relevant to performance improvement and development of specific measurable outcome objectives, and associated performance measure for each initiative. Each strategic quality initiative should include a statement of intent outcome objectives, and performance measures. We will come back with follow up of the strategic quality initiative, for improvement of healthcare environment, and results of patient satisfaction re-survey.

  • PDF

Seismic Performance Evaluation of Unreinforced Masonry Buildings Retrofitted by Strengthening External Walls (외부벽체 강도증진형 보강이 적용된 비보강 조적조 건물의 내진성능평가)

  • Seol, Yun Jeong;Park, Ji-Hun
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.24 no.2
    • /
    • pp.77-86
    • /
    • 2020
  • Nonlinear static analysis and preliminary evaluation were performed in this study to evaluate the seismic performance of unreinforced masonry buildings subjected to various soil conditions based on the revised Korean Building Code. Preliminary evaluation scores and nonlinear static analyses indicated that all buildings were susceptible to collapse and did not reach their target performance. Therefore, retrofit of those building models was carried out through a systematic procedure to determine areas to be strengthened. It was possible to make most building models satisfy performance objectives through the reinforcement alone of damaged external shear walls. However, the application of a preliminary evaluation procedure to retrofit design was found to be too conservative because all the retrofitted building models verified with nonlinear static analysis failed to satisfy performance objectives. Therefore, it is possible to economically retrofit unreinforced masonry buildings through the fortification of external walls if a simple evaluation procedure that can efficiently specify vulnerable parts is developed.

Optimal design of bio-inspired isolation systems using performance and fragility objectives

  • Hu, Fan;Shi, Zhiguo;Shan, Jiazeng
    • Structural Monitoring and Maintenance
    • /
    • v.5 no.3
    • /
    • pp.325-343
    • /
    • 2018
  • This study aims to propose a performance-based design method of a novel passive base isolation system, BIO isolation system, which is inspired by an energy dissipation mechanism called 'sacrificial bonds and hidden length'. Fragility functions utilized in this study are derived, indicating the probability that a component, element, or system will be damaged as a function of a single predictive demand parameter. Based on PEER framework methodology for Performance-Based Earthquake Engineering (PBEE), a systematic design procedure using performance and fragility objectives is presented. Base displacement, superstructure absolute acceleration and story drift ratio are selected as engineering demand parameters. The new design method is then performed on a general two degree-of-freedom (2DOF) structure model and the optimal design under different seismic intensities is obtained through numerical analysis. Seismic performances of the biologically inspired (BIO) isolation system are compared with that of the linear isolation system. To further demonstrate the feasibility and effectiveness of this method, the BIO isolation system of a 4-storey reinforced concrete building is designed and investigated. The newly designed BIO isolators effectively decrease the superstructure responses and base displacement under selected earthquake excitations, showing good seismic performance.

Suggestions for Improvement of Industrial High School Education Based on the Value of Competency-Based Education (능력 중심 교육의 가치가 공업계 고등학교 교육의 운영 개선에 주는 시사점)

  • Kim, Hee-Pil
    • 대한공업교육학회지
    • /
    • v.30 no.2
    • /
    • pp.33-44
    • /
    • 2005
  • The purpose of this study is to suggest plans to improve the industrial high school through the inquiry of Competency-Based Education(CBE). The suggestions are as followings: (1) Selection and organization of the educational contents of industrial high school must be based on job analysis. (2) Instructional objectives must be defined as a performance objective and enabling objectives. (3) Instruction must be individualized in method, the instructional contents must be organized in the unit of module. (4) Evaluation system must be not knowledge based but performance-based. (5) Physical Environment of work shop must be organized based on facilities, equipments and machines abstracted by job analysis. (6) Competency-Based Teacher Education(CBTE) program is required to train competent teachers in practice.